PLUMBERS AND PIPEFITTERS leads the heavy schedule for Wallowa County, OR at $65.20 base plus $34.91 fringe. The active federal wage determinations covering heavy construction in Wallowa County, OR list 53 classifications with published rates, base pay from $19.31 to $65.20 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| CARPENTER(EXCLUDING FORM WORK) | $53.94 | $16.81 | OR20260080 |
| CARPENTER(FORM WORK ONLY) | $23.50 | $9.27 | OR20260080 |
| CEMENT MASON/CONCRETE FINISHER | $21.13 | $8.90 | OR20260080 |
| DREDGINGASSISTANT ENGINEER ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT |
Across the 53 published classifications for heavy work in Wallowa County, OR, base pay spans $19.31 to $65.20 per hour with a median of $50.27.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
This schedule mixes sources: 70% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example OR20260080 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $53.31 |
| $16.70 |
| OR20260081 |
| DREDGINGTENDERMAN ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: TENDERMAN ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $57.82 | $16.70 | OR20260081 |
| DREDGINGTENDERMAN ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: TENDERMAN ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $54.82 | $16.70 | OR20260081 |
| DREDGINGTENDERMAN ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: TENDERMAN ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $51.82 | $16.70 | OR20260081 |
| DREDGINGLEVERMAN, HYDRAULIC ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL.*ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: LEVERMAN, HYDRAULIC ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL.*ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $62.47 | $16.70 | OR20260081 |
| DREDGINGLEVERMAN, HYDRAULIC ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: LEVERMAN, HYDRAULIC ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $59.47 | $16.70 | OR20260081 |
| DREDGINGLEVERMAN, HYDRAULIC ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: LEVERMAN, HYDRAULIC ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $56.47 | $16.70 | OR20260081 |
| DREDGINGLEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $59.47 | $16.70 | OR20260081 |
| DREDGINGLEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $56.47 | $16.70 | OR20260081 |
| DREDGINGASSISTANT MATE ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: ASSISTANT MATE ZONE A - ALL JOBS OR PROJECTS LOCATED WITHIN 30 ROAD MILES OF PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $47.95 | $16.70 | OR20260081 |
| DREDGINGASSISTANT ENGINEER ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: ASSISTANT ENGINEER ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $59.31 | $16.70 | OR20260081 |
| DREDGINGASSISTANT ENGINEER ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: ASSISTANT ENGINEER ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $56.31 | $16.70 | OR20260081 |
| DREDGINGLEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $62.47 | $16.70 | OR20260081 |
| DREDGINGASSISTANT MATE ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL.*ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: ASSISTANT MATE ZONE C - OVER 60 ROAD MILES FROM PORTLAND CITY HALL.*ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $53.95 | $16.70 | OR20260081 |
| DREDGINGASSISTANT MATE ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECTDREDGING: ASSISTANT MATE ZONE B - OVER 30-60 ROAD MILES FROM PORTLAND CITY HALL. *ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT | $50.95 | $16.70 | OR20260081 |
| ELECTRICIAN(SHERMAN COUNTY) | $63.50 | $29.73 | OR20260080 |
| ELECTRICIAN(BAKER, GILLIAM, WALLOWA AND WHEELER COUNTIES) | $60.00 | $27.78 | OR20260080 |
| ELECTRICIAN(CROOK COUNTY) | $56.46 | $23.05 | OR20260080 |
| ELECTRICIAN(HARNEY AND LAKE COUNTIES) | $47.04 | $21.84 | OR20260080 |
| IRONWORKER(REINFORCING AND STRUCTURAL) | $48.31 | $34.52 | OR20260080 |
| LABORERCOMMON OR GENERAL | $22.29 | $6.04 | OR20260080 |
| LABORERFENCE ERECTION | $23.88 | $7.45 | OR20260080 |
| LABORERFLAGGER | $19.31 | $5.31 | OR20260080 |
| LABORERPIPELAYER | $20.52 | $4.51 | OR20260080 |
| LABORERS(MASON TENDER-CEMENT/CONCRETE) | $43.79 | $17.05 | OR20260080 |
| LABORERSGROUP 1 ASPHALT SPREADER | $39.11 | $17.30 | OR20260080 |
| LABORERSGROUP 2 GRADE CHECKER | $40.41 | $17.30 | OR20260080 |
| LINE CONSTRUCTIONGROUNDMAN | $31.36 | $7.27 | OR20260080 |
| MILLWRIGHT | $59.35 | $22.38 | OR20260080 |
| OPERATOREXCAVATOR | $30.12 | $6.23 | OR20260080 |
| OPERATORBACKHOE | $29.80 | $7.13 | OR20260080 |
| OPERATORBOBCAT/SKID STEER/SKID LOADER | $22.77 | $7.90 | OR20260080 |
| OPERATORBROOM/SWEEPER | $32.31 | $6.43 | OR20260080 |
| OPERATORLOADER | $32.31 | $6.43 | OR20260080 |
| OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.59 | $2.96 | OR20260080 |
| PAINTERS(BRUSH, ROLLER AND SPRAY) | $39.94 | $16.68 | OR20260080 |
| PLUMBERS AND PIPEFITTERS(CROOK, GILLIAM, HARNEY (THOSE PORTIONS WHICH LIES NORTH AND WEST OF A NORTH-SOUTH LINE DRAWN FROM THE TOWN OF JOHN DAY TO A POINT FIVE MILES EAST OF THE TOWN OF BURNS AND THREE MILES SOUTH OF BURNS THENCE ON AN AIRLINE THROUGH THE TOWN OF WAGONTIRE WEST TO THE COUNTY LINES), LAKE, SHERMAN AND WHEELER COUNTIES) | $60.77 | $34.72 | OR20260080 |
| PLUMBERS AND PIPEFITTERS(BAKER AND HARNEY (REMAINDER OF COUNTY) COUNTIES) | $39.90 | $18.67 | OR20260080 |
| PLUMBERS AND PIPEFITTERS(WALLOWA COUNTY) | $65.20 | $34.91 | OR20260080 |
| POWER EQUIPMENT OPERATOR GROUP 1A HYDRAULIC CRANEHYDRAULIC OPERATOR, 200 TONS AND OVER (WITH LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANE: OPERATOR, 200 TONS THROUGH 299 TONS, WITH OVER 200 FEET BOOM; | $58.82 | $16.90 | OR20260080 |
| POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANEOPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER | $60.98 | $16.90 | OR20260080 |
| POWER EQUIPMENT OPERATOR GROUP 1 CRANEHELICOPTER OPERATOR, WHEN USED IN ERECTING WORK; WHIRLEY OPERATOR, 90 TON AND OVER; LATTICE BOOM CRANE: OPERATOR 200 TONS THROUGH 299 TONS, AND/OR OVER 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS WITH LUFFING OR TOWER ATTACHMENTS; | $56.66 | $16.90 | OR20260080 |
| POWER EQUIPMENT OPERATOR GROUP 2 CRANECABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); TOWER/WHIRLEY OPERATOR: TOWER CRANE OPERATOR; WHIRLEY OPERATOR, UNDER 90 TONS; LATTICE BOOM CRANE: 90 THROUGH 199 TONS AND/OR 150 TO 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITH LUFFING OR TOWER ATTACHMENT); RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS; BLADE: AUTO GRADER; BLADE OPERATOR-ROBOTIC; BULLDOZER OVER 120, | $54.75 | $16.90 | OR20260080 |
| POWER EQUIPMENT OPERATOR GROUP 3 HYDRAULIC CRANEHYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANES: LATTICE BOOM CRANE-50 THROUGH 89 TONS (AND LESS THAN 150 FEET BOOM); RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS; BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS; | $53.60 | $16.90 | OR20260080 |
| POWER EQUIPMENT OPERATOR GROUP 4 CRANEHYDRAULIC CRANE OPERATOR, UNDER 50 TONS; LATTICE BOOM CRANE OPERATOR: LATTICE BOOM CRANE OPERATOR, UNDER 50 TONS; TRACKHOE-ROBOTIC: TRACK AND WHEEL TYPE, UP TO AND INCLUDING 20,0000 LBS. WITH ANY OR ALL ATTACHMENTS; BLADE: BLADE OPERATOR; TRACTOR OPERATOR WITH BOOM ATTACHMENT; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR OVER 20,000 LBS PULLBACK; CRANE: CHICAGO BOOM AND SIMILAR TYPES; BOOM TYPE LIFTING DEVICE, 5 TON CAPACITY OR LESS; RUBBER-TIRED SCRAPER, S | $50.27 | $16.90 | OR20260080 |
| POWER EQUIPMENT OPERATOR GROUP 5 TRACKHOE-HYDRAULICTRACK TYPE UP TO AND INCLUDING 20,000 LBS, WHEEL TYPE (FORD, JOHN DEER, CASE TYPE); BOOM TRUCK OPERATOR; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR LESS THAN 20,000 LBS PULLBACK; FORKLIFT OVER 5 TON, BULLDOZER 20,000 LBS OR 100 HORSES OR LESS; ROLLER; COMPACTOR WITHOUT BLADE; HOIST OPERATOR SINGLE DRUM | $49.03 | $16.90 | OR20260080 |
| POWER EQUIPMENT OPERATOR GROUP 6 OILER; GRADE CHECKER; CRANE OILER; FORKLIFT; ROLLER(NON-ASPHALT) | $45.81 | $16.90 | OR20260080 |
| TRUCK DRIVERWATER TRUCK | $26.12 | $6.53 | OR20260080 |
| TRUCK DRIVERDUMP TRUCK | $23.79 | $5.95 | OR20260080 |
| TRUCK DRIVEROFF THE ROAD TRUCK | $31.81 | $6.33 | OR20260080 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.