Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building, Heavy, Highway
Covers 4 counties in New York: Dutchess, Orange, Sullivan, Ulster. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0005-001 | BOILERMAKER FOOTNOTEA. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE | $68.88 | $49.83 |
| BRNY0005-001 | BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION(DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES) | $46.45 | $37.50 |
| BRNY0005-001 | BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, BUILDING CONSTRUCTION(ORANGE COUNTY (TOWN OF TUXEDO)) | $47.44 | $38.00 |
| BRNY0005-001 | BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION(ORANGE COUNTY (TOWN OF TUXEDO)) | $47.44 | $38.00 |
| BRNY0005-001 | BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $46.45 |
| $37.50 |
| BRNY0005-001 | BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HIGHWAY CONSTRUCTION(DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES) | $46.45 | $37.50 |
| CARP0279-005 | CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY & HIGHWAY CONSTRUCTION) | $44.72 | $31.23 |
| CARP0279-005 | CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (BUILDING CONSTRUCTION) | $44.72 | $31.23 |
| CARP1556-005 | DIVER(DUTCHESS AND ORANGE COUNTIES) | $75.46 | $55.84 |
| CARP1556-005 | DIVER TENDER(DUTCHESS AND ORANGE COUNTIES) | $55.00 | $55.84 |
| CARP1556-005 | DOCK BUILDER & PILEDRIVERMEN(DUTCHESS AND ORANGE COUNTIES) | $60.59 | $55.84 |
| ELEC0363-001 | ELECTRICIAN(ORANGE AND DUTCHESS (TOWNSHIPS OF FISHKILL, EAST FISHKILL AND BEACON) COUNTIES). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $51.50 | $42.22 |
| ELEC0363-001 | ELECTRICIAN(DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $51.50 | $42.22 |
| ELEC1249-005 | ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBEROPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: LINEMAN & TECHNICIAN (SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | $61.56 | $36.21 |
| ELEC1249-005 | ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBEROPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: FLAGMAN (SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | $35.34 | $30.12 |
| ELEC1249-005 | ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBEROPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN (DIGGING MACHINE OPERATOR) (SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFT | $55.40 | $31.78 |
| ELEC1249-005 | ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBEROPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: MECHANIC (SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | $49.25 | $31.15 |
| ELEC1249-005 | ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBEROPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN (TRUCK DRIVER) (SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLID | $49.25 | $31.15 |
| ELEC1249-005 | ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBEROPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR TH | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONLINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Substation:) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONCABLE SPLICER (Substation:) | $63.14 | $33.82 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONCABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Substation:) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONLINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: MECHANIC. PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AF | $43.35 | $30.73 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE OPERATOR). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE H | $48.77 | $31.31 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN. PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $32.51 | $29.93 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN. PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $54.19 | $35.69 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION ANDMAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITE | $61.56 | $36.21 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION SUBSTATIONGROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARYINSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRE | $49.25 | $31.15 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTCABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTINSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTGROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 |
| ELEV0138-001 | ELEVATOR MECHANIC FOOTNOTEA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $76.12 | $38.98 |
| PAIN0009-004 | GLAZIER(DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) | $49.20 | $57.20 |
| ASBE0040-003 | HAZARDOUS MATERIAL HANDLERDUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES) | $41.74 | $27.58 |
| ASBE0091-002 | HAZARDOUS MATERIAL HANDLERDUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE COUNTIES) | $46.62 | $49.30 |
| ASBE0040-003 | INSULATOR/ASBESTOS WORKER(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (SULLIVAN AND ULSTER COUNTIES) | $41.74 | $27.58 |
| ASBE0091-002 | INSULATOR/ASBESTOS WORKER(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (DUTCHESS AND ORANGE COUNTIES) | $46.62 | $49.30 |
| IRON0417-001 | IRONWORKER A) PAID HOLIDAYSNEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 |
| LABO0017-002 | LABORERDUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 1 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer acoustic pump and mixer, carpenter tender, concrete, concrete curb and side | $45.40 | $29.75 |
| LABO0017-002 | LABORERDUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work): (BUILDING CONSTRUCTION) GROUP 2 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump tender, pitman and dumpman, firewatch, temporary heat tender, temporary light tender, traffic control, tool room tender; Artificial turf, air chipping hammer acoustic pump and mixer, carpenter tender, concrete, concrete curb and side | $46.20 | $29.75 |
| LABO0235-003 | LABORERSGROUP 2 (BUILDING CONSTRUCTION) | $42.22 | $32.90 |
| LABO0235-003 | LABORERSGROUP 1 (BUILDING CONSTRUCTION) MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY) | $41.10 | $32.90 |
| LABO0235-003 | LABORERSGROUP 3 (BUILDING CONSTRUCTION) BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY) | $43.45 | $32.90 |
| LABO0235-005 | LABORERSHEAVY & HIGHWAY GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOMS. (DUTCHESS COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY | $36.45 | $27.80 |
| LABO0235-005 | LABORERSHEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2"" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERS. (DUTCHESS COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTI | $42.80 | $27.80 |
| LABO0235-005 | LABORERSHEAVY & HIGHWAY GROUP 3 ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. (DUTCHESS COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY | $43.90 | $27.80 |
| CARP0740-002 | MILLWRIGHT(DUTCHESS AND ORANGE COUNTIES) | $47.83 | $43.03 |
| PAIN0806-008 | PAINTERSTRUCTURAL STEEL AND BRIDGE (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) | $56.25 | $55.14 |
| PAIN0155-003 | PAINTERS(LEAD ABATEMENT WORK) | $35.94 | $24.66 |
| PAIN0155-003 | PAINTERS(DRYWALL FINISHERS) | $35.94 | $24.66 |
| PAIN0155-003 | PAINTERS(SPRAY RATE) | $36.94 | $24.66 |
| PAIN0155-003 | PAINTERS(PAINTER/PAPERHANGER) | $35.94 | $24.66 |
| PLUM0021-005 | PLUMBER/PIPEFITTER(ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY) | $60.66 | $45.35 |
| PLUM0373-002 | PLUMBER; STEAMFITTER(ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK) | $53.20 | $46.57 |
| PLUM0373-003 | PLUMBER; STEAMFITTER(SULLIVAN COUNTY (TOWNSHIPS OF LUMBERLAND, FORESTBURGH, HIGHLAND, TUSTEN, MAMAKATING, FALLSBURGH, THOMPSON, BETHEL, COCHECTON, DELAWARE, FREEMONT, CALLICOON, LIBERTY, MONTICELLO, NEVERSINK AND ROCKLAND); ORANGE COUNTY (REMAINING TOWNSHIPS) AND ULSTER COUNTY (TOWNS OF SHAWANGURK, WAWARSING, PLATTEKILL, MARLBORO AND ELLENVILLE UP TO NAPANOCH PRISON)) | $53.20 | $46.57 |
| ENGI0825-007 | POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAYGROUP 1 | $61.72 | $37.50 |
| ENGI0825-007 | POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAYGROUP 3 ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINES (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE | $58.22 | $37.50 |
| ENGI0825-007 | POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 2 ""A"" FRAME; BACKHOE(COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL | $60.13 | $37.50 |
| ENGI0825-007 | POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS(SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS | $56.59 | $37.50 |
| ENGI0825-007 | POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 5 OILER(ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $61.72 | $37.50 |
| ENGI0825-007 | POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 6 HELICOPTER PILOT(ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $63.54 | $37.50 |
| ENGI0158-018 | POWER EQUIPMENT OPERATOR GROUP 1(HEAVY & HIGHWAY) | $57.30 | $33.55 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 1A(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $59.04 | $31.32 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 1B(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $54.41 | $31.32 |
| ENGI0158-018 | POWER EQUIPMENT OPERATOR GROUP 2(HEAVY & HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD | $56.39 | $33.55 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 2A(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $56.97 | $31.32 |
| ENGI0158-018 | POWER EQUIPMENT OPERATOR GROUP 3(HEAVY & HIGHWAY) A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCR | $53.82 | $33.55 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 3A(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $54.88 | $31.32 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 3B(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $52.25 | $31.32 |
| ENGI0158-018 | POWER EQUIPMENT OPERATOR GROUP 4(HEAVY & HIGHWAY) TOWER CRANES (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $63.30 | $33.55 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 4A(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $54.33 | $31.32 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 4B(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $45.94 | $31.32 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 5(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $49.53 | $31.32 |
| ENGI0158-018 | POWER EQUIPMENT OPERATOR GROUP 5(HEAVY & HIGHWAY) CRANES 50 TONS AND OVER (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $61.80 | $33.55 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 5A(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $61.95 | $31.32 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 5B(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $47.00 | $31.32 |
| ENGI0137-001 | POWER EQUIPMENT OPERATOR GROUP 6(DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILDING CONSTRUCTION) | $49.26 | $31.32 |
| ENGI0158-018 | POWER EQUIPMENT OPERATOR GROUP 6(HEAVY & HIGHWAY) CRANES 49 TONS AND BELOW (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $60.30 | $33.55 |
| ENGI0158-018 | POWER EQUIPMENT OPERATOR GROUP 7(HEAVY & HIGHWAY) MASTER MECHANIC (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $58.91 | $33.55 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $64.02 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S D | $57.84 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $63.70 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; C | $68.63 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE M | $60.42 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 5OILER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $64.02 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECT | $59.19 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY | $70.41 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMA | $75.13 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOT | $77.82 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (POUGHKEEPSIE | $44.19 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; A | $51.57 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPRE | $56.81 | $35.25 |
| ENGI0137-007 | POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE AND SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRI | $59.67 | $35.25 |
| ENGI0158-006 | POWER EQUIPMENT OPERATORSGROUP A SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION) HAZARDOUS WORK | $54.93 | $33.20 |
| ENGI0158-006 | POWER EQUIPMENT OPERATORSGROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) GROUP A(1): CRANE PREMIUMS 1 OVER 150' :ADD $1.00 2 OVER 200': ADD $2.00 BUILDING CONSTRUCTION NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) | $55.42 | $33.20 |
| ENGI0158-006 | POWER EQUIPMENT OPERATORS: GROUP B BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND | $53.91 | $33.20 |
| ENGI0158-006 | POWER EQUIPMENT OPERATORS: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS. (NORTHERN PART OF DUTCHESS (TO THE NORTHEN | $51.01 | $33.20 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION TANK ERECTION GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE | $68.37 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION STEEL ERECTION GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving | $70.24 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION STEEL ERECTION GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provi | $57.10 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION STEEL ERECTION GROUP 7 HELICOPTER PILOT . (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs | $65.74 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION STEEL ERECTION GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazm | $61.29 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION STEEL ERECTION GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving | $68.58 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION STEEL ERECTION GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium . | $58.63 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION STEEL ERECTION GROUP 6 OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day in the calendar week during which the holiday occurs | $53.34 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $54.07 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION TANK ERECTION GROUP 3: HELICOPTER PILOT ENGINEER. (ORANGE, ULSTER AND SULLIVAN COUNTIES NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $64.85 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION TANK ERECTION GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF | $61.28 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSBUILDING CONSTRUCTION TANK ERECTION GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH | $69.96 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSOILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAP | $58.56 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSOILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL P | $60.70 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSOILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAY | $53.34 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSOILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $64.28 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSOILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHI | $57.06 | $37.50 |
| ENGI0825-008 | POWER EQUIPMENT OPERATORSOILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELEC | $62.35 | $37.50 |
| PLUM0373-002 | REFRIGERATION MECHANIC(ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK) | $41.99 | $37.38 |
| ROOF0008-002 | ROOFER | $50.25 | $32.62 |
| SHEE0038-001 | SHEET METAL WORKER | $55.29 | $47.43 |
| SFNY0669-002 | SPRINKLER FITTER | $57.20 | $32.66 |
| TEAM0445-001 | TRUCK DRIVERSGROUP 3 DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FUEL TRUCKS, BATCH TRUCKS AND ALL OTHER TRACTOR TRAILERS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $37.13 | $46.37 |
| TEAM0445-001 | TRUCK DRIVERSGROUP 4 DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $37.02 | $46.37 |
| TEAM0445-001 | TRUCK DRIVERSGROUP 5 DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $36.90 | $46.37 |
| TEAM0445-001 | TRUCK DRIVERSGROUP 1A DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $39.03 | $46.37 |
| TEAM0445-001 | TRUCK DRIVERSGROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE | $37.91 | $46.37 |
| TEAM0445-001 | TRUCK DRIVERSGROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $37.35 | $46.37 |