POWER EQUIPMENT OPERATORS leads the residential schedule for Suffolk County, NY at $84.70 base plus $40.15 fringe. The active federal wage determination covering residential construction in Suffolk County, NY lists 58 classifications with published rates, base pay from $34.14 to $84.70 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | NY20260012 |
| BOILERMAKER FOOTNOTEA. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE | $68.88 | $49.83 | NY20260012 |
| BRICKLAYER | $67.39 | $35.90 | NY20260012 |
Across the 58 published classifications for residential work in Suffolk County, NY, base pay spans $34.14 to $84.70 per hour with a median of $55.92.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example NY20260012 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTER(SOFT FLOOR LAYERS) |
| $59.05 |
| $48.08 |
| NY20260012 |
| CARPENTERS(RESIDENTIAL) | $34.14 | $23.15 | NY20260012 |
| CARPENTERS(HEAVY & HIGHWAY) | $53.56 | $34.28 | NY20260012 |
| CARPENTERSNASSAU COUNTY (REMAINDER OF COUNTY) AND SUFFOLK COUNTY (BUILDING) | $53.56 | $34.28 | NY20260012 |
| CARPENTERS(PILEDRIVERMAN) | $60.59 | $55.84 | NY20260012 |
| CARPENTERS(DIVERS TENDERS) | $55.00 | $55.84 | NY20260012 |
| CARPENTERS(DOCKBUILDERS) | $60.59 | $55.84 | NY20260012 |
| CARPENTERSDIVERS | $75.46 | $55.84 | NY20260012 |
| CARPENTERS(TIMBERMEN) | $55.59 | $55.41 | NY20260012 |
| CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 | NY20260012 |
| ELECTRICIAN | $64.55 | $47.40 | NY20260012 |
| ELECTRICIANS(TELEPHONE UNIT) | $42.93 | $32.43 | NY20260012 |
| ELECTRICIANS(MAINTENANCE UNIT) | $49.79 | $32.27 | NY20260012 |
| ELEVATOR MECHANIC(MODERNIZATION AND REPAIR) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURL | $59.09 | $45.56 | NY20260012 |
| ELEVATOR MECHANIC(ELEVATOR CONSTRUCTOR) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RA | $75.14 | $47.45 | NY20260012 |
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | NY20260012 |
| IRONWORKER(METALLIC LATHERS AND REINFORCING IRONWORKERS) | $57.00 | $32.96 | NY20260012 |
| IRONWORKER(STONE DERRICKMAN) | $60.40 | $60.14 | NY20260012 |
| IRONWORKERORNAMENTAL | $48.15 | $67.62 | NY20260012 |
| LABORERS(BUILDING) | $42.55 | $34.79 | NY20260012 |
| LABORERSPLASTERERS TENDERS (BUILDING) | $42.55 | $34.79 | NY20260012 |
| LABORERSASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 | NY20260012 |
| LABORERSREGULAR LABORERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTINGLABORERS: REGULAR LABORERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $45.49 | $35.98 | NY20260012 |
| LABORERSASPHALT SHOVELERS, ROLLER BOYS & TAMPERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIULABORERS: ASPHALT SHOVELERS, ROLLER BOYS & TAMPERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $49.96 | $35.98 | NY20260012 |
| LABORERSASPHALT RAKERS; FORMSETTERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTORLABORERS: ASPHALT RAKERS; FORMSETTERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $51.43 | $35.98 | NY20260012 |
| LINE CONSTRUCTIONMATERIAL MAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $61.40 | $36.24 | NY20260012 |
| LINE CONSTRUCTIONLINEMAN & CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $70.57 | $39.19 | NY20260012 |
| LINE CONSTRUCTIONHEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $56.46 | $34.63 | NY20260012 |
| LINE CONSTRUCTIONGROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $42.34 | $30.05 | NY20260012 |
| MASON - STONE | $69.91 | $44.02 | NY20260012 |
| MILLWRIGHT | $60.83 | $58.03 | NY20260012 |
| PAINTER(SPRAY, SCAFFOLD, SANDBLASTING) | $47.75 | $44.11 | NY20260012 |
| PAINTER(PAINTERS, DRYWALL FINISHERS) | $44.75 | $44.11 | NY20260012 |
| PAINTER(GLAZIERS) | $49.20 | $57.20 | NY20260012 |
| PAINTERS(STUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | NY20260012 |
| PAINTERS(DRYWALL TAPERS/POINTERS) | $48.47 | $35.91 | NY20260012 |
| PLASTERER | $48.51 | $32.78 | NY20260012 |
| PLUMBER(RESIDENTIAL CONSTRUCTION:) | $36.05 | $19.63 | NY20260012 |
| PLUMBER(BUILDING CONSTRUCTION:) | $60.73 | $45.75 | NY20260012 |
| PLUMBER, SERVICE FITTERS | $47.85 | $23.96 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 5 (BUILDING CONSTRUCTION) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACTOR (CATERPILLAR OR WHEEL VIBRATOR) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: N | $54.21 | $39.99 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 1 (BUILDING CONSTRUCTION) ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER (THERMOPLASTIC), CHERRY PICKER, OVER 50 TONS, CMI OR MAXIM SPREADER, CONCRETE PUMP (WITH OILER), CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING), CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUM), LOADING MACHINE (BUCKET) CAP OF 10 YDS OR OVER MICRO-TRAP, WITH COMPRESSOR (NEGATIVE AIR MACHINE), MILLING | $80.43 | $39.99 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 4 (BUILDING CONSTRUCTION) COMPRESSOR, COMPRESSOR (ON CRANE), COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORKLIFT (WALK BEHIND, POWER OPERATED), GENERATOR-PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, PUMP (DOUBLE ACTION DIAPHGRGM), PUMP (GYPSUM), TRENCH MACHINE (HAND), WELDING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 | $56.54 | $39.99 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 3(BUILDING CONSTRUCTION) COMRPESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE IN BATTERY), CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE (ASPHALT OR CONCRETE), CURING MACHINE, FIREMAN, HOIST (1 DRUM), MICRO-TRAP, (SELF CONTAINED, NEGATIVE AIR MACHINE), PUMP (4 INCHES OR OVER), PUMP (HYDRAULIC), PUMP (JET), PUMP (SUMBERSIBLE), PUMP (WELL POINT), PULVI-MIXER, RIDGE CUTTER, ROLLER (DIRT), STRIPING MACHINE, VAC-ALL, WELDING AND BURNING, WELDING MACHINE (PILE WORK), WELDI | $73.78 | $39.99 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 2 (BUILDING CONSTRUCTION) BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE, LOADING MACHINE (FRONT END) MECHANICAL COMPACTORS, (MACHINE DRAWN), MULCH MACHINE (MACHINE-FED), MECHANIC, POWER WINCH, OTHER THAN STONE/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED OTHER THAN STONE STEEL) PUMP (HYDRAULIC, WITH BORING MACHINE), ROLLER, (ASPHALT), SCOOP (CARRY-ALL SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE NOTES | $76.44 | $39.99 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 3 (HEAVY & HIGHWAY) CURB MACHINE (ASPHALT OR CONCRETE), MAINTENANCE ENGINEER (SMALL EQUIPMENT), MAINTENANCE ENGINEER (WELL-POINT) MECHANIC (FIELDMAN), MICRO-TRAP (SELF CONTAINED, NEGATIVE AIR MACHINE), MILLING MACHINE (SMALL), PULVI-MIXER, PUMP (4 INCHES OR OVER), PUMP HYDRAULIC, PUMP JET, PUMP SUBMERSIBLE, PUMP (WELL POINT), ROLLER DIRT, VAC-ALL, WELDING AND BURNING, COMPRESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE BATTERY), CONCRETE FINISHING MACHINE, CONCRETE SPREADER, CONVEYOR, CUR | $76.61 | $40.15 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 5 (HEAVY & HIGHWAY) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), GRINDER, MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACK TAMPER (2 ENGINEERS, EACH), TRACTOR (CATERPILLAR OR WHEEL), VIBRATOR, WORK BOAT (DECKHAND), NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG | $56.55 | $40.15 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 6 (HEAVY & HIGHWAY) WELL DRILLERS NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: | $44.37 | $12.95 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 2 (HEAVY & HIGHWAY) BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST (2 DRUM), LOADING MACHINE, LOADING MACHINE (FRONT END), MECHANICAL COMPACTOR (MACHINE DRAWN), MECHANIC, MULCH MACHINE (MACHINE- FED), POWER WINCH (OTHER THAN STONE/STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/OTHER THAN STONE STEEL), PUMP HYDRAULIC (WITH BORING MACHINE), ROLLER (ASPHALT), SCOOP (CARRY-ALL, SCRAPER), TOWER CRANE (MAINTENANCE MAN), TREN | $79.33 | $40.15 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 1 (HEAVY & HIGHWAY) ASPHALT SPREADER, BACKHOE CRAWLER (CAPACITY OVER CATERPILLER 225 AND KOMATSU 300), BOILER (THERMOPLASTIC), BORING MACHINE (POST HOLE), CGHERRY PICKER (OVER 50 TON), CMI OR MAXIM SPREADER, CONCRETE PUMP, WITH OILER, CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING) CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUMS), LOADING MACHINE (BUCKET) CAPACITY OF 10 YARDS OR OVER, MICRO-TRAP (WITH COMPRESSOR-N | $84.70 | $40.15 | NY20260012 |
| POWER EQUIPMENT OPERATORSGROUP 4 (HEAVY & HIGHWAY) COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORK LIFT (WALK BEHIND, POWER OPERATED), GENERATOR- PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPOACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, POWER GRINDERS, PUMP (DOUBLE ACTION DIAPHRAGM), PUMP GYPSUM, PUMP (SINGLE ACTION 1 TO 3 INCHES), TRENCH MACHINE HAND, WELDING MACHINE NOTES: | $58.93 | $40.15 | NY20260012 |
| ROOFER | $51.25 | $47.36 | NY20260012 |
| SHEET METAL WORKER(BUILDING CONSTRUCTION) | $53.60 | $60.74 | NY20260012 |
| SHEET METAL WORKER(RESIDENTIAL CONSTRUCTION) | $35.79 | $25.37 | NY20260012 |
| TRUCK DRIVER FOOTNOTESA. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK | $45.65 | $56.20 | NY20260012 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.