DOL marked wage determination NV20260091 modified July 30, 2026 (revision 2). Verify against the source below before filing.
DOL modified the wage determination for building work in Clark County, NV within the last 30 days. The active federal wage determinations covering building construction in Clark County, NV list 210 classifications with published rates, base pay from $35.64 to $117.10 per hour. The determination was last modified July 30, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| Air Balance TechnicianJourneyman | $59.85 | $33.51 | NV20260091 |
| Alarm InstallerAlarm Installer | $60.48 | $30.08 | NV20260091 |
| ASBESTOS / INSULATOR WORKER(MECHANIC) ZONE: C - NTTR $8.00ASBESTOS / INSULATOR WORKER (MECHANIC) ZONE: C - NTTR $8.00 | $69.35 | $19.88 | NV20260001 |
| ASBESTOS/INSULATOR WORKERMECHANIC (ZONE PAY (0-19 MILES, LAS VEGAS): $0.00 ZONE PAY (20-45 MILES): $4.00 ZONE PAY (46-75 MILES, MERCURY): $5.00 ZONE PAY (76-150 MILES, FORWARD AREAS): $7.00 ZONE PAY (150+ MILES, NTTR): $8.00) |
The governing determination was modified July 30, 2026, within the last 30 days. Contractors mid-bid in Clark County should re-check figures against the determination text before submitting.
With 210 classifications carrying published rates, this is a comparatively deep schedule; most trades a building project needs appear without a conformance request.
This schedule mixes sources: 48% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example NV20260002 Mod dated July 30, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov August 1, 2026. The wage determination incorporated into your contract is the legally operative document.
| $67.19 |
| $19.88 |
| NV20260002 |
| BoilermakerJourneyman | $76.62 | $0.00 | NV20260091 |
| BOILERMAKER(BLACKSMITH) | $44.31 | $28.96 | NV20260001 |
| BOILERMAKERBLACKSMITH ZONE PAY (ZONE A - LAS VEGAS $0.00 ZONE B - MERCURY & FORWARD AREAS $2.00 ZONE C - NTTR $2.50)BOILERMAKER: BLACKSMITH ZONE PAY (ZONE A - LAS VEGAS $0.00 ZONE B - MERCURY & FORWARD AREAS $2.00 ZONE C - NTTR $2.50) | $44.31 | $28.96 | NV20260002 |
| BricklayerJourneyman | $56.66 | $21.82 | NV20260091 |
| BRICKLAYER(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)BRICKLAYER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.79 | $20.89 | NV20260002 |
| BRICKLAYER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00BRICKLAYER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $50.90 | $19.93 | NV20260001 |
| CarpenterWelder | $54.12 | $30.90 | NV20260091 |
| CarpenterJourneyman | $52.12 | $30.90 | NV20260091 |
| CARPENTER(ZONE PAY: ZONE A: LAS VEGAS - FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS - $4.25)CARPENTER (ZONE PAY: ZONE A: LAS VEGAS - FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS - $4.25) | $52.12 | $28.08 | NV20260002 |
| CARPENTER, LOCKSMITH ZONE PAYZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25CARPENTER, LOCKSMITH ZONE PAY: ZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 | $55.85 | $28.28 | NV20260001 |
| CARPENTER, POWER SAW OPERATOR/PNEUMATIC NAILER ZONE PAYZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25CARPENTER, POWER SAW OPERATOR/PNEUMATIC NAILER ZONE PAY: ZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 | $50.77 | $28.28 | NV20260001 |
| CARPENTER ZONE PAYZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25CARPENTER ZONE PAY: ZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 | $50.77 | $28.28 | NV20260001 |
| CAULKER(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)CAULKER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.79 | $20.89 | NV20260002 |
| Cement MasonJourneyman | $55.14 | $20.47 | NV20260091 |
| CEMENT MASON(ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50)CEMENT MASON (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $43.27 | $29.66 | NV20260002 |
| CEMENT MASON ZONE PAY $4.00CEMENT MASON ZONE PAY $4.00 | $55.79 | $21.95 | NV20260001 |
| ELECTRICIAN(COMMUNICATION TECHNICIAN) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50ELECTRICIAN (COMMUNICATION TECHNICIAN) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 | NV20260001 |
| ELECTRICIAN(CABLE SPLICER) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50ELECTRICIAN (CABLE SPLICER) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 | NV20260001 |
| ELECTRICIANCABLE SPLICER (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50)ELECTRICIAN: CABLE SPLICER (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $61.22 | $28.70 | NV20260002 |
| ELECTRICIANCOMMUNICATION TECHNICIAN ONLY (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50)ELECTRICIAN: COMMUNICATION TECHNICIAN ONLY (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $64.37 | $28.81 | NV20260002 |
| ELECTRICIAN(ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50)ELECTRICIAN (ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $64.37 | $28.81 | NV20260002 |
| Electrician-Communication TechnicianCommunication-Installer/Technician | $42.34 | $23.70 | NV20260091 |
| Electrician-Neon SignJourneyman | $48.12 | $21.56 | NV20260091 |
| Electrician-WiremanWireman | $60.83 | $30.09 | NV20260091 |
| Electrician-WiremanCable Splicer | $61.33 | $30.11 | NV20260091 |
| ELECTRICIAN ZONE PAYZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50ELECTRICIAN ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 | NV20260001 |
| Elevator ConstructorJourneyman Mech | $72.36 | $46.67 | NV20260091 |
| ELEVATOR MACHANIC(ZONE PAY: ZONE A- LAS VEGAS. ZONE B-MERCURY $2.00. ZONE C- NTTR $2.50. FOOTNOTE: ADDITIONAL FRINGE BENEFITS TO BE PAID A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.)ELEVATOR MACHANIC (ZONE PAY: ZONE A- LAS VEGAS. ZONE B-MERCURY $2.00. ZONE C- NTTR $2.50. FOOTNOTE: ADDITIONAL FRINGE BENEFITS TO BE PAID A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.) | $69.43 | $38.44 | NV20260002 |
| ELEVATOR MECHANIC ZONE PAYZONE A - LAS VEGAS ZONE B - MERCURY $2.00 ZONE C - NTTR $2.50 FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAYELEVATOR MECHANIC ZONE PAY: ZONE A - LAS VEGAS ZONE B - MERCURY $2.00 ZONE C - NTTR $2.50 FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $69.43 | $38.44 | NV20260001 |
| Fence ErectorJourneyman | $38.53 | $33.59 | NV20260091 |
| FlagpersonJourneyman | $37.03 | $33.59 | NV20260091 |
| FloorcovererJourneyman | $47.82 | $20.55 | NV20260091 |
| GlazierGlazier Journeyman | $60.76 | $30.47 | NV20260091 |
| Hod Carrier-Brick Mason TenderJourneyman | $38.84 | $33.59 | NV20260091 |
| Hod Carrier-Plaster TenderJourneyman | $39.93 | $33.59 | NV20260091 |
| IronworkerJourneyman | $51.85 | $39.12 | NV20260091 |
| IRONWORKER(ZONE PAY- NNSS $5.50; NTTR $5.50)IRONWORKER (ZONE PAY- NNSS $5.50; NTTR $5.50) | $55.06 | $37.26 | NV20260002 |
| IRONWORKER ZONE PAY$4.50IRONWORKER ZONE PAY: $4.50 | $59.46 | $35.59 | NV20260001 |
| LABORERGROUP 3 ASBESTOS ABATEMENT; HAZARDOUS WASTE; LEAD ABATEMENT; MICROBIAL REMEDIATION WHICH INCLUDES HANTAVIRUS; PETROCHEMICAL HANDLER; RADIATION WORKER. (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE)LABORER GROUP 3 ASBESTOS ABATEMENT; HAZARDOUS WASTE; LEAD ABATEMENT; MICROBIAL REMEDIATION WHICH INCLUDES HANTAVIRUS; PETROCHEMICAL HANDLER; RADIATION WORKER. (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE) | $41.57 | $27.22 | NV20260002 |
| LABORERGROUP 2 ASPHALT RAKER, IRONER, SPREADER; BUGGYMOBILE MAN; CEMENT DUMPER; CONCRETE CORE CUTTER, SAWMAN AND CEMENT GRINDING OPERATOR; CONCRETE CURER; CRIBBER OR SHORER; CUTTING TORCH OPERATOR (DEMOLITION); DRILLER; DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES; GAS & OIL PIPELINE WRAPPER; HEAD ROCK SLINGER; JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER; LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE; MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATICLABORER GROUP 2 ASPHALT RAKER, IRONER, SPREADER; BUGGYMOBILE MAN; CEMENT DUMPER; CONCRETE CORE CUTTER, SAWMAN AND CEMENT GRINDING OPERATOR; CONCRETE CURER; CRIBBER OR SHORER; CUTTING TORCH OPERATOR (DEMOLITION); DRILLER; DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES; GAS & OIL PIPELINE WRAPPER; HEAD ROCK SLINGER; JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER; LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE; MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HAND GUIDED DITCH WITCH AND HAND-TYPE ROLLER); PAVING, AIRPORT RUNWAYS & SIMILAR WORK; PESTICIDE, HERBICIDE, INSECTICIDE APPLICATOR; POTHOLER; POWDERMAN; ROCK SLINGER; SANDBLASTER (NOZZLEMAN); SANDBLASTER (POT TENDER); SHOTCRETE (NOZZLEMAN); SHOTCRETE (POT TENDER); STEEL HEADERBOARD MAN. (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE | $41.39 | $27.22 | NV20260002 |
| LABORERBULLGANG, MUCKER, TRACKMAN (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE)LABORER: BULLGANG, MUCKER, TRACKMAN (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $46.44 | $27.27 | NV20260002 |
| LABORERSHAFT, RAISE, STOPE MINER (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE)LABORER: SHAFT, RAISE, STOPE MINER (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $47.69 | $27.27 | NV20260002 |
| LABORERMINER-TUNNEL HARDROCK (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE)LABORER: MINER-TUNNEL HARDROCK (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $46.69 | $27.27 | NV20260002 |
| LABORER GROUP 1BUILDING/OFFICE CLEANUP, FLAGPERSON; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATELABORER GROUP 1: BUILDING/OFFICE CLEANUP, FLAGPERSON; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $46.40 | $29.35 | NV20260001 |
| LABORER GROUP 1 BUILDING/OFFICE CLEANUPCESSPOOL DIGGER & INSTALLER; DRINKING WATER; FENCE BUILDER; FINE GRADER, HIGHWAY & STREET; FLAGPERSON; GAS & OIL PIPELINE LABORER; GAS & OIL PIPELINE WRAPPER - POT TENDER AND FORM MAN; GUINEA CHASER; PACKING ROD STEEL AND PLANS; GENERAL (CONSTRUCTION CLEANUP); DEMOLITION; LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER; MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS; RIP RAP STONE PAVER; ROTO-SCRAPER; SCALER; SEPTIC TANK DIGGER & INSTALLER (LEADMAN); TANK SCALER AND CLEANER; TOOL ATTENDANT (LABORER GROUP 1 BUILDING/OFFICE CLEANUP: CESSPOOL DIGGER & INSTALLER; DRINKING WATER; FENCE BUILDER; FINE GRADER, HIGHWAY & STREET; FLAGPERSON; GAS & OIL PIPELINE LABORER; GAS & OIL PIPELINE WRAPPER - POT TENDER AND FORM MAN; GUINEA CHASER; PACKING ROD STEEL AND PLANS; GENERAL (CONSTRUCTION CLEANUP); DEMOLITION; LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER; MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS; RIP RAP STONE PAVER; ROTO-SCRAPER; SCALER; SEPTIC TANK DIGGER & INSTALLER (LEADMAN); TANK SCALER AND CLEANER; TOOL ATTENDANT (JOBSITE ONLY); TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE OF BRUSH SHEDDERS; WINDOW CLEANER (ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE) | $41.13 | $27.22 | NV20260002 |
| LABORER GROUP 2LABORER - GENERAL (CONSTRUCTION CLEANUP, ETC.), DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT (JOBSITE ONLY), GAS & OIL PIPELINE, WINDOW CLEANERS, FINE GRADER, HIGHWAY & STREET PAVING, AIRPORT RUNWAYS & SIMILAR WORK, GUINEA CHASER, LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER, PACKING ROD STEEL AND PANS; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATELABORER GROUP 2: LABORER - GENERAL (CONSTRUCTION CLEANUP, ETC.), DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT (JOBSITE ONLY), GAS & OIL PIPELINE, WINDOW CLEANERS, FINE GRADER, HIGHWAY & STREET PAVING, AIRPORT RUNWAYS & SIMILAR WORK, GUINEA CHASER, LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER, PACKING ROD STEEL AND PANS; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $47.34 | $29.35 | NV20260001 |
| LABORER GROUP 3ASBESTOS ABATEMENT, CHUCKTENDER (EXCEPT TUNNELS), GAS & OIL PIPELINE WRAPPER-POT TENDER AND FORM MAN, OPERATOR OF CEMENT GRINDING MACHINE, ROTO-SCRAPER, SANDBLASTER (POT TENDER), SCALER, SEPTIC TANK DIGGER & INSTALLER (LEADMAN),MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS, TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHEDDERS, TANK SCALER AND CLEANER, CONCRETE SAWMAN, CONCRETE CORE CUTTER, MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECLABORER GROUP 3: ASBESTOS ABATEMENT, CHUCKTENDER (EXCEPT TUNNELS), GAS & OIL PIPELINE WRAPPER-POT TENDER AND FORM MAN, OPERATOR OF CEMENT GRINDING MACHINE, ROTO-SCRAPER, SANDBLASTER (POT TENDER), SCALER, SEPTIC TANK DIGGER & INSTALLER (LEADMAN),MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS, TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHEDDERS, TANK SCALER AND CLEANER, CONCRETE SAWMAN, CONCRETE CORE CUTTER, MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HANDGUIDED DITCH WITCH AND HAND-TYPE ROLLER), ASPHALT RAKER, IRONER, SPREADER, SLURRY SEALER, BUGGYMOBILE MAN, CEMENT DUMPER, CONCRETE CURER, CESSPOOL DIGGER & INSTALLER, RIP RAP STONE PAVER; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $47.55 | $29.35 | NV20260001 |
| LABORER GROUP 4JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER, ROCK SLINGER, LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE, GAS AND OIL PIPELINE WRAPPER, CUTTING TORCH OPERATOR (DEMOLLITION); ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATELABORER GROUP 4: JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER, ROCK SLINGER, LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE, GAS AND OIL PIPELINE WRAPPER, CUTTING TORCH OPERATOR (DEMOLLITION); ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $47.79 | $29.35 | NV20260001 |
| LABORER GROUP 5DRILLER, HEAD ROCK SLINGER, SANDBLASTER (NOZZLEMAN), STEEL HEADERBOARD MAN, POWDERMAN, CRIBBER OR SHORER; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATELABORER GROUP 5: DRILLER, HEAD ROCK SLINGER, SANDBLASTER (NOZZLEMAN), STEEL HEADERBOARD MAN, POWDERMAN, CRIBBER OR SHORER; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $48.05 | $29.35 | NV20260001 |
| LABORER GROUP 6HERBICIDE, PESTICIDE, HANTAVIRUS SUPPRESSION; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATELABORER GROUP 6: HERBICIDE, PESTICIDE, HANTAVIRUS SUPPRESSION; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $48.35 | $29.35 | NV20260001 |
| LaborersGroup 6F High Scaler | $60.15 | $34.24 | NV20260091 |
| LaborersGroup 6E (Tunnel Boring Machine) | $53.69 | $34.24 | NV20260091 |
| LaborersGroup 6D (Miner-Welder) | $54.05 | $34.24 | NV20260091 |
| LaborersGroup 6C (Bull Gang, Mucker, Trackman) | $53.44 | $34.24 | NV20260091 |
| LaborersGroup 6B (Miner-Tunnel (Hard Rock) | $53.69 | $34.24 | NV20260091 |
| LaborersGroup 6A (Shaft, Raise, Stop Miner) | $54.19 | $34.24 | NV20260091 |
| LaborersGroup 5 (Driller (core, diamond or wagon); Air track drill (all types); Joy driller model TW-M-2A. Gardner-Denver model DH 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated Miami, Florida, February 3, 1954); Gas and oil pipeline fusion; Gas and oil pipeline wrappers, 6"" pipe and over) | $41.53 | $34.24 | NV20260091 |
| LaborersGroup 4 (Cribber or shorer, lagging, sheeting, trench bracing, hand guided lagging hammer head rock slinger; Powderman-blaster, all work of loading holes, placing and blasting of all powder and explosives if whatever type, regardless of method used for such loading and placing;Sandblaster (nozzleman) Steel header-board man Construction Specialist) | $41.43 | $34.24 | NV20260091 |
| LaborersGroup 8 (Attending to, handling and fueling single diaphragm pumps, insulation pumps, plasterer pumps, monocoat pumps, grout pumps; Mason finisher; Plaster Tending shall consist of preparation of materials and the handling and conveying of materials to be used by mechanics of other crafts, whether such preparation is by hand or any other process. After the material has been prepared, tending shall include the supplying and conveying of said material and other materials, to such mechanic, whether | $42.43 | $34.24 | NV20260091 |
| LaborersGroup 7 (Asbestos Abatement; Lead Abatement; Hazardous Waste Abatement; Petro-Chemical Abatement; Radiation Remediation; Microbial Remediation; Employees shall be properly certified and/or licensed at time of dispatch) | $41.34 | $34.24 | NV20260091 |
| LaborersGroup 3 (Cutting torch operator Welding in connection with laborers work Gas and oil pipeline wrapper; Gas and oil pipeline laborer, certified Jackhammer and/or pavement beaker; Installing, laying and the connections of all metallic and non-metallic pipe, p.v.c. and drop inlet and duct bank, including landscape sprinklers, sewer pipe, drain pipe and underground tile; Cement dumper (on one yard or larger mixers and handling bulk cement) Concrete core cutter; Concrete curer, impervious membrane an | $41.34 | $34.24 | NV20260091 |
| LaborersGroup 3A (Placement of all concrete, including red concrete by any means Concrete Specialists; Mudd Cutter; Concrete vibrator operator, all sizes; Concrete Dumper; Slickline/Hoseman/Dumpman) | $42.34 | $34.24 | NV20260091 |
| LaborersGroup 2 (Asphalt raker, ironer, spreader, and luteman Buggymobile man; Cesspool digger and installer Chuck tender (except tunnels); Gas and oil pipeline wrapper, pot tender and form man Making and caulking of all non-metallic pipe joints; Operators and tenders of pneumatic and electric tools, video x-ray, vibrating machines, hand propelled trenching machines, vacuum truck/ hydro excavation operation, and all associated components for Is operation, impact wrench multi-plate and similar mechanical | $41.24 | $34.24 | NV20260091 |
| LaborersGroup 1 (Traffic Control Tech and working Traffic Control Supervisor; All pressure washing, all surface preparation for patching and grouting, dry packing of concrete and filling of form bolt holes; Subgrade, finish/fine grade with use of granule or non-granule material, vapor barriers, lasers, string line, setting and leveling on highway, street paving, sidewalk, driveways, airport runways and similar type heavy construction; Gas and oil pipeline; Guinea chaser; Laborer, general, construction, | $41.03 | $34.24 | NV20260091 |
| LaborersGroup 1A (Flagger/flag person; Pilot car; Final clean up subject to this rate shall mean: Polishing furniture; Polishing stainless steel in hotel kitchens; Sweeping and vacuuming hallways and finished rooms and completed casino areas; Washing windows on first floor and similar duties) | $39.53 | $34.24 | NV20260091 |
| LINE CONSTRUCTIONHEAVY EQUIPMENT OPERATOR (ZONE PAY -NNSS $5.00; NTTR $5.00)LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (ZONE PAY -NNSS $5.00; NTTR $5.00) | $62.08 | $31.99 | NV20260002 |
| LINE CONSTRUCTIONLINEMAN (ZONE PAY -NNSS $5.00; NTTR $5.00)LINE CONSTRUCTION: LINEMAN (ZONE PAY -NNSS $5.00; NTTR $5.00) | $62.08 | $31.99 | NV20260002 |
| LINE CONSTRUCTIONGROUNDMAN (ZONE PAY -NNSS $5.00; NTTR $5.00)LINE CONSTRUCTION: GROUNDMAN (ZONE PAY -NNSS $5.00; NTTR $5.00) | $49.66 | $31.50 | NV20260002 |
| LINE CONSTRUCTIONLINEMAN | $68.11 | $25.40 | NV20260001 |
| LINE CONSTRUCTIONGROUNDMAN | $55.17 | $25.02 | NV20260001 |
| LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00 | $68.11 | $25.40 | NV20260001 |
| MARBLE SETTER(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)MARBLE SETTER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.44 | $18.79 | NV20260002 |
| MARBLE SETTER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00MARBLE SETTER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $50.27 | $18.29 | NV20260001 |
| Mechanical InsulatorJourneyman | $62.00 | $23.53 | NV20260091 |
| MillwrightWelder (certified)(add $3 to Journey base) | $53.83 | $0.00 | NV20260091 |
| MillwrightJourneyman | $50.83 | $33.14 | NV20260091 |
| MILLWRIGHT(ZONE PAY: ZONE A: LAS VEGAS- FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS-$4.25)MILLWRIGHT (ZONE PAY: ZONE A: LAS VEGAS- FREE ZONE ZONE B: MERCURY, FORWARD & NTTR AREAS-$4.25) | $54.16 | $27.84 | NV20260002 |
| MILLWRIGHT ZONE PAY ZONE 1FREE ZONE; ZONE 2: $2.50 - 40-60 MILES; ZONE 3: $4.25 - OVER 60 MILESMILLWRIGHT ZONE PAY ZONE 1: FREE ZONE; ZONE 2: $2.50 - 40-60 MILES; ZONE 3: $4.25 - OVER 60 MILES | $50.77 | $28.28 | NV20260001 |
| Operating EngineersGroup 11 (Dynamic Compactor LDC350 (or similar types); Heavy Duty Repairman-Welder Combination (Multi-Shift); Welder-Certified (Multi-Shift) | $65.12 | $36.69 | NV20260091 |
| Operating EngineersGroup 9 (Heavy Duty Repairman (Multi-Shift)) | $65.00 | $36.69 | NV20260091 |
| Operating EngineersGroup 8 (Allroad Mobile Timber Harvester (Albach or similar types); Asphalt or Concrete Spreading Operator (Tamping or Finishing); Asphalt Paving Machine Operator (Barber Greene or similar type); Asphalt-Rubber Distributor Operator; Backhoe Operator (up to and including 3/4 yd.) Small Ford, Case or similar.; Backhoe Operator (over 3/4 yd. and up to 5 cu. yd. M.R.C); Barrier Rail mover; Cable Bundling Machine Operator; Cable Trenching Machine Operator (Spider Plow or similar types); Cast in Place | $63.90 | $36.69 | NV20260091 |
| Operating EngineersGroup 7 (Welder - General (Multi-Shift)) | $64.89 | $36.69 | NV20260091 |
| Operating EngineersGroup 6 (Articulating Material Hauler; Asphalt Plant Engineer; Batch Plant Operator; Bit Sharpener; Concrete Joint Machine Operator (canal and similar type); Concrete Placer Operator; Concrete Planer; Dandy Digger; Deck Engine Operator; Deck Engineer; Derrickman (Oilfield type); DeSanding Plant Operator; Drilling Machine Operator, Bucket or Auger Types (Calweld 100 Bucket or similar types - Watson 1000 Auger or similar types -Texoma 330, 500 or 600 Auger or similar types - drilling depth of 45' | $63.79 | $36.69 | NV20260091 |
| Operating EngineersGroup 5 (Equipment Greaser (Grease Truck/Multi-Shift)) | $64.67 | $36.69 | NV20260091 |
| Operating EngineersGroup 4 (All Terrain Placers/All Terrain Stone Slingers; Asphalt Plant Fireman; Backhoe Operator (Mini-Max or similar type); Boring Machine and/or pilot Tube Machine Operator; Boring System Electronic Tracking Locator; Boxman or Mixerman (Asphalt or Concrete); Chip Spreading Machine Operator; Concrete Cleaning Decontamination Machine Operator; Concrete Pump Operator (small portable); Direct Push Operator (Geoprobe or similar types); Drilling Machine Operator, Small Auger Types (Texoma Super Econ | $63.57 | $36.69 | NV20260091 |
| Operating EngineersGroup 3 (Asphalt-Rubber Blend Operator; Bobcat or similar type (Skid Steer); Equipment Greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter Radioman (ground); Stationary Pipe Wrapping and Cleaning Machine Operator) | $62.08 | $36.69 | NV20260091 |
| Operating EngineersGroup 2 (Asphalt-Rubber Plant Operator (Nurse Tank Operator); Coil Rig Operator; Concrete Mixer Operator - Skip type; Conveyor Operator; Fireman; Forklift Operator (over 5 Tons); Heliostat assembly System (Operator Related Work); Hydrostatic Pump Operator; Oiler Crusher (Asphalt or Concrete Plant); PJU Side Dump Jack; Profilograph; Screening and Conveyor Machine Operator (or similar types); Skiploader (wheel type up to 3/4 yd. without attachment); Tar Pot Fireman; Temporary Heating Plant Operato | $61.79 | $36.69 | NV20260091 |
| Operating EngineersGroup 25 (Concrete Pump Operator - truck mounted (Oiler required when boom over 105' or 36 meters); Pedestal Concrete Pump Operator; Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Tandem Push-Pull System (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Spyder Excavator Operator, with all attachments) | $65.69 | $36.69 | NV20260091 |
| Operating EngineersGroup 24 (Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Tandem Push-Pull System (single engine, over 50 yds. struck); Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Tandem Push-Pull System (multiple engine, Euclid, Caterpillar and similar, over 25 yds. & up to 50 yds. struck)) | $65.52 | $36.69 | NV20260091 |
| Operating EngineersGroup 23 (Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Tandem Push-Pull System (single engine, Caterpillar, Euclid, Athey Wagon, and similar types with any and all attachments over 25 yds. and up to and including 50 cu. yds. struck); Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Tandem Push-Pull System (multiple engine, up to and including 25 yds. struck)) | $65.40 | $36.69 | NV20260091 |
| Operating EngineersGroup 22 (Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Tandem Push-Pull System (single engine, up to and including 25 yds. struck)) | $65.29 | $36.69 | NV20260091 |
| Operating EngineersGroup 21 (Rubber-Tired Earth Moving Equipment Operator, operating in Tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)) | $65.19 | $36.69 | NV20260091 |
| Operating EngineersGroup 20 (Rubber-Tired Earth Moving Equipment Operator, operating in Tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - single engine, over 50 yds. struck); Rubber-Tired Earth Moving Equipment Operator, operating in Tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)) | $65.02 | $36.69 | NV20260091 |
| Operating EngineersGroup 1 (Bargeman; Brakeman; Compressor Operator; Ditch Witch, with seat or similar type equipment; Elevator Operator inside; Engineer Oiler; Forklift Operator (under 5 Tons); Generator Operator; Generator, Pump or Compressor Plant Operator; Inertial Profiler; Pump Operator; Signalman; Steam Cleaner/Pressure Washer; Switchman) | $60.84 | $36.69 | NV20260091 |
| Operating EngineersGroup 19 (Rotex Concrete Belt Operator (or similar types); Rubber-Tired Earth Moving Equipment Operator, operating in Tandem (scrapers, belly dumps, and similar types in any combination, including compaction units - single engine, Caterpillar, Euclid, Athey Wagon, and similar types with any and all attachments over 25 yds. and up to and including 50 cu. yds. struck); Rubber-Tired Earth Moving Equipment Operator, operating in Tandem (scrapers, belly dumps, and similar types in any combination, ex | $64.90 | $36.69 | NV20260091 |
| Operating EngineersGroup 18 (Rubber-Tired Earth Moving Equipment Operator, operating in Tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - single engine, up to and including 25 yds. struck)) | $64.79 | $36.69 | NV20260091 |
| Operating EngineersGroup 17 (Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Push-Pull System (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Tandem Tractor Operator (operating crawler type tractors in tandem - Quad 9 and similar type)) | $64.69 | $36.69 | NV20260091 |
| Operating EngineersGroup 16 (Excavator track/Rubber-Tired-with all attachments (Operating Weight exceeding 200,000lbs); Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Push-Pull System (single engine, over 50 yds. struck); Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Push-Pull System (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)) | $64.52 | $36.69 | NV20260091 |
| Operating EngineersGroup 15 (Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Push-Pull System (single engine, Caterpillar, Euclid, Athey Wagon, and similar types with any and all attachments over 25 yds. and up to and including 50 cu. yds. struck); Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Push-Pull System (multiple engine - up to and including 25 yds. struck)) | $64.40 | $36.69 | NV20260091 |
| Operating EngineersGroup 14 (Canal Liner Operator (not less than four (4) employees - Operator, Oiler, Welder, Mechanic, Grade Checker required); Canal Trimmer Operator; Drilling machine Operator, Bucket or auger Types (Calweld, Auger 200 CA or similar types - Watson, August 6000 or similar types-Hughes Super Duty, Auger 200 or similar types - drilling depth of 300"" maximum); Remote Controlled Earth Moving Equipment Operator (no one (1) Operator shall operate more than two (2) pieces of earth moving equipment at | $64.32 | $36.69 | NV20260091 |
| Operating EngineersGroup 13 (Rubber-Tired Earth Moving Equipment Operator, operating equipment with the Push-Pull System (single engine, up to and including 25 yds. struck)) | $64.29 | $36.69 | NV20260091 |
| Operating EngineersGroup 10 (Backhoe Operator (over 5 cu.yds. M.R.C); Drilling Machine Operator, Bucket or Auger Types (Calweld 200 B Bucket or similar types - Watson 3000 or 5000 Auger or similar types - Texoma 900 Auger or similar types - drilling depth of 105' maximum); Dual Drum Mixer; Heavy Duty Repairman-Welder Combination; Hydraulic Casing Oscillator Operator-drilling depth of 105' maximum; Monorail Locomotive Operator (diesel, gas or electric); Motor Patrol - Blade Operator (single engine); Multiple Engine | $64.02 | $36.69 | NV20260091 |
| Operating EngineersGroup 12 (Auto Grader Operator; Automatic Slip Form Operator; Backhoe Operator (over 7 cu. Yds, M.R.S); Drilling Machine Operator, Bucket or Auger Types (Calweld, Auger 200 CA or similar types - Watson, Auger 6000 or similar types- Hughes Super Duty, Auger 200 or similar types - drilling depth of 175' maximum); Excavator Track/Rubber Tired - with all attachments (Operating Weight 100,000 lbs. - 200,000 lbs.); Hoe Ram or similar with Compressor; Hydraulic Casing Oscillator Operator - drilling dep | $64.19 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 3 (Hydraulic Boom Truck (Pitman; Knuckleboom; Spyder Crane (or similar type); Stinger Crane (Austin-Western or similar type); Tugger Hoist Operator (1 drum)) | $63.79 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 5 (Pedestal Crane Operator; Shovel, Dragline, Clamshell Operator (over 5 cu. yds. M.R.C.); Tower Crane Repairman; Tugger Hoist Operator (3 drum)) | $64.02 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 6 (Crawler Transporter Operator (Track or Rubber-Tired, Goldhofer or similar type); Derrick Barge Operator (under 25 tons, up to and including 50 tons M.R.C.); Hoist Operator, Stiff Legs, Guy Derrick or similar type (up to and including 25 ton M.R.C.); Shovel, Dragline, Clamshell Operator (over 7 cu. yds. M.R.C.); Timber Handler - Sennebogen or similar types (tree hoisting/removal/site clearing); Rotational Telehandler Operator (when Crane Certification is required); Self-Propelled Modular | $64.19 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 7 (Derrick Barge Operator (over 25 tons, up to and including 50-ton M.R.C.); Highline Cableway Operator; Hoist Operator, Stiff Legs, Guy Derrick or similar type (over 25 tons, up to and including 50-ton M.R.C.); K-Crane; Polar Crane Operator; Self-Erecting Tower Crane Operator Maximum Lifting Capacity ten (10) tons. One (1) ton operator)) | $64.36 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 12 (Crane Operator (up to and including 40-ton capacity)) | $65.99 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 13 (Derrick Barge Operator (over 100 tons, up to and including 200-ton M.R.C.); Hoist Operator, Stiff Legs, Guy Derrick or similar type (over 100 tons, up to and including 200-ton M.R.C)) | $66.36 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 14 (Luffing Boom Oiler) | $67.20 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 15 (Derrick Barge Operator (over 200 tons, up to and including 300-ton M.R.C.); Hoist Operator, Stiff Legs, Guy Derrick or similar type (over 200 tons, up to and including 300-ton M.R.C.)) | $67.36 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 20 (Crane Operator (over 200 tons, up to and including 250-ton M.R.C.)) | $70.55 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 21 (Crane Operator (over 250 tons, up to and including 300-ton M.R.C.)) | $71.16 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 11 (Crane Heavy Duty Repairman) | $65.66 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 22 (Crane Operator (over 300 tons, up to and including 350-ton M.R.C.)) | $71.92 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 23 (Crane Operator (over 350 tons, up to and including 500-ton M.R.C.)) | $72.38 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 24 (Crane Operator (over 500 tons M.R.C.)) | $72.88 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 2 (Bridge-Typle Unloader and Turntable Operator; Helicopter Hoist Operator) | $63.57 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 4 (Bridge Crane Operator; Creter Crane Operator; Hoist Operator (Chicago Boom and similar type); Lift Mobile Operator; Lift Slab Machine Operator (Vagtborg and similar types); Material Hoist/Manlift Operator; Ojjo Earth Truss Driver Machine Operator or similar types; PD10 Pile driver (or similar types); Polar Gantry Crane Operator; Prentice Self-Loader; Self-Climbing Scaffold (or similar type); Shovel, Dragline, Clamshell Operator (over 3/4 yd. and up to 5 cu. yds. M.R.C.); Silent Piler (G | $63.90 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 10 (ABI/Fundex Machine; Derrick Barge Operator (over 50 tons, up to and including 100-ton M.R.C); Hoist Operator, Stiff Legs, Guy Derrick or similar type (over 50 tons, up to and including 100-ton M.R.C); Vibrocat Stone Column Operator or similar types) | $65.36 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 8 (Oiler (40 tons up to including 200 tons M.R.C)) | $64.52 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 9 (Oiler (Over 200 tons)) | $65.20 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 16 (Crane Operator (over 40 tons, up to and including 79-ton M.R.C.) | $67.41 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 17 (Crane Operator (over 80 Tons, up to and including 150-ton M.R.C.)) | $67.91 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 18 (Derrick Barge Operator (over 300 tons); Helicopter Pilot; Hoist Operator, Stiff Legs, Guy Derrick or similar type (over 300 tons); Tower Crane Operator (over 300 tons)) | $68.36 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 19 (Crane Operator (over 150 tons, up to and including 200-ton M.R.C.)) | $69.94 | $36.69 | NV20260091 |
| Operating Engineers-Piledriver & Hoisting EquipmentGroup 1 (A-Frame or Winch Truck Operator; Ross Carrier Operator Jobsite)) | $63.43 | $36.69 | NV20260091 |
| PAINTERFLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER (ZONE PAY- NNSS $5.00; NTTR $5.00)PAINTER: FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER (ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.40 | $24.18 | NV20260002 |
| PAINTER(ZONE PAY- NNSS $5.00; NTTR $5.00)PAINTER (ZONE PAY- NNSS $5.00; NTTR $5.00) | $51.79 | $24.18 | NV20260002 |
| PAINTER, GROUP 1BRUSH AND ROLLER ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25PAINTER, GROUP 1: BRUSH AND ROLLER ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 | $52.75 | $28.70 | NV20260001 |
| PAINTER, GROUP 2SPRAY PAINTER SPECIALITY APPLICATIONS, SANDBLASTER, POT TENDER, NOZZLEMAN, TAPERS, FLUSHERS AND DETAILING, PAPER HANGER, SIGN PAINTING ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25PAINTER, GROUP 2: SPRAY PAINTER SPECIALITY APPLICATIONS, SANDBLASTER, POT TENDER, NOZZLEMAN, TAPERS, FLUSHERS AND DETAILING, PAPER HANGER, SIGN PAINTING ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 | $52.75 | $28.70 | NV20260001 |
| PAINTER, GROUP 3FLOOR COVERS, CARPET, LINOLEUM, RESILIENT TILE WORKERS, SPRAY PAINTER (STRUCTURAL STEEL, OR WHEN WORKING FROM RIGGING, SWING STAG OR BOATSWAIN CHAIR), STEEPLE-JACK AND GLAZIER. ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25PAINTER, GROUP 3: FLOOR COVERS, CARPET, LINOLEUM, RESILIENT TILE WORKERS, SPRAY PAINTER (STRUCTURAL STEEL, OR WHEN WORKING FROM RIGGING, SWING STAG OR BOATSWAIN CHAIR), STEEPLE-JACK AND GLAZIER. ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 | $52.75 | $28.70 | NV20260001 |
| PAINTER, SPRAY AND PAPERHANGER SIGN(ZONE PAY- NNSS $5.00; NTTR $5.00)PAINTER, SPRAY AND PAPERHANGER SIGN (ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.14 | $24.18 | NV20260002 |
| PAINTER, TAPER, FLUSHER AND DETAILER(ZONE PAY- NNSS $5.00; NTTR $5.00)PAINTER, TAPER, FLUSHER AND DETAILER (ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.14 | $24.18 | NV20260002 |
| Painter/Taper/PaperhangerJourneyman | $50.62 | $25.60 | NV20260091 |
| PiledriverDriverman | $52.32 | $30.90 | NV20260091 |
| PiledriverCertified Welder | $53.32 | $30.90 | NV20260091 |
| PiledriverDiver-Diving (Wet Pay) | $117.10 | $30.90 | NV20260091 |
| PiledriverStand By Diver | $58.55 | $30.90 | NV20260091 |
| PiledriverTender | $57.55 | $30.90 | NV20260091 |
| PIPEFITTER(INCLUDING CFC HVACR TECHNICIAN, INSERT GAS WELDER, BOILER TECHNICIAN) ZONE PAY: ZONE 1: $0.00 - 0-20 MILES; ZONE 2: $3.75 - 20.01-45 MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVERPIPEFITTER (INCLUDING CFC HVACR TECHNICIAN, INSERT GAS WELDER, BOILER TECHNICIAN) ZONE PAY: ZONE 1: $0.00 - 0-20 MILES; ZONE 2: $3.75 - 20.01-45 MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVER | $65.79 | $26.55 | NV20260001 |
| PIPEFITTERINCLUDING INERT GAS WELDER (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25)PIPEFITTER: INCLUDING INERT GAS WELDER (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | NV20260002 |
| PlastererJourneyman | $54.53 | $19.61 | NV20260091 |
| PLASTERER(ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50)PLASTERER (ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $42.03 | $28.05 | NV20260002 |
| PLASTERER ZONE PAY $4.00PLASTERER ZONE PAY $4.00 | $55.79 | $21.95 | NV20260001 |
| PLUMBER(INCLUDING LEAD BURNER) ZONE PAY: ZONE 1: $0.00 - 0-20 MILES; ZONE 2: $3.75 - 20.01-45 MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVERPLUMBER (INCLUDING LEAD BURNER) ZONE PAY: ZONE 1: $0.00 - 0-20 MILES; ZONE 2: $3.75 - 20.01-45 MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVER | $65.79 | $26.55 | NV20260001 |
| PLUMBERINCLUDLING LEAD BURNER (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25)PLUMBER: INCLUDLING LEAD BURNER (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | NV20260002 |
| Plumber/PipefitterJourneyman | $60.00 | $27.43 | NV20260091 |
| POWER EQUIPMENT OPERATORGROUP 7 BODY AND FENDER MECHANIC; GLOBAL POSITION SYSTEMS PARTY CHIEF; HEAVY DUTY WELDER AND REPAIRMAN; LIGHT DUTY REPAIRMAN (HYBRID/ALL ELECTRIC); PARTY CHIEF. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILESPOWER EQUIPMENT OPERATOR GROUP 7 BODY AND FENDER MECHANIC; GLOBAL POSITION SYSTEMS PARTY CHIEF; HEAVY DUTY WELDER AND REPAIRMAN; LIGHT DUTY REPAIRMAN (HYBRID/ALL ELECTRIC); PARTY CHIEF. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.14 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATORGROUP 10 CRANE OPERATOR ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILESPOWER EQUIPMENT OPERATOR: GROUP 10 CRANE OPERATOR ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $64.48 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATORGROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; ENGINEER- OILER AND SIGNALMAN; GUPIE OPERATOR (CEMENT); STEAM CLEANER/PRESSURE WASHER, SWITCHMAN OR BRAKEMAN, BLADE OPERATOR; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILESPOWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; ENGINEER- OILER AND SIGNALMAN; GUPIE OPERATOR (CEMENT); STEAM CLEANER/PRESSURE WASHER, SWITCHMAN OR BRAKEMAN, BLADE OPERATOR; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $55.94 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATORGROUP 9 RUBBER TIRED, TANDEM, MULTIPLE ENGINE, EARTH-MOVING EQUIPMENT OPERATOR; WATER TREATMENT/DISTRIBUTION OPERATOR; PLANT OPERATOR; CRANE OILER. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILESPOWER EQUIPMENT OPERATOR GROUP 9 RUBBER TIRED, TANDEM, MULTIPLE ENGINE, EARTH-MOVING EQUIPMENT OPERATOR; WATER TREATMENT/DISTRIBUTION OPERATOR; PLANT OPERATOR; CRANE OILER. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.89 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATORGROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEM ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERATOR (CONCRETE OR ASPHALT PLANT); FISHING TOOL ENGINEER; HIGHLINE CABLEWAY SIGNALMAN; HORIZONTAL DIRECTIONAL DRILLING MACHINE; INSTRUMENTMAN; LOCOMOTIVE ENGINEER; MICRO TUNNELING (ABOVE GROUND TUNNEL); MINI-EXCAVATOR; MUD PLANT OPERATOR; POWER SWEEPER OPERATOR; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR; SEEDER; TRENCHING MACHINE OPERATOR (UP TO 6FT. DEPTH); VACUUM TRUCK.POWER EQUIPMENT OPERATOR GROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEM ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERATOR (CONCRETE OR ASPHALT PLANT); FISHING TOOL ENGINEER; HIGHLINE CABLEWAY SIGNALMAN; HORIZONTAL DIRECTIONAL DRILLING MACHINE; INSTRUMENTMAN; LOCOMOTIVE ENGINEER; MICRO TUNNELING (ABOVE GROUND TUNNEL); MINI-EXCAVATOR; MUD PLANT OPERATOR; POWER SWEEPER OPERATOR; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR; SEEDER; TRENCHING MACHINE OPERATOR (UP TO 6FT. DEPTH); VACUUM TRUCK. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $58.67 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATORGROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEMS ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERATOR (CONCRETE OR ASPHALT PLANT); FISHING TOOL ENGINEER; HIGHLINE CABLEWAY SIGNALMAN; HORIZONTAL DIRECTIONAL DRILLING MACHINE; INSTRUMENTMAN; LOCOMOTIVE ENGINEER; MICO-TUNNELING (ABOVE GROUND TUNNEL); MINI EXCAVATOR OPERATOR; MUD PLANT OPERATOR; POWER SWEEPER OPERATOR; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR; SEEDER; TRENCHING MACHINE OPERATOR, VACCUM TRUCK. (ZONE PAYPOWER EQUIPMENT OPERATOR GROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEMS ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERATOR (CONCRETE OR ASPHALT PLANT); FISHING TOOL ENGINEER; HIGHLINE CABLEWAY SIGNALMAN; HORIZONTAL DIRECTIONAL DRILLING MACHINE; INSTRUMENTMAN; LOCOMOTIVE ENGINEER; MICO-TUNNELING (ABOVE GROUND TUNNEL); MINI EXCAVATOR OPERATOR; MUD PLANT OPERATOR; POWER SWEEPER OPERATOR; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR; SEEDER; TRENCHING MACHINE OPERATOR, VACCUM TRUCK. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $56.52 | $34.00 | NV20260002 |
| POWER EQUIPMENT OPERATORGROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; BLADE OPERATOR, ENGINEER-OILER AND SIGNALMAN; RAIL MOUNTED JLG; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; BLADE OPERATOR, ENGINEER-OILER AND SIGNALMAN; RAIL MOUNTED JLG; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $53.79 | $34.00 | NV20260002 |
| POWER EQUIPMENT OPERATORGROUP 9 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; RUBBER-TIRED ANYTANDEM, MULTIPLE ENGINE EARTH-MOVING EQUIPMENT OPERATOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)POWER EQUIPMENT OPERATOR GROUP 9 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; RUBBER-TIRED ANYTANDEM, MULTIPLE ENGINE EARTH-MOVING EQUIPMENT OPERATOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $58.74 | $34.00 | NV20260002 |
| POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR(SKID TYPE); CONVEYOR OPERATOR AND BELTMAN; FIREMAN; GENERATOR, PUMP OR COMPRESSOR OPERATOR (2 TO 5 UNITS INCLUSIVE, OVER 5 UNITS; $0.10 PER HOUR FOR EACH ADDITIONAL UNIT UP TO 10 UNITS, PORTABLE UNITS); GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDE DUMP JACK; SCREENING AND CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPE); SKIPLOADER ( WHEELTYPE FORD; FERGUSON; JEEP OR SIMILAR TYPE, 3/4 YARD OR LESS (WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATIPOWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR (SKID TYPE); CONVEYOR OPERATOR AND BELTMAN; FIREMAN; GENERATOR, PUMP OR COMPRESSOR OPERATOR (2 TO 5 UNITS INCLUSIVE, OVER 5 UNITS; $0.10 PER HOUR FOR EACH ADDITIONAL UNIT UP TO 10 UNITS, PORTABLE UNITS); GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDE DUMP JACK; SCREENING AND CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPE); SKIPLOADER ( WHEELTYPE FORD; FERGUSON; JEEP OR SIMILAR TYPE, 3/4 YARD OR LESS (WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $56.89 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR(SKID TYPE); CONVEYOR AND BELTMAN; FIREMAN; GENERATOR PUMP OR COMPRESSOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDEDUMP JACK; SCREENING AND CONVEYOR MACHINE (SIMILAR TYPE); SKIPLOADER (WHEELTYPE, FORD, FERGUSON, JEEP OR SIMILAR TYPE, 3/4 YARDS OR LESS, WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR; TRUCK CRANE OILER. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR (SKID TYPE); CONVEYOR AND BELTMAN; FIREMAN; GENERATOR PUMP OR COMPRESSOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDEDUMP JACK; SCREENING AND CONVEYOR MACHINE (SIMILAR TYPE); SKIPLOADER (WHEELTYPE, FORD, FERGUSON, JEEP OR SIMILAR TYPE, 3/4 YARDS OR LESS, WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR; TRUCK CRANE OILER. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $54.74 | $34.00 | NV20260002 |
| POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE(SKID STEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); GLOBAL POSITION SYSTEMS CHAINMAN AND RODMAN; HYDRA-HAMMER (OR SIMILAR TYPE EQUIPMENT); MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; POWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER-DRIVEN JUMBO FORM SETTER; RODMAN AND CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (ORPOWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE (SKID STEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); GLOBAL POSITION SYSTEMS CHAINMAN AND RODMAN; HYDRA-HAMMER (OR SIMILAR TYPE EQUIPMENT); MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; POWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER-DRIVEN JUMBO FORM SETTER; RODMAN AND CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-ROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; TOWBLADE OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $57.18 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE(SKIDSTEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); HYDRA-HAMMER OR SIMILAR TYPE EQUIPMENT; MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; PPOWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER DRIVEN JUMBO FORM SETTER OPERATOR; RODMAN & CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-PROPELLED TAR PIPELPOWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE (SKIDSTEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); HYDRA-HAMMER OR SIMILAR TYPE EQUIPMENT; MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; PPOWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER DRIVEN JUMBO FORM SETTER OPERATOR; RODMAN & CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; STEAM AND WATER PLANT OPERATOR; TOWBLADE OPERATOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $55.03 | $34.00 | NV20260002 |
| POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR-ROLLER(ALL TYPES AND SIZES), SOIL CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD- TUNNEL; ROAD OIL MIXING MACHINE OPEREATOR; FORKLIFT (UNDER (5) TONS); RUBBER TIRED, HEAVY DUTY EQUIPMENT OPERATOR; SKIPLOADER (WHEELTYPE, OVER 3-4 YARDS); SLIP FORM PUMP OPERATOR; TRACKOR OPERATOR, DRAG-TYPE SHOVEL, BULLDOZER, TAMPER, SCRAPER, AND PUSH TRACTOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR-ROLLER (ALL TYPES AND SIZES), SOIL CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD- TUNNEL; ROAD OIL MIXING MACHINE OPEREATOR; FORKLIFT (UNDER (5) TONS); RUBBER TIRED, HEAVY DUTY EQUIPMENT OPERATOR; SKIPLOADER (WHEELTYPE, OVER 3-4 YARDS); SLIP FORM PUMP OPERATOR; TRACKOR OPERATOR, DRAG-TYPE SHOVEL, BULLDOZER, TAMPER, SCRAPER, AND PUSH TRACTOR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.62 | $34.00 | NV20260002 |
| POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR- ROLLER(ALL TYPES AND SIZES), SOIL, CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD (TUNNEL); ROAD OIL MIXING MACHINE OPERATOR; FORKLIFT (UNDER FIVE TONS); RUBBER-TIRED, HEAVY DUTY EQUIPMENT OPERATOR (OSHKOSH; DW EUCLID, LETOURNEAU; LAPLANT-CHOATE, OR SIMILAR TYPE EQUIPMENT WITH ANY TYPE ATTACHMENTS); SKIDLOADER (WHEELTYPE, OVER 3/4 YDS., UP TO AND INCLUDING 1 1/2-YARDS); SLIP FORM PUMP OPERATOR (POWER-DRIVEN HYDRAPOWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR- ROLLER (ALL TYPES AND SIZES), SOIL, CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD (TUNNEL); ROAD OIL MIXING MACHINE OPERATOR; FORKLIFT (UNDER FIVE TONS); RUBBER-TIRED, HEAVY DUTY EQUIPMENT OPERATOR (OSHKOSH; DW EUCLID, LETOURNEAU; LAPLANT-CHOATE, OR SIMILAR TYPE EQUIPMENT WITH ANY TYPE ATTACHMENTS); SKIDLOADER (WHEELTYPE, OVER 3/4 YDS., UP TO AND INCLUDING 1 1/2-YARDS); SLIP FORM PUMP OPERATOR (POWER-DRIVEN HYDRAULIC LIFTING DEVICE FOR CONCRETE FORMS); TRACTOR OPERATOR (DRAG-TYPE SHOVEL, BULLDOZER, TAMPER SCRAPER AND PUSH TRACTOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $59.77 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR(PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANTEENGINEER; DANDY DIGGER; DRILLER (ROTARY AND CORE); ELEVATING GRADE OPERATOR; FORKLIFT (OVER (5) TONS); GRADE-ALL OPERATOR; HEAVY DUTY WELDER; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR (CHICAGO BOOM AND MINE); JUMBO PIPE CARRIER; KOLMAN BELT LOADER (AND SIMILAR TYPE); LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR (ATHEY, EUCLID, HANCOCK, SIERRA OR SIMILAR TYPE); MACHINIST OPERATOR; MICRO TUNNEL SYSTEMPOWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR (PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANTEENGINEER; DANDY DIGGER; DRILLER (ROTARY AND CORE); ELEVATING GRADE OPERATOR; FORKLIFT (OVER (5) TONS); GRADE-ALL OPERATOR; HEAVY DUTY WELDER; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR (CHICAGO BOOM AND MINE); JUMBO PIPE CARRIER; KOLMAN BELT LOADER (AND SIMILAR TYPE); LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR (ATHEY, EUCLID, HANCOCK, SIERRA OR SIMILAR TYPE); MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR ( HACKLEY- PRESSWELL OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMILL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL, DERRICK, DERRICK BARGE, CRANE PILEDRIVER AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER ( | $59.89 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR(PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANT ENGINEER; DANDY DIGGER; DRILLER (ROTATRY/CORE); ELEVATING GRADE OPERATOR; FORKLIFT OPERATOR (OVER 5 TIMES); GRADE-ALL OPERATOR; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR; JUMBO PIPE CARRIER; KOLMAN BELT LOADER, AND SIMILAR TYPE; LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR; MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPEPOWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR (PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANT ENGINEER; DANDY DIGGER; DRILLER (ROTATRY/CORE); ELEVATING GRADE OPERATOR; FORKLIFT OPERATOR (OVER 5 TIMES); GRADE-ALL OPERATOR; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR; JUMBO PIPE CARRIER; KOLMAN BELT LOADER, AND SIMILAR TYPE; LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR; MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMIL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, CRANE, BACKHOE, DRAGLINE, CLAMSHELL; DERRICK, DERRICK BARGE, PILE DRIVER, AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER (WHEEL TYPE OVER 1 1/2 YARDS); SURFACE HEATER AND PLANER OPERATOR; TRACTOR LOADER OPERATOR, (CRAWLER TYPE- | $57.74 | $34.00 | NV20260002 |
| POWER EQUIPMENT OPERATOR GROUP 7 HEAVY DUTY REPAIRMAN; HEAVY DUTY WELDER; LIGHT DUTY REPAIRMAN(HYBRID/ALL ELECTRIC). (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)POWER EQUIPMENT OPERATOR GROUP 7 HEAVY DUTY REPAIRMAN; HEAVY DUTY WELDER; LIGHT DUTY REPAIRMAN (HYBRID/ALL ELECTRIC). (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.99 | $34.00 | NV20260002 |
| POWER EQUIPMENT OPERATOR GROUP 8 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; EXCAVATOR OPERATOR(TRACK/RUBBER-TIRED-WITH ALL ATTACHMENTS); POWER PRODUCTION MECHANIC; STEAM/HOT WATER BOILER PLANT OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILESPOWER EQUIPMENT OPERATOR GROUP 8 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; EXCAVATOR OPERATOR (TRACK/RUBBER-TIRED-WITH ALL ATTACHMENTS); POWER PRODUCTION MECHANIC; STEAM/HOT WATER BOILER PLANT OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.39 | $34.15 | NV20260001 |
| POWER EQUIPMENT OPERATOR GROUP 8 EXCAVATOR/TRACKHOE OR SIMILAR.(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)POWER EQUIPMENT OPERATOR GROUP 8 EXCAVATOR/TRACKHOE OR SIMILAR. (ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $58.92 | $34.00 | NV20260002 |
| Refrigeration MechanicJourneyman | $43.10 | $26.54 | NV20260091 |
| REFRIGERATION MECHANIC(ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25)REFRIGERATION MECHANIC (ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | NV20260002 |
| RooferJourneyman | $40.76 | $12.42 | NV20260091 |
| ROOFER(INCLUDING WATERPROOFING) | $37.76 | $12.42 | NV20260001 |
| ROOFER(INCLUDING WATERPROOFING) | $39.74 | $12.42 | NV20260002 |
| Sheet Metal WorkerJourneyman | $59.85 | $33.51 | NV20260091 |
| SHEET METAL WORKER(ZONE PAY: NNSS $5.50; NTTR $5.50)SHEET METAL WORKER (ZONE PAY: NNSS $5.50; NTTR $5.50) | $66.73 | $30.01 | NV20260002 |
| SHEET METAL WORKER ZONE PAY ZONE 10-30 MILES $0.00; ZONE 2: 30-50 MILES $2.50; ZONE 3: 50-100 MILES $3.50; ZONE 4: OVER 100 MILES $5.00SHEET METAL WORKER ZONE PAY ZONE 1: 0-30 MILES $0.00; ZONE 2: 30-50 MILES $2.50; ZONE 3: 50-100 MILES $3.50; ZONE 4: OVER 100 MILES $5.00 | $69.73 | $30.85 | NV20260001 |
| Sprinkler FitterJourneyman | $53.77 | $31.15 | NV20260091 |
| SPRINKLER FITTER ZONE PAY ZONE ALAS VEGAS - $0.00 ZONE B: NNSS - $4.50 ZONE C: NTTR - $4.50SPRINKLER FITTER ZONE PAY ZONE A: LAS VEGAS - $0.00 ZONE B: NNSS - $4.50 ZONE C: NTTR - $4.50 | $56.69 | $28.62 | NV20260002 |
| SPRINKLER FITTER ZONE PAY ZONE ALAS VEGAS - $0.00; ZONE B: NNSS - $2.50; ZONE C: NTTR - $2.50SPRINKLER FITTER ZONE PAY ZONE A: LAS VEGAS - $0.00; ZONE B: NNSS - $2.50; ZONE C: NTTR - $2.50 | $66.22 | $20.34 | NV20260001 |
| Taper(Drywall): Painter Jounreyman | $50.62 | $25.60 | NV20260091 |
| TERRAZZO WORKER/SETTER(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)TERRAZZO WORKER/SETTER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.44 | $18.79 | NV20260002 |
| TERRAZZO WORKER/SETTER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00TERRAZZO WORKER/SETTER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $50.27 | $18.29 | NV20260001 |
| TILE FINISHER(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)TILE FINISHER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $37.07 | $14.74 | NV20260002 |
| TILE FINISHER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00TILE FINISHER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $35.64 | $14.20 | NV20260001 |
| TILE SETTER(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)TILE SETTER (ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $49.74 | $18.79 | NV20260002 |
| TILE SETTER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00TILE SETTER ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $47.70 | $18.23 | NV20260001 |
| Tile, Terrazzo, MarbleTile Setter | $52.23 | $19.21 | NV20260091 |
| Tile, Terrazzo, MarbleFinisher | $39.49 | $15.18 | NV20260091 |
| Tile, Terrazzo, MarbleTerrazzo/Marble Mason | $54.92 | $19.27 | NV20260091 |
| Traffic Barrier ErectorTraffic Barrier Erector | $38.53 | $33.59 | NV20260091 |
| Truck DriverGroup 3 (Drivers of dump trucks (16 yds up to and including 22 yds water level), drivers of trucks (legal payload cap. 20 tons but less than 25 tons), drivers of dumpster trucks, drivers of transit-mix trucks (3 yds but less than 6 yds), dumpcrete trucks (6 1/2 yds water level and over), fork lift driver, Ross Carrier driver, highway water and fuel drivers (4,001 gallon but less than 6,000 gallon), stock room clerk, tireman.) | $37.52 | $34.61 | NV20260091 |
| Truck DriverGroup 2 (Drivers of dump trucks (12 yds but less than 16 yds water level), drivers of trucks (legal payload capacity between 15 and 20 tons), drivers of transit mix trucks (under 3 yds), dumpcrete trucks (less than 6 1/2yds water level), gas and oil pipeline working truck drivers, including winch truck and all sizes of trucks, water and fuel truck drivers (2,500 gal to 4,000 gal), truck greaser, drivers of busses (on jobsite used for transportation or more than sixteen (16) passengers), warehous | $37.31 | $34.61 | NV20260091 |
| Truck DriverGroup 1 (Drivers of dump trucks (less than 12 yds. water level), drivers of trucks (legal payload capacity less than 15 tons), water and fuel truck drivers under 2,500 gal, pickup driver, service station attendant, teamster equipment (highest rate paid for dual craft operation), warehousemen, drivers of busses on site used for transportation of up to sixteen (16) passengers.) | $37.21 | $34.61 | NV20260091 |
| Truck DriverGroup 7 (Truck Repairman, Transports, Hot Oil Drivers, and Road Oil Spreader Drivers.) | $39.20 | $34.61 | NV20260091 |
| Truck DriverGroup 5 (Drivers of trucks and trailers in combination (six axles or more)) | $37.85 | $34.61 | NV20260091 |
| Truck DriverGroup 4 (Drivers of transit-mix trucks (6 yds or more), drivers of dump trucks (over 22 yds. water level), drivers of trucks (legal payload capacity 25 tons and over) drivers of fuel and water trucks (6,000 gallon and over).) | $37.70 | $34.61 | NV20260091 |
| Truck DriverGroup 6 (All Off-road Equipment, OW 10 and OW 20 Euclid-type equipment Letourneau pulls, Terra Cobras and similar types of equipment, also PB and similar type trucks when performing work within the Teamster jurisdiction, regardless of types of attachment, including power units pulling off-highway belly dumps in tandem.) | $38.20 | $34.61 | NV20260091 |
| TRUCK DRIVER,GROUP 5 UNDERGOUND DUMP TRUCK DRIVER, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER, HEAVY DUTY TRUCK REPAIR AND GARBAGE TRUCK ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILESTRUCK DRIVER, GROUP 5 UNDERGOUND DUMP TRUCK DRIVER, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER, HEAVY DUTY TRUCK REPAIR AND GARBAGE TRUCK ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $52.34 | $28.10 | NV20260001 |
| TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER, LIGHT VEHICLE DISPATCHER, TRUCK GREASER.(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER, LIGHT VEHICLE DISPATCHER, TRUCK GREASER. (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $43.69 | $28.37 | NV20260002 |
| TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER. ZONE PAY ZONE 1FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILESTRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER. ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.48 | $28.10 | NV20260001 |
| TRUCK DRIVER, GROUP 2 BOOTMAN, GREASER, LIGHT VEHICLE DISPATCHER, TIREMAN. ZONE PAY ZONE 1FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILESTRUCK DRIVER, GROUP 2 BOOTMAN, GREASER, LIGHT VEHICLE DISPATCHER, TIREMAN. ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.48 | $28.10 | NV20260001 |
| TRUCK DRIVER, GROUP 2 EQUIPMENT PARTS CLERK, FLEET OPERATIONS DISPATCHER, FORKLIFT DRIVER(UNDER 15 TONS), HEAVY DUTY DRIVER, WAREHOUSEMAN. (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)TRUCK DRIVER, GROUP 2 EQUIPMENT PARTS CLERK, FLEET OPERATIONS DISPATCHER, FORKLIFT DRIVER (UNDER 15 TONS), HEAVY DUTY DRIVER, WAREHOUSEMAN. (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $43.86 | $28.37 | NV20260002 |
| TRUCK DRIVER, GROUP 3 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER(OVER 15 TONS). (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)TRUCK DRIVER, GROUP 3 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER (OVER 15 TONS). (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.06 | $28.37 | NV20260002 |
| TRUCK DRIVER, GROUP 3 HEAVY DUTY DRIVER, FORKLIFT DRIVER, EQUIPMENT PARTS AND LIGHT DUTY REPAIRMAN. ZONE PAY ZONE 1FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILESTRUCK DRIVER, GROUP 3 HEAVY DUTY DRIVER, FORKLIFT DRIVER, EQUIPMENT PARTS AND LIGHT DUTY REPAIRMAN. ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.53 | $28.10 | NV20260001 |
| TRUCK DRIVER, GROUP 4 BOOTMAN, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)TRUCK DRIVER, GROUP 4 BOOTMAN, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.78 | $28.37 | NV20260002 |
| TRUCK DRIVER, GROUP 4 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER(OVER 15 TON) AND WAREHOUSEMAN. ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILESTRUCK DRIVER, GROUP 4 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER (OVER 15 TON) AND WAREHOUSEMAN. ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.69 | $28.10 | NV20260001 |
| TRUCK DRIVER, GROUP 5 TIREMAN(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)TRUCK DRIVER, GROUP 5 TIREMAN (ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.26 | $28.37 | NV20260002 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.