Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building, Heavy, Highway, Residential
Covers 2 counties in New York: Nassau, Suffolk. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0012-001 | ASBESTOS WORKERS/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 |
| BOIL0005-001 | BOILERMAKER FOOTNOTEA. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE | $68.88 | $49.83 |
| BRNY0001-001 | BRICKLAYER | $67.39 | $35.90 |
| CARP2287-003 | CARPENTER(SOFT FLOOR LAYERS) | $59.05 | $48.08 |
| CARP0290-001 | CARPENTERS(RESIDENTIAL) | $34.14 | $23.15 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0290-001 |
| CARPENTERS(HEAVY & HIGHWAY) |
| $53.56 |
| $34.28 |
| CARP0290-001 | CARPENTERSNASSAU COUNTY (REMAINDER OF COUNTY) AND SUFFOLK COUNTY (BUILDING) | $53.56 | $34.28 |
| CARP1556-008 | CARPENTERS(PILEDRIVERMAN) | $60.59 | $55.84 |
| CARP1556-008 | CARPENTERS(DIVERS TENDERS) | $55.00 | $55.84 |
| CARP1556-008 | CARPENTERS(DOCKBUILDERS) | $60.59 | $55.84 |
| CARP1556-008 | CARPENTERSDIVERS | $75.46 | $55.84 |
| CARP1556-011 | CARPENTERS(TIMBERMEN) | $55.59 | $55.41 |
| PLAS0780-001 | CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 |
| ELEC0025-001 | ELECTRICIAN | $64.55 | $47.40 |
| ELEC0025-002 | ELECTRICIANS(TELEPHONE UNIT) | $42.93 | $32.43 |
| ELEC0025-002 | ELECTRICIANS(MAINTENANCE UNIT) | $49.79 | $32.27 |
| ELEV0001-002 | ELEVATOR MECHANIC(MODERNIZATION AND REPAIR) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURL | $59.09 | $45.56 |
| ELEV0001-002 | ELEVATOR MECHANIC(ELEVATOR CONSTRUCTOR) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RA | $75.14 | $47.45 |
| ASBE0012-001 | HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 |
| IRON0046-003 | IRONWORKER(METALLIC LATHERS AND REINFORCING IRONWORKERS) | $57.00 | $32.96 |
| IRON0197-001 | IRONWORKER(STONE DERRICKMAN) | $60.40 | $60.14 |
| IRON0580-001 | IRONWORKERORNAMENTAL | $48.15 | $67.62 |
| LABO0066-001 | LABORERS(BUILDING) | $42.55 | $34.79 |
| LABO0066-001 | LABORERSPLASTERERS TENDERS (BUILDING) | $42.55 | $34.79 |
| LABO0078-001 | LABORERSASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 |
| LABO1298-001 | LABORERSREGULAR LABORERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING | $45.49 | $35.98 |
| LABO1298-001 | LABORERSASPHALT SHOVELERS, ROLLER BOYS & TAMPERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIU | $49.96 | $35.98 |
| LABO1298-001 | LABORERSASPHALT RAKERS; FORMSETTERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR | $51.43 | $35.98 |
| ELEC1049-002 | LINE CONSTRUCTIONMATERIAL MAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $61.40 | $36.24 |
| ELEC1049-002 | LINE CONSTRUCTIONLINEMAN & CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $70.57 | $39.19 |
| ELEC1049-002 | LINE CONSTRUCTIONHEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $56.46 | $34.63 |
| ELEC1049-002 | LINE CONSTRUCTIONGROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $42.34 | $30.05 |
| BRNY0001-001 | MASON - STONE | $69.91 | $44.02 |
| CARP0740-001 | MILLWRIGHT | $60.83 | $58.03 |
| PAIN0009-002 | PAINTER(SPRAY, SCAFFOLD, SANDBLASTING) | $47.75 | $44.11 |
| PAIN0009-002 | PAINTER(PAINTERS, DRYWALL FINISHERS) | $44.75 | $44.11 |
| PAIN0009-002 | PAINTER(GLAZIERS) | $49.20 | $57.20 |
| PAIN0806-010 | PAINTERS(STUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 |
| PAIN1974-002 | PAINTERS(DRYWALL TAPERS/POINTERS) | $48.47 | $35.91 |
| PLAS0262-003 | PLASTERER | $48.51 | $32.78 |
| PLUM0200-001 | PLUMBER(RESIDENTIAL CONSTRUCTION:) | $36.05 | $19.63 |
| PLUM0200-001 | PLUMBER(BUILDING CONSTRUCTION:) | $60.73 | $45.75 |
| PLUM0638-001 | PLUMBER, SERVICE FITTERS | $47.85 | $23.96 |
| ENGI0138-001 | POWER EQUIPMENT OPERATORSGROUP 5 (BUILDING CONSTRUCTION) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACTOR (CATERPILLAR OR WHEEL VIBRATOR) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: N | $54.21 | $39.99 |
| ENGI0138-001 | POWER EQUIPMENT OPERATORSGROUP 1 (BUILDING CONSTRUCTION) ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER (THERMOPLASTIC), CHERRY PICKER, OVER 50 TONS, CMI OR MAXIM SPREADER, CONCRETE PUMP (WITH OILER), CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING), CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUM), LOADING MACHINE (BUCKET) CAP OF 10 YDS OR OVER MICRO-TRAP, WITH COMPRESSOR (NEGATIVE AIR MACHINE), MILLING | $80.43 | $39.99 |
| ENGI0138-001 | POWER EQUIPMENT OPERATORSGROUP 4 (BUILDING CONSTRUCTION) COMPRESSOR, COMPRESSOR (ON CRANE), COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORKLIFT (WALK BEHIND, POWER OPERATED), GENERATOR-PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, PUMP (DOUBLE ACTION DIAPHGRGM), PUMP (GYPSUM), TRENCH MACHINE (HAND), WELDING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 | $56.54 | $39.99 |
| ENGI0138-001 | POWER EQUIPMENT OPERATORSGROUP 3(BUILDING CONSTRUCTION) COMRPESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE IN BATTERY), CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE (ASPHALT OR CONCRETE), CURING MACHINE, FIREMAN, HOIST (1 DRUM), MICRO-TRAP, (SELF CONTAINED, NEGATIVE AIR MACHINE), PUMP (4 INCHES OR OVER), PUMP (HYDRAULIC), PUMP (JET), PUMP (SUMBERSIBLE), PUMP (WELL POINT), PULVI-MIXER, RIDGE CUTTER, ROLLER (DIRT), STRIPING MACHINE, VAC-ALL, WELDING AND BURNING, WELDING MACHINE (PILE WORK), WELDI | $73.78 | $39.99 |
| ENGI0138-001 | POWER EQUIPMENT OPERATORSGROUP 2 (BUILDING CONSTRUCTION) BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE, LOADING MACHINE (FRONT END) MECHANICAL COMPACTORS, (MACHINE DRAWN), MULCH MACHINE (MACHINE-FED), MECHANIC, POWER WINCH, OTHER THAN STONE/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED OTHER THAN STONE STEEL) PUMP (HYDRAULIC, WITH BORING MACHINE), ROLLER, (ASPHALT), SCOOP (CARRY-ALL SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE NOTES | $76.44 | $39.99 |
| ENGI0138-002 | POWER EQUIPMENT OPERATORSGROUP 3 (HEAVY & HIGHWAY) CURB MACHINE (ASPHALT OR CONCRETE), MAINTENANCE ENGINEER (SMALL EQUIPMENT), MAINTENANCE ENGINEER (WELL-POINT) MECHANIC (FIELDMAN), MICRO-TRAP (SELF CONTAINED, NEGATIVE AIR MACHINE), MILLING MACHINE (SMALL), PULVI-MIXER, PUMP (4 INCHES OR OVER), PUMP HYDRAULIC, PUMP JET, PUMP SUBMERSIBLE, PUMP (WELL POINT), ROLLER DIRT, VAC-ALL, WELDING AND BURNING, COMPRESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE BATTERY), CONCRETE FINISHING MACHINE, CONCRETE SPREADER, CONVEYOR, CUR | $76.61 | $40.15 |
| ENGI0138-002 | POWER EQUIPMENT OPERATORSGROUP 5 (HEAVY & HIGHWAY) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), GRINDER, MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACK TAMPER (2 ENGINEERS, EACH), TRACTOR (CATERPILLAR OR WHEEL), VIBRATOR, WORK BOAT (DECKHAND), NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG | $56.55 | $40.15 |
| ENGI0138-002 | POWER EQUIPMENT OPERATORSGROUP 6 (HEAVY & HIGHWAY) WELL DRILLERS NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: | $44.37 | $12.95 |
| ENGI0138-002 | POWER EQUIPMENT OPERATORSGROUP 2 (HEAVY & HIGHWAY) BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST (2 DRUM), LOADING MACHINE, LOADING MACHINE (FRONT END), MECHANICAL COMPACTOR (MACHINE DRAWN), MECHANIC, MULCH MACHINE (MACHINE- FED), POWER WINCH (OTHER THAN STONE/STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/OTHER THAN STONE STEEL), PUMP HYDRAULIC (WITH BORING MACHINE), ROLLER (ASPHALT), SCOOP (CARRY-ALL, SCRAPER), TOWER CRANE (MAINTENANCE MAN), TREN | $79.33 | $40.15 |
| ENGI0138-002 | POWER EQUIPMENT OPERATORSGROUP 1 (HEAVY & HIGHWAY) ASPHALT SPREADER, BACKHOE CRAWLER (CAPACITY OVER CATERPILLER 225 AND KOMATSU 300), BOILER (THERMOPLASTIC), BORING MACHINE (POST HOLE), CGHERRY PICKER (OVER 50 TON), CMI OR MAXIM SPREADER, CONCRETE PUMP, WITH OILER, CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING) CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUMS), LOADING MACHINE (BUCKET) CAPACITY OF 10 YARDS OR OVER, MICRO-TRAP (WITH COMPRESSOR-N | $84.70 | $40.15 |
| ENGI0138-002 | POWER EQUIPMENT OPERATORSGROUP 4 (HEAVY & HIGHWAY) COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORK LIFT (WALK BEHIND, POWER OPERATED), GENERATOR- PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPOACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, POWER GRINDERS, PUMP (DOUBLE ACTION DIAPHRAGM), PUMP GYPSUM, PUMP (SINGLE ACTION 1 TO 3 INCHES), TRENCH MACHINE HAND, WELDING MACHINE NOTES: | $58.93 | $40.15 |
| ROOF0154-001 | ROOFER | $51.25 | $47.36 |
| SHEE0028-002 | SHEET METAL WORKER(BUILDING CONSTRUCTION) | $53.60 | $60.74 |
| SHEE0028-002 | SHEET METAL WORKER(RESIDENTIAL CONSTRUCTION) | $35.79 | $25.37 |
| TEAM0282-002 | TRUCK DRIVER FOOTNOTESA. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK | $45.65 | $56.20 |