ELEVATOR MECHANIC. FOOTNOTE leads the building schedule for Racine County, WI at $61.96 base plus $38.44 fringe. The active federal wage determination covering building construction in Racine County, WI lists 36 classifications with published rates, base pay from $0.50 to $61.96 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.88 | $38.15 | WI20260009 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 | WI20260009 |
| BOILERMAKER(BOILERMAKER) | $46.52 | $34.63 | WI20260009 |
| BRICKLAYER |
The highest published base on this schedule belongs to ELEVATOR MECHANIC. FOOTNOTE at $61.96 per hour plus $38.44 fringe; the schedule's median base is $44.21.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
86% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example WI20260009 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $44.71 |
| $28.90 |
| WI20260009 |
| CARPENTER & SOFT FLOOR LAYER(INCLUDING ACOUSTICAL WORK AND DRYWALL HANGING; EXCLUDING BATT INSULATION) | $45.46 | $31.52 | WI20260009 |
| CEMENT MASON/CONCRETE FINISHER | $38.04 | $31.38 | WI20260009 |
| ELECTRICIAN(EXCEPT BURLINGTON TOWNSHIP) | $48.50 | $26.25 | WI20260009 |
| ELECTRICIAN(BURLINGTON TOWNSHIP) | $43.65 | $23.59 | WI20260009 |
| ELECTRICIANSTELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK) | $31.17 | $20.08 | WI20260009 |
| ELEVATOR MECHANIC. FOOTNOTEA. PAID VACATION: 8% OF REGULAR BASIC FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $61.96 | $38.44 | WI20260009 |
| GLAZIER | $49.79 | $25.15 | WI20260009 |
| IRONWORKER. PAID HOLIDAYSNEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $47.52 | $33.67 | WI20260009 |
| LABORER(GENERAL LABORER) | $38.71 | $24.42 | WI20260009 |
| LABORER(PLASTER LABORER, MASON TENDER) | $38.92 | $24.42 | WI20260009 |
| LABORERASBESTOS/HAZARDOUS MATERIAL REMOVER (PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $31.67 | $24.68 | WI20260009 |
| LABORERSLANDSCAPE | $8.73 | $4.90 | WI20260009 |
| LABORERSCONCRETE WORKER | $16.34 | $3.59 | WI20260009 |
| MILLWRIGHT | $44.03 | $32.94 | WI20260009 |
| PAINTERS(BRUSH, ROLLER, DRYWALL FINISHER) | $43.64 | $23.35 | WI20260009 |
| PAINTERS(SPRAY, SANDBLAST) | $44.64 | $23.35 | WI20260009 |
| PER HOUR PER 100 TONS OR 100 FT OF BOOM OVER 200 FT OR LIFTING CAPACITY OFCRANE OVER 200 TONS TO A MAXIMUM OF 300 TONS OR 300 FT. THEREAFTER AN INCREASE OF $0.01 PER FT OR TON, WHICHEVER IS GREATER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $55.21 | $28.55 | WI20260009 |
| PILEDRIVERMAN | $44.39 | $34.79 | WI20260009 |
| PLASTERER | $37.20 | $30.92 | WI20260009 |
| PLUMBER/PIPEFITTER(INCLUDING HVAC WORK) | $57.35 | $29.37 | WI20260009 |
| POWER EQUIPMENT OPERATORGROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC | $0.50 | ADDITIONAL | WI20260009 |
| POWER EQUIPMENT OPERATORGROUP 2 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF 100 TONS OR LESS; OR CRANES, TOWER CRANES PORTABLE TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADSAND/OR JIB LENGTHS MEASURING 175 FEET OR LESS; BACKHOES (EXCAVATORS) 130,000 LBS AND OVER; CAISSON RIGS; PILE DRIVERS; BORING MACHINES (VERTICAL OR HORIZONTAL), VERSI-LIFT, TRI-LIFT, GANTRY 20,000 LBS & OVER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND W | $54.71 | $28.55 | WI20260009 |
| POWER EQUIPMENT OPERATORGROUP 3 BACKHOE (EXCAVATOR) UNDER 130,000 LBS;SELF-ERECTING TOWER CRANE 4000 LBS & UNDER LIFTING CAPACITY;TRAVELING CRANE (BRIDGE TYPE); SKID RIGS; DREDGE OPERATOR; MECHANIC; CONCRETE PAVER (OVER 27E); CONCRETE SPREADER AND DISTRIBUTOR; FORKLIFT/ TELEHANDLER (MACHINERY- MOVING / STEEL ERECTION); HYDRO BLASTER, 10,000 PSI AND OVER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTIO | $54.21 | $28.55 | WI20260009 |
| POWER EQUIPMENT OPERATORGROUP 4 MATERIAL HOISTS; STACK HOISTS; HYDRAULIC BACKHOE (TRACTOR OR TRUCK MOUNTED); HYDRAULIC CRANE, 5 TONS OR UNDER (TRACTOR OR TRUCK MOUNTED); HOIST (TUGGERS 5 TONS & OVER); HYDRO-EXCAVATORS/DAYLIGHTERS; CONCRETE PUMPS ROTEC TYPE CONVEYORS; TRACTOR/BULLDOZER/END LOADER (OVER 40 HP); MOTOR PATROL; SCRAPER OPERATOR; SIDEBOOM; STRADDLE CARRIER; WELDER; BITUMINOUS PLANT AND PAVER OPERATOR; ROLLER OVER 5 TONS; RAIL LEVELING MACHINE (RAILROAD); TIE PLACER; TIE EXTRACTOR; TIE TAMPER; STONE LEVELER; | $52.72 | $28.55 | WI20260009 |
| POWER EQUIPMENT OPERATORGROUP 5 BACKFILLER; CONCRETE AUTO BREAKER (LARGE); CONCRETE FINISHING MACHINES (ROAD TYPE); RUBBER TIRED ROLLER; CONCRETE BATCH HOPPER; CONCRETE CONVEYOR SYSTEMS; GROUT PUMPS; CONCRETE MIXERS (14S OR OVER); SCREW TYPE PUMPS AND GYPSUM PUMPS; TRACTOR, BULLDOZER, END LOADER (UNDER 40 HP); TRENCHER (CHAIN TYPE, BUCKET UNDER 8 INCH); INDUSTRIAL LOCOMOTIVES; ROLLERS UNDER 5 TONS; STUMP GRINDER/CHIPPER (LARGE); TIMBER EQUIPMENT; FIREMEN (PILE DRIVERS AND DERRICKS); PERSONNEL HOIST, TELEHANDLER OVER 80 | $48.74 | $28.55 | WI20260009 |
| POWER EQUIPMENT OPERATORGROUP 6 TAMPERS - COMPACTORS (RIDING TYPE); ASSISTANT ENGINEER; A-FRAMES AND WINCH TRUCKS; CONCRETE AUTO BREAKER; HYDROHAMMERS (SMALL); BROOMS AND SWEEPERS; HOIST (TUGGERS UNDER 5 TONS); BOATS (TUG, SAFETY, WORK BARGES, LAUNCH); SHOULDERING MACHINE OPERATOR; PRESTRESS MACHINES; SCREED OPERATOR; STONE CRUSHERS AND SCREENING PLANTS; SCREED OPERATORS (MILLING MACHINE), FARM OR INDUSTRIAL TRACTOR MOUNTED EQUIPMENT; POST HOLE DIGGER; FIREMAN (ASPHALT PLANTS); AIR COMPRESSORS OVER 400 CFM; GENERATORS, | $43.59 | $28.55 | WI20260009 |
| ROOFER | $18.01 | $3.28 | WI20260009 |
| SHEET METAL WORKER | $48.92 | $38.21 | WI20260009 |
| SPRINKLER FITTER | $51.68 | $29.73 | WI20260009 |
| TILE & MARBLE FINISHER | $13.89 | $8.60 | WI20260009 |
| TILE SETTER | $39.19 | $28.90 | WI20260009 |
| TRUCK DRIVER(3 OR MORE AXLES) | $39.72 | $28.70 | WI20260009 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.