Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Wisconsin: Racine. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0019-001 | ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.88 | $38.15 |
| SUWI2002-006 | ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 |
| BOIL0107-001 | BOILERMAKER(BOILERMAKER) | $46.52 | $34.63 |
| BRWI0004-001 | BRICKLAYER | $44.71 | $28.90 |
| CARP0231-001 | CARPENTER & SOFT FLOOR LAYER(INCLUDING ACOUSTICAL WORK AND DRYWALL HANGING; EXCLUDING BATT INSULATION) | $45.46 | $31.52 |
| PLAS0599-009 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CEMENT MASON/CONCRETE FINISHER |
| $38.04 |
| $31.38 |
| ELEC0430-001 | ELECTRICIAN(EXCEPT BURLINGTON TOWNSHIP) | $48.50 | $26.25 |
| ELEC0890-002 | ELECTRICIAN(BURLINGTON TOWNSHIP) | $43.65 | $23.59 |
| ELEC0014-005 | ELECTRICIANSTELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK) | $31.17 | $20.08 |
| ELEV0015-001 | ELEVATOR MECHANIC. FOOTNOTEA. PAID VACATION: 8% OF REGULAR BASIC FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $61.96 | $38.44 |
| PAIN1204-002 | GLAZIER | $49.79 | $25.15 |
| IRON0008-005 | IRONWORKER. PAID HOLIDAYSNEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $47.52 | $33.67 |
| LABO0113-012 | LABORER(GENERAL LABORER) | $38.71 | $24.42 |
| LABO0113-012 | LABORER(PLASTER LABORER, MASON TENDER) | $38.92 | $24.42 |
| LABO0113-012 | LABORERASBESTOS/HAZARDOUS MATERIAL REMOVER (PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $31.67 | $24.68 |
| SUWI2002-006 | LABORERSLANDSCAPE | $8.73 | $4.90 |
| SUWI2002-006 | LABORERSCONCRETE WORKER | $16.34 | $3.59 |
| CARP2337-006 | MILLWRIGHT | $44.03 | $32.94 |
| PAIN0108-001 | PAINTERS(BRUSH, ROLLER, DRYWALL FINISHER) | $43.64 | $23.35 |
| PAIN0108-001 | PAINTERS(SPRAY, SANDBLAST) | $44.64 | $23.35 |
| ENGI0139-001 | PER HOUR PER 100 TONS OR 100 FT OF BOOM OVER 200 FT OR LIFTING CAPACITY OFCRANE OVER 200 TONS TO A MAXIMUM OF 300 TONS OR 300 FT. THEREAFTER AN INCREASE OF $0.01 PER FT OR TON, WHICHEVER IS GREATER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $55.21 | $28.55 |
| CARP2337-007 | PILEDRIVERMAN | $44.39 | $34.79 |
| PLAS0599-009 | PLASTERER | $37.20 | $30.92 |
| PLUM0118-001 | PLUMBER/PIPEFITTER(INCLUDING HVAC WORK) | $57.35 | $29.37 |
| ENGI0139-001 | POWER EQUIPMENT OPERATORGROUP 1 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR W/O ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; OR CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS MEASURING 176 FEET OR LONGER; SELF-ERECTING TOWER CRANES OVER 4000 LBS LIFTING CAPACITY; ALL CRANES WITH BOOM DOLLIES; BORING MACHINES (DIRECTIONAL); MASTER MECHANIC | $0.50 | ADDITIONAL |
| ENGI0139-001 | POWER EQUIPMENT OPERATORGROUP 2 CRANES, TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF 100 TONS OR LESS; OR CRANES, TOWER CRANES PORTABLE TOWER CRANES, PEDESTAL TOWER CRANES AND DERRICKS WITH BOOM, LEADSAND/OR JIB LENGTHS MEASURING 175 FEET OR LESS; BACKHOES (EXCAVATORS) 130,000 LBS AND OVER; CAISSON RIGS; PILE DRIVERS; BORING MACHINES (VERTICAL OR HORIZONTAL), VERSI-LIFT, TRI-LIFT, GANTRY 20,000 LBS & OVER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND W | $54.71 | $28.55 |
| ENGI0139-001 | POWER EQUIPMENT OPERATORGROUP 3 BACKHOE (EXCAVATOR) UNDER 130,000 LBS;SELF-ERECTING TOWER CRANE 4000 LBS & UNDER LIFTING CAPACITY;TRAVELING CRANE (BRIDGE TYPE); SKID RIGS; DREDGE OPERATOR; MECHANIC; CONCRETE PAVER (OVER 27E); CONCRETE SPREADER AND DISTRIBUTOR; FORKLIFT/ TELEHANDLER (MACHINERY- MOVING / STEEL ERECTION); HYDRO BLASTER, 10,000 PSI AND OVER. (KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA COUNTIES) HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTIO | $54.21 | $28.55 |
| ENGI0139-001 | POWER EQUIPMENT OPERATORGROUP 4 MATERIAL HOISTS; STACK HOISTS; HYDRAULIC BACKHOE (TRACTOR OR TRUCK MOUNTED); HYDRAULIC CRANE, 5 TONS OR UNDER (TRACTOR OR TRUCK MOUNTED); HOIST (TUGGERS 5 TONS & OVER); HYDRO-EXCAVATORS/DAYLIGHTERS; CONCRETE PUMPS ROTEC TYPE CONVEYORS; TRACTOR/BULLDOZER/END LOADER (OVER 40 HP); MOTOR PATROL; SCRAPER OPERATOR; SIDEBOOM; STRADDLE CARRIER; WELDER; BITUMINOUS PLANT AND PAVER OPERATOR; ROLLER OVER 5 TONS; RAIL LEVELING MACHINE (RAILROAD); TIE PLACER; TIE EXTRACTOR; TIE TAMPER; STONE LEVELER; | $52.72 | $28.55 |
| ENGI0139-001 | POWER EQUIPMENT OPERATORGROUP 5 BACKFILLER; CONCRETE AUTO BREAKER (LARGE); CONCRETE FINISHING MACHINES (ROAD TYPE); RUBBER TIRED ROLLER; CONCRETE BATCH HOPPER; CONCRETE CONVEYOR SYSTEMS; GROUT PUMPS; CONCRETE MIXERS (14S OR OVER); SCREW TYPE PUMPS AND GYPSUM PUMPS; TRACTOR, BULLDOZER, END LOADER (UNDER 40 HP); TRENCHER (CHAIN TYPE, BUCKET UNDER 8 INCH); INDUSTRIAL LOCOMOTIVES; ROLLERS UNDER 5 TONS; STUMP GRINDER/CHIPPER (LARGE); TIMBER EQUIPMENT; FIREMEN (PILE DRIVERS AND DERRICKS); PERSONNEL HOIST, TELEHANDLER OVER 80 | $48.74 | $28.55 |
| ENGI0139-001 | POWER EQUIPMENT OPERATORGROUP 6 TAMPERS - COMPACTORS (RIDING TYPE); ASSISTANT ENGINEER; A-FRAMES AND WINCH TRUCKS; CONCRETE AUTO BREAKER; HYDROHAMMERS (SMALL); BROOMS AND SWEEPERS; HOIST (TUGGERS UNDER 5 TONS); BOATS (TUG, SAFETY, WORK BARGES, LAUNCH); SHOULDERING MACHINE OPERATOR; PRESTRESS MACHINES; SCREED OPERATOR; STONE CRUSHERS AND SCREENING PLANTS; SCREED OPERATORS (MILLING MACHINE), FARM OR INDUSTRIAL TRACTOR MOUNTED EQUIPMENT; POST HOLE DIGGER; FIREMAN (ASPHALT PLANTS); AIR COMPRESSORS OVER 400 CFM; GENERATORS, | $43.59 | $28.55 |
| SUWI2002-006 | ROOFER | $18.01 | $3.28 |
| SHEE0018-028 | SHEET METAL WORKER | $48.92 | $38.21 |
| SFWI0669-002 | SPRINKLER FITTER | $51.68 | $29.73 |
| SUWI2002-006 | TILE & MARBLE FINISHER | $13.89 | $8.60 |
| BRWI0004-001 | TILE SETTER | $39.19 | $28.90 |
| TEAM0662-003 | TRUCK DRIVER(3 OR MORE AXLES) | $39.72 | $28.70 |