Rates on this page changed recently: the governing determination carries a modification dated October 8, 2026. The active federal wage determination covering building construction in Ulster County, NY lists 152 classifications with published rates, base pay from $20.53 to $77.82 per hour. The determination was last modified October 8, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BOILERMAKER(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE) | $68.88 | $49.83 | NY20260007 |
| BRICKLAYER(BUILDING CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) | $46.45 | $37.50 | NY20260007 |
| BRICKLAYER(BUILDING CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE COUNTY (TOWN OF TUXEDO)) | $47.44 | $38.00 |
The highest published base on this schedule belongs to POWER EQUIPMENT OPERATOR GROUP 5-A-2 at $77.82 per hour plus $35.25 fringe; the schedule's median base is $51.91.
The governing determination was modified October 8, 2026, within the last 30 days. Contractors mid-bid in Ulster County should re-check figures against the determination text before submitting.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example NY20260007 Mod dated October 8, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov October 17, 2026. The wage determination incorporated into your contract is the legally operative document.
| NY20260007 |
| BRICKLAYER(HEAVY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE COUNTY (TOWN OF TUXEDO)) | $47.44 | $38.00 | NY20260007 |
| BRICKLAYER(HEAVY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) | $46.45 | $37.50 | NY20260007 |
| BRICKLAYER(HIGHWAY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES) | $46.45 | $37.50 | NY20260007 |
| CARPENTERS(BUILDING CONSTRUCTION): CARPENTERS, MILLWRIGHTS, PILE DRIVERS | $44.72 | $31.23 | NY20260007 |
| CARPENTERS(HEAVY AND HIGHWAY CONSTRUCTION): CARPENTERS, MILLWRIGHTS, PILE DRIVERS | $44.72 | $31.23 | NY20260007 |
| DIVER(DUTCHESS AND ORANGE COUNTIES) | $75.46 | $55.84 | NY20260007 |
| DIVER TENDER(DUTCHESS AND ORANGE COUNTIES) | $55.00 | $55.84 | NY20260007 |
| DOCK BUILDER & PILEDRIVERMEN(DUTCHESS AND ORANGE COUNTIES) | $60.59 | $55.84 | NY20260007 |
| ELECTRICIAN(ORANGE AND DUTCHESS (TOWNSHIPS OF FISHKILL, EAST FISHKILL AND BEACON) COUNTIES). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY) | $51.50 | $42.22 | NY20260007 |
| ELECTRICIAN(DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY) | $51.50 | $42.22 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): MECHANIC. (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR | $43.35 | $30.73 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER). (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY | $43.35 | $30.73 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): LINEMAN AND TECHNICIAN. (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FO | $54.19 | $35.69 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STA | $43.35 | $30.73 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE OPERATOR). (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND E | $48.77 | $31.31 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): FLAGMAN (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR O | $32.51 | $29.93 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): LINEMAN & TECHNICIAN. (FOOTNOT | $61.56 | $36.21 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN TRUCK DRIVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN DIGGING MACHINE OPERATOR . (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY | $55.40 | $31.78 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE | $35.34 | $30.12 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): LINEMAN AND TECHNICIAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY | $61.56 | $36.21 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, ME | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SUBSTATION): CABLE SPLICER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $63.14 | $33.82 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SUBSTATION): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $35.34 | $30.12 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SUBSTATION): GROUND MAN TRUCK DRIVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SUBSTATION): GROUNDMAN DIGGING MACHINE OPERATOR. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $55.40 | $31.78 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SUBSTATION): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SUBSTATION): LINEMAN & TECHNICIAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $61.56 | $36.21 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SUBSTATION): MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.) | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVER (TRACTO | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): FLAGMAN. (FOOTNOTE: ADDITIONAL | $35.34 | $30.12 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): MECHANIC. (FOOTNOTE: ADDITIONA | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN DIGGING MACHINE OPER | $55.40 | $31.78 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVER. (FOOTN | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): CABLE SPLICER. (FOOTNOTE: ADDI | $64.59 | $42.92 | NY20260007 |
| ELECTRICIAN(LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): MECHANIC (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): LINEMAN & TECHNICIAN (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE | $61.56 | $36.21 | NY20260007 |
| ELECTRICIAN(LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE OPERATOR) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECT | $55.40 | $31.78 | NY20260007 |
| ELECTRICIAN(LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR | $49.25 | $31.15 | NY20260007 |
| ELECTRICIAN(LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF | $35.34 | $30.12 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.) | $38.73 | $6.93 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): CABLE SPLICER (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.) | $40.81 | $6.99 | NY20260007 |
| ELECTRICIAN(LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): GROUNDMAN (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.) | $20.53 | $6.39 | NY20260007 |
| ELEVATOR MECHANIC(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. AND B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY.) | $76.12 | $38.98 | NY20260007 |
| GLAZIER(DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) | $49.20 | $57.20 | NY20260007 |
| HAZARDOUS MATERIAL HANDLERDUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES) | $41.74 | $27.58 | NY20260007 |
| HAZARDOUS MATERIAL HANDLERDUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE COUNTIES) | $46.62 | $49.30 | NY20260007 |
| INSULATOR/ASBESTOS WORKER(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (SULLIVAN AND ULSTER COUNTIES) | $41.74 | $27.58 | NY20260007 |
| INSULATOR/ASBESTOS WORKER(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (DUTCHESS AND ORANGE COUNTIES) | $46.62 | $49.30 | NY20260007 |
| IRONWORKER(ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY.) | $42.63 | $53.70 | NY20260007 |
| LABORER(HEAVY & HIGHWAY CONSTRUCTION) GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CRUB AND SIDEWALK FROM SETTER; PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MA | $44.80 | $32.45 | NY20260007 |
| LABORER(HEAVY & HIGHWAY CONSTRUCTION) GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIALABATEMENT FOREMAN. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $54.70 | $32.45 | NY20260007 |
| LABORER(BUILDING CONSTRUCTION) GROUP 2: FORKLIFT FOR MASONRY PURPOSES (ORANGE AND ULSTER COUNTIES) | $37.75 | $27.15 | NY20260007 |
| LABORER(BUILDING CONSTRUCTION) GROUP 3: ASBESTOS ABATEMENT WORK, TOXIC AND HAZARDOUS ABATEMENT, LEAD ABATEMENT WORK, ENVIRONMENTAL WORK. (ORANGE AND ULSTER COUNTIES) | $40.50 | $27.15 | NY20260007 |
| LABORER(HEAVY & HIGHWAY CONSTRUCTION) GROUP 1: FLAGPERSON, GATEPERSON (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY)(ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $40.80 | $32.45 | NY20260007 |
| LABORER(HEAVY & HIGHWAY CONSTRUCTION) GROUP 3: INGERSOLL RAND EAVY DUTY CRAWLER MASTER TYPE HCMZ ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLUDING GRADE, PIPE, CONCRETE, CLEARING, BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, BLASTER AND ASPHALT SCREEDMAN. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUD | $49.40 | $32.45 | NY20260007 |
| LABORER(BUILDING CONSTRUCTION) GROUP 1: CUSTODIAL WORK, FLAG PERSON, PORTABLE GENERATOR TENDER, PORTABLE PUMP TENDER, PITMAN AND DUMPMAN, FIREWATCH, TEMPORARY HEAT TENDER, TEMPORARY LIGHT TENDER, TRAFFIC CONTROL, TOOL ROOM TENDER; ARTIFICIAL TURF, AIR CHIPPING HAMMER ACOUSTIC PUMP AND MIXER, CARPENTER TENDER, CONCRETE, CONCRETE CURB AND SIDEWALK FORM SETTER, CONCRETE FORM STRIPPING, CONCRETE SEALING, CONCRETE CURING, CONCRETE FINISHER, CONCRETE VIBRATOR, COMPRESSOR, CLEAN UP AFTER TRADES, DISMANTLING D | $35.95 | $27.15 | NY20260007 |
| LABORER - ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK(HEAVY & HIGHWAY) GROUP 1: ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY) (DUTCHESS COUNTY) | $44.80 | $32.45 | NY20260007 |
| LABORER - ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK(HEAVY & HIGHWAY) GROUP 2: ASBESTOS TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY) (DUTCHESS COUNTY) | $49.40 | $32.45 | NY20260007 |
| LABORER - ASBESTOS, LEAD, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK(BUILDING CONSTRUCTION) GROUP 1: ASBESTOS ABATEMENT WORK, LEAD ABATEMENT WORK, TOXIC AND HAZARDOUS WASTE RELATED WORK; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (DUTCHESS COUNTY) | $45.40 | $29.75 | NY20260007 |
| LABORER - ASBESTOS, LEAD, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK(BUILDING CONSTRUCTION) GROUP 2: ASBESTOS ABATEMENT WORK, TOXIC AND HAZARDOUS ABATEMENT, LEAD ABATEMENT WORK, ENVIRONMENTAL WORK. (DUTCHESS COUNTY) | $46.20 | $29.75 | NY20260007 |
| LABORERS(BUILDING CONSTRUCTION) GROUP 3: BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY) | $43.45 | $32.90 | NY20260007 |
| LABORERS(BUILDING CONSTRUCTION) GROUP 2: HOD CARRIERS, PLASTERERS' TENDERS, SCAFFOLD BUILDERS (PADLOCK AND SELF-SUPPORTING SCAFFOLD 14 FT. OR UNDER ALL RUNWAYS, MORTAR MIXERS) MACHINE AND HAND, CONCRETE MIXERS BY MACHINE UNDER 21E, VIBRATORS, FORM SETTERS, ASPHALT RAKERS, HANDLING REINFORCEMENT RODS, DRILLERS, JACKHAMMER, OPERATOR, SIGNALMAN, GUNNITING, MOTORBUGS, WATER PUMP 2"""" OR UNDER BARCO MACHINE, WRECKERS, PAVING BREAKERS, POWER SAW OPERATORS, OTHER MACHINE OPERATORS. (DUTCHESS COUNTY) | $42.22 | $32.90 | NY20260007 |
| LABORERS(BUILDING CONSTRUCTION) GROUP 1: MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY) | $41.10 | $32.90 | NY20260007 |
| LABORERS(HEAVY & HIGHWAY) GROUP 3: ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY.) (DUTCHESS COUNTY) | $43.90 | $27.80 | NY20260007 |
| LABORERS(HEAVY & HIGHWAY) GROUP 1: FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOMS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY.) (DUTCHESS | $36.45 | $27.80 | NY20260007 |
| LABORERS(HEAVY & HIGHWAY) GROUP 2: GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2"" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHIN | $42.80 | $27.80 | NY20260007 |
| LABORER - TUNNEL, SHAFT, & CAISSON WORK - GROUP 1LABORER, PIT AND DUMPMAN, CHUCK TENDER, BRAKEMAN AND POWDER; MINER AND ALL MAVHINE MEN, SAFETY MINER, ALL SHAFT WORK, CASSON WORK, DRILLING, BLOW PIPE, ALL AIR TOOLS, TUGGER SCALING, NIPPER GUNNITING SROM POT TO NOZZLE, BIT GRINDER, SINGAL MAN (TOP AND BOTTOM), SHIFT STEWARD, CONCRETE MAN, SHIELD DRIVEN TUNNEL, MIXED FACE AND SOFT GROUND LINER PLATE TUNNEL IN FREE AIR. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPEND | $48.05 | $29.50 | NY20260007 |
| MILLWRIGHT(DUTCHESS AND ORANGE COUNTIES) | $47.83 | $43.03 | NY20260007 |
| PAINTERSTRUCTURAL STEEL AND BRIDGE (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) | $56.25 | $55.14 | NY20260007 |
| PAINTERSLEAD ABATEMENT WORK | $35.94 | $24.66 | NY20260007 |
| PAINTERSDRYWALL FINISHERS | $35.94 | $24.66 | NY20260007 |
| PAINTERSSPRAY RATE | $36.94 | $24.66 | NY20260007 |
| PAINTERSPAINTER/PAPERHANGER | $35.94 | $24.66 | NY20260007 |
| PLUMBER/PIPEFITTER(ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY)PLUMBER/PIPEFITTER (ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY) | $60.66 | $45.35 | NY20260007 |
| PLUMBER; STEAMFITTER(ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK) | $53.20 | $46.57 | NY20260007 |
| PLUMBER; STEAMFITTER(SULLIVAN COUNTY (TOWNSHIPS OF LUMBERLAND, FORESTBURGH, HIGHLAND, TUSTEN, MAMAKATING, FALLSBURGH, THOMPSON, BETHEL, COCHECTON, DELAWARE, FREEMONT, CALLICOON, LIBERTY, MONTICELLO, NEVERSINK AND ROCKLAND); ORANGE COUNTY (REMAINING TOWNSHIPS) AND ULSTER COUNTY (TOWNS OF SHAWANGURK, WAWARSING, PLATTEKILL, MARLBORO AND ELLENVILLE UP TO NAPANOCH PRISON)) | $53.20 | $46.57 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 1(HEAVY & HIGHWAY): BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEP | $68.63 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 1(HEAVY & HIGHWAY): ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), D | $57.30 | $33.55 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 1(BUILDING, HEAVY & HIGHWAY): AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPE); UTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES); CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES); CRANES (ALL TYPES,INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND, FLOATING OR CHICAGO BOOM TYPE); DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL) ROTARY DRILL; SELF-PROPELLED, HYDRAULIC DRILL, | $61.72 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 1A(BUILDING CONSTRUCTION): CARRIER- TRAILER HORSE; CONCRETE-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPERSTRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PICKER 25 T | $59.04 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 1-A(HEAVY & HIGHWAY): AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST P | $60.42 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 1B(BUILDING CONSTRUCTION): COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITI | $54.41 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 1-B(HEAVY & HIGHWAY): ROAD PAVER, ASPHALT (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY | $63.70 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 2(HEAVY & HIGHWAY): ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. Y | $56.39 | $33.55 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 2(BUILDING, HEAVY & HIGHWAY): ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING MA | $60.13 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 2A(BUILDING CONSTRUCTION): COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDI | $56.97 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 2-A(HEAVY & HIGHWAY): BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE | $57.84 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 2-B(HEAVY & HIGHWAY): MECHANIC (OUTSIDE) ALL TYPES (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELE | $59.67 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 3(HEAVY & HIGHWAY): A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING | $56.81 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 3(HEAVY & HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONC | $53.82 | $33.55 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 3(BUILDING, HEAVY & HIGHWAY): ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINES (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOS | $58.22 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 3A(BUILDING CONSTRUCTION): ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE YARD | $54.88 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 3B(BUILDING CONSTRUCTION): COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOIST. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS | $52.25 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 4(HEAVY & HIGHWAY): TOWER CRANES. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $63.30 | $33.55 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 4(BUILDING, HEAVY & HIGHWAY): BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL | $56.59 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 4A(BUILDING CONSTRUCTION): AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEE | $54.33 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 4-A(HEAVY & HIGHWAY): SERVICE MEN (FUEL OR GREASE TRUCK). (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEM | $51.57 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 4B(BUILDING CONSTRUCTION): COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, | $45.94 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 4-B(HEAVY & HIGHWAY): OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (NOT | $44.19 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5(BUILDING CONSTRUCTION): MOTORIZED ROLLER (WALK BEHIND) (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, | $49.53 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5(HEAVY & HIGHWAY):OILER (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING | $64.02 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5(HEAVY & HIGHWAY): CRANES 50 TONS AND OVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $61.80 | $33.55 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5(BUILDING, HEAVY & HIGHWAY): OILER (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES) | $61.72 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5A(BUILDING CONSTRUCTION): MASTER MECHANIC (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, C | $61.95 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5-A-1(HEAVY & HIGHWAY): MASTER MECHANIC (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; TH | $64.02 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5-A-2(HEAVY & HIGHWAY): ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONA | $77.82 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5-A-3(HEAVY & HIGHWAY): ENGINEER-- PILE DRIVER (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION | $75.13 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5-A-4(HEAVY & HIGHWAY): HOIST ENGINEER- STEEL -SUB STRUCTURE (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVE | $70.41 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5-A-5(HEAVY & HIGHWAY): JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN | $59.19 | $35.25 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 5B(BUILDING CONSTRUCTION): UTILITY MAN (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUM | $47.00 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 6(BUILDING CONSTRUCTION): WAREHOUSE MAN (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COL | $49.26 | $31.32 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 6(HEAVY & HIGHWAY): CRANES 49 TONS AND BELOW. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $60.30 | $33.55 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 6(BUILDING, HEAVY & HIGHWAY): HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $63.54 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATOR GROUP 7(HEAVY & HIGHWAY): MASTER MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.) | $58.91 | $33.55 | NY20260007 |
| POWER EQUIPMENT OPERATORS GROUP A(BUILDING CONSTRUCTION): SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVE | $54.93 | $33.20 | NY20260007 |
| POWER EQUIPMENT OPERATORS GROUP A(1) (BUILDLING CONSTRUCTION): CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) (GROUP A(1) CRANE PREMIUMS: OVER 150', ADD $1.00. OVER 200', ADD $2.00.) (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSG | $55.42 | $33.20 | NY20260007 |
| POWER EQUIPMENT OPERATORS GROUP B(BUILDING CONSTRUCTION) BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), | $53.91 | $33.20 | NY20260007 |
| POWER EQUIPMENT OPERATORS GROUP C(BUILDLING CONSTRUCTION): FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS. (NOTE: HAZARDOUS WORK - AN | $51.01 | $33.20 | NY20260007 |
| POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMA | $62.35 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: N | $60.70 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENE | $58.56 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFI | $57.06 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 5OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COU | $53.34 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6HELICOPTER PILOT. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $64.28 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - STEEL ERECTION(BUILDING CONSTRUCTION) GROUP 7: HELICOPTER PILOT. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $65.74 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - STEEL ERECTION(BUILDING CONSTRUCTION) GROUP 2: CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, TH | $68.58 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - STEEL ERECTION(BUILDING CONSTRUCTION) GROUP 1: CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THA | $70.24 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - STEEL ERECTION(BUILDING CONSTRUCTION) GROUP 4: AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFI | $58.63 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - STEEL ERECTION(BUILDING CONSTRUCTION) GROUP 5: COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS | $57.10 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - STEEL ERECTION(BUILDING CONSTRUCTION) GROUP 6: OILER. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $53.34 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - STEEL ERECTION(BUILDING CONSTRUCTION) GROUP 3: ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOO | $61.29 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - TANK ERECTION(BUILDING CONSTRUCTION) GROUP 5: OILER (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $54.07 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - TANK ERECTION(BUILDING CONSTRUCTION) GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, | $61.28 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - TANK ERECTION(BUILDING CONSTRUCTION) GROUP 3: HELICOPTER PILOT ENGINEER. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES) | $64.85 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - TANK ERECTION(BUILDING CONSTRUCTION) GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY | $68.37 | $37.50 | NY20260007 |
| POWER EQUIPMENT OPERATORS - TANK ERECTION(BUILDING CONSTRUCTION) GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURIN | $69.96 | $37.50 | NY20260007 |
| REFRIGERATION MECHANIC(ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK) | $41.99 | $37.38 | NY20260007 |
| ROOFER | $50.25 | $32.62 | NY20260007 |
| SHEET METAL WORKER | $55.29 | $47.43 | NY20260007 |
| SPRINKLER FITTER | $57.20 | $32.66 | NY20260007 |
| TRUCK DRIVERSGROUP 3- DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FUEL TRUCKS, BATCH TRUCKS AND ALL OTHER TRACTOR TRAILERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLI | $37.13 | $46.37 | NY20260007 |
| TRUCK DRIVERSGROUP 4- DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $37.02 | $46.37 | NY20260007 |
| TRUCK DRIVERSGROUP 5- DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $36.90 | $46.37 | NY20260007 |
| TRUCK DRIVERSGROUP 1A- DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $39.03 | $46.37 | NY20260007 |
| TRUCK DRIVERSGROUP 1- DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, | $37.91 | $46.37 | NY20260007 |
| TRUCK DRIVERSGROUP 2- DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE TRUCKS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) | $37.35 | $46.37 | NY20260007 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.