Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 8 counties in Oregon: Baker, Crook, Gilliam, Harney, Lake, Sherman, Wallowa, Wheeler. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0503-019 | CARPENTER(EXCLUDING FORM WORK) | $53.94 | $16.81 |
| SUOR2009-078 | CARPENTER(FORM WORK ONLY) | $23.50 | $9.27 |
| SUOR2009-078 | CEMENT MASON/CONCRETE FINISHER | $21.13 | $8.90 |
| ELEC0048-028 | ELECTRICIAN(SHERMAN COUNTY) | $63.50 | $29.73 |
| ELEC0112-018 | ELECTRICIAN(BAKER, GILLIAM, WALLOWA AND WHEELER COUNTIES) | $60.00 | $27.78 |
| ELEC0280-024 | ELECTRICIAN(CROOK COUNTY) | $56.46 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $23.05 |
| ELEC0659-022 | ELECTRICIAN(HARNEY AND LAKE COUNTIES) | $47.04 | $21.84 |
| IRON0029-013 | IRONWORKER(REINFORCING AND STRUCTURAL) | $48.31 | $34.52 |
| SUOR2009-078 | LABORERCOMMON OR GENERAL | $22.29 | $6.04 |
| SUOR2009-078 | LABORERPIPELAYER | $20.52 | $4.51 |
| SUOR2009-078 | LABORERFLAGGER | $19.31 | $5.31 |
| SUOR2009-078 | LABORERFENCE ERECTION | $23.88 | $7.45 |
| LABO0737-005 | LABORERS(MASON TENDER-CEMENT/CONCRETE) | $43.79 | $17.05 |
| LABO0737-031 | LABORERSGROUP 1 ASPHALT SPREADER | $39.11 | $17.30 |
| LABO0737-031 | LABORERSGROUP 2 GRADE CHECKER | $40.41 | $17.30 |
| SUOR2009-078 | LINE CONSTRUCTIONGROUNDMAN | $31.36 | $7.27 |
| CARP0096-006 | MILLWRIGHT | $59.35 | $22.38 |
| SUOR2009-078 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $22.77 | $7.90 |
| SUOR2009-078 | OPERATORBACKHOE | $29.80 | $7.13 |
| SUOR2009-078 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.59 | $2.96 |
| SUOR2009-078 | OPERATOREXCAVATOR | $30.12 | $6.23 |
| SUOR2009-078 | OPERATORLOADER | $32.31 | $6.43 |
| SUOR2009-078 | OPERATORBROOM/SWEEPER | $32.31 | $6.43 |
| PAIN0010-006 | PAINTERS(BRUSH, ROLLER AND SPRAY) | $39.94 | $16.68 |
| PLUM0290-017 | PLUMBERS AND PIPEFITTERS(CROOK, GILLIAM, HARNEY (THOSE PORTIONS WHICH LIES NORTH AND WEST OF A NORTH-SOUTH LINE DRAWN FROM THE TOWN OF JOHN DAY TO A POINT FIVE MILES EAST OF THE TOWN OF BURNS AND THREE MILES SOUTH OF BURNS THENCE ON AN AIRLINE THROUGH THE TOWN OF WAGONTIRE WEST TO THE COUNTY LINES), LAKE, SHERMAN AND WHEELER COUNTIES) | $60.77 | $34.72 |
| PLUM0296-010 | PLUMBERS AND PIPEFITTERS(BAKER AND HARNEY (REMAINDER OF COUNTY) COUNTIES) | $39.90 | $18.67 |
| PLUM0598-021 | PLUMBERS AND PIPEFITTERS(WALLOWA COUNTY) | $65.20 | $34.91 |
| ENGI0701-038 | POWER EQUIPMENT OPERATOR GROUP 1A HYDRAULIC CRANEHYDRAULIC OPERATOR, 200 TONS AND OVER (WITH LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANE: OPERATOR, 200 TONS THROUGH 299 TONS, WITH OVER 200 FEET BOOM; | $58.82 | $16.90 |
| ENGI0701-038 | POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANEOPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER | $60.98 | $16.90 |
| ENGI0701-038 | POWER EQUIPMENT OPERATOR GROUP 1 CRANEHELICOPTER OPERATOR, WHEN USED IN ERECTING WORK; WHIRLEY OPERATOR, 90 TON AND OVER; LATTICE BOOM CRANE: OPERATOR 200 TONS THROUGH 299 TONS, AND/OR OVER 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS WITH LUFFING OR TOWER ATTACHMENTS; | $56.66 | $16.90 |
| ENGI0701-038 | POWER EQUIPMENT OPERATOR GROUP 2 CRANECABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); TOWER/WHIRLEY OPERATOR: TOWER CRANE OPERATOR; WHIRLEY OPERATOR, UNDER 90 TONS; LATTICE BOOM CRANE: 90 THROUGH 199 TONS AND/OR 150 TO 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITH LUFFING OR TOWER ATTACHMENT); RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS; BLADE: AUTO GRADER; BLADE OPERATOR-ROBOTIC; BULLDOZER OVER 120, | $54.75 | $16.90 |
| ENGI0701-038 | POWER EQUIPMENT OPERATOR GROUP 3 HYDRAULIC CRANEHYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANES: LATTICE BOOM CRANE-50 THROUGH 89 TONS (AND LESS THAN 150 FEET BOOM); RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS; BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS; | $53.60 | $16.90 |
| ENGI0701-038 | POWER EQUIPMENT OPERATOR GROUP 4 CRANEHYDRAULIC CRANE OPERATOR, UNDER 50 TONS; LATTICE BOOM CRANE OPERATOR: LATTICE BOOM CRANE OPERATOR, UNDER 50 TONS; TRACKHOE-ROBOTIC: TRACK AND WHEEL TYPE, UP TO AND INCLUDING 20,0000 LBS. WITH ANY OR ALL ATTACHMENTS; BLADE: BLADE OPERATOR; TRACTOR OPERATOR WITH BOOM ATTACHMENT; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR OVER 20,000 LBS PULLBACK; CRANE: CHICAGO BOOM AND SIMILAR TYPES; BOOM TYPE LIFTING DEVICE, 5 TON CAPACITY OR LESS; RUBBER-TIRED SCRAPER, S | $50.27 | $16.90 |
| ENGI0701-038 | POWER EQUIPMENT OPERATOR GROUP 5 TRACKHOE-HYDRAULICTRACK TYPE UP TO AND INCLUDING 20,000 LBS, WHEEL TYPE (FORD, JOHN DEER, CASE TYPE); BOOM TRUCK OPERATOR; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR LESS THAN 20,000 LBS PULLBACK; FORKLIFT OVER 5 TON, BULLDOZER 20,000 LBS OR 100 HORSES OR LESS; ROLLER; COMPACTOR WITHOUT BLADE; HOIST OPERATOR SINGLE DRUM | $49.03 | $16.90 |
| ENGI0701-038 | POWER EQUIPMENT OPERATOR GROUP 6 OILER; GRADE CHECKER; CRANE OILER; FORKLIFT; ROLLER(NON-ASPHALT) | $45.81 | $16.90 |
| SUOR2009-078 | TRUCK DRIVERDUMP TRUCK | $23.79 | $5.95 |
| SUOR2009-078 | TRUCK DRIVEROFF THE ROAD TRUCK | $31.81 | $6.33 |
| SUOR2009-078 | TRUCK DRIVERWATER TRUCK | $26.12 | $6.53 |