Revision 2 · modified May 26, 2026 · published May 26, 2026 · Building, Heavy, Highway
Covers 3 counties in Nevada: Clark, Lincoln, Nye. View the source document on SAM.gov.
DOL marked this determination modified May 26, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0135-001 | ASBESTOS / INSULATOR WORKER(MECHANIC) ZONE: C - NTTR $8.00 | $69.35 | $19.88 |
| BOIL0092-002 | BOILERMAKER(BLACKSMITH) | $44.31 | $28.96 |
| BRNV0013-004 | BRICKLAYER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $50.90 | $19.93 |
| CARP1977-006 | CARPENTER, LOCKSMITH ZONE PAYZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 | $55.85 | $28.28 |
| CARP1977-006 | CARPENTER, POWER SAW OPERATOR/PNEUMATIC NAILER ZONE PAYZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 | $50.77 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $28.28 |
| CARP1977-006 | CARPENTER ZONE PAYZONE 1: FREE ZONE- $0.00; ZONE 2: 40-60 MILES -$2.50; ZONE 3: OVER 60 MILES-$4.25 | $50.77 | $28.28 |
| PLAS0797-003 | CEMENT MASON ZONE PAY $4.00 | $55.79 | $21.95 |
| ELEC0357-002 | ELECTRICIAN(COMMUNICATION TECHNICIAN) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 |
| ELEC0357-002 | ELECTRICIAN(CABLE SPLICER) ZONE PAY: ZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 |
| ELEC0357-002 | ELECTRICIAN ZONE PAYZONE 1: 0-25 MILES - $0.00 ZONE 2: 26-55 MILES - $2.50 ZONE 3: OVER 55 MILES - $3.50 | $65.84 | $33.38 |
| ELEV0018-006 | ELEVATOR MECHANIC ZONE PAYZONE A - LAS VEGAS ZONE B - MERCURY $2.00 ZONE C - NTTR $2.50 FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $69.43 | $38.44 |
| IRON0118-015 | IRONWORKER ZONE PAY$4.50 | $59.46 | $35.59 |
| LABO0872-008 | LABORER GROUP 1BUILDING/OFFICE CLEANUP, FLAGPERSON; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $46.40 | $29.35 |
| LABO0872-008 | LABORER GROUP 2LABORER - GENERAL (CONSTRUCTION CLEANUP, ETC.), DEMOLITION, DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES, FENCE BUILDER, TOOL ATTENDANT (JOBSITE ONLY), GAS & OIL PIPELINE, WINDOW CLEANERS, FINE GRADER, HIGHWAY & STREET PAVING, AIRPORT RUNWAYS & SIMILAR WORK, GUINEA CHASER, LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER, PACKING ROD STEEL AND PANS; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $47.34 | $29.35 |
| LABO0872-008 | LABORER GROUP 3ASBESTOS ABATEMENT, CHUCKTENDER (EXCEPT TUNNELS), GAS & OIL PIPELINE WRAPPER-POT TENDER AND FORM MAN, OPERATOR OF CEMENT GRINDING MACHINE, ROTO-SCRAPER, SANDBLASTER (POT TENDER), SCALER, SEPTIC TANK DIGGER & INSTALLER (LEADMAN),MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS, TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHEDDERS, TANK SCALER AND CLEANER, CONCRETE SAWMAN, CONCRETE CORE CUTTER, MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELEC | $47.55 | $29.35 |
| LABO0872-008 | LABORER GROUP 4JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER, ROCK SLINGER, LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE, GAS AND OIL PIPELINE WRAPPER, CUTTING TORCH OPERATOR (DEMOLLITION); ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $47.79 | $29.35 |
| LABO0872-008 | LABORER GROUP 5DRILLER, HEAD ROCK SLINGER, SANDBLASTER (NOZZLEMAN), STEEL HEADERBOARD MAN, POWDERMAN, CRIBBER OR SHORER; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $48.05 | $29.35 |
| LABO0872-008 | LABORER GROUP 6HERBICIDE, PESTICIDE, HANTAVIRUS SUPPRESSION; ZONE PAY: $3.75 FOOT NOTE: SAVINGS ACCOUNT OF $2.29 SHOULD BE ADDED TO THE BASE RATE | $48.35 | $29.35 |
| ELEC0396-005 | LINE CONSTRUCTIONGROUNDMAN | $55.17 | $25.02 |
| ELEC0396-005 | LINE CONSTRUCTIONLINEMAN | $68.11 | $25.40 |
| ELEC0396-005 | LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR ZONE PAY - NNSS $5.00 NTTR $5.00 | $68.11 | $25.40 |
| BRNV0013-004 | MARBLE SETTER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $50.27 | $18.29 |
| CARP1607-005 | MILLWRIGHT ZONE PAY ZONE 1FREE ZONE; ZONE 2: $2.50 - 40-60 MILES; ZONE 3: $4.25 - OVER 60 MILES | $50.77 | $28.28 |
| PAIN0159-001 | PAINTER, GROUP 1BRUSH AND ROLLER ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 | $52.75 | $28.70 |
| PAIN0159-001 | PAINTER, GROUP 2SPRAY PAINTER SPECIALITY APPLICATIONS, SANDBLASTER, POT TENDER, NOZZLEMAN, TAPERS, FLUSHERS AND DETAILING, PAPER HANGER, SIGN PAINTING ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 | $52.75 | $28.70 |
| PAIN0159-001 | PAINTER, GROUP 3FLOOR COVERS, CARPET, LINOLEUM, RESILIENT TILE WORKERS, SPRAY PAINTER (STRUCTURAL STEEL, OR WHEN WORKING FROM RIGGING, SWING STAG OR BOATSWAIN CHAIR), STEEPLE-JACK AND GLAZIER. ZONE PAY ZONE 1: 0-40 MILES - $0.00; ZONE 2: 41-60 MILES - $2.50; ZONE 3: OVER 60 MILES - $4.25 | $52.75 | $28.70 |
| PLUM0525-004 | PIPEFITTER(INCLUDING CFC HVACR TECHNICIAN, INSERT GAS WELDER, BOILER TECHNICIAN) ZONE PAY: ZONE 1: $0.00 - 0-20 MILES; ZONE 2: $3.75 - 20.01-45 MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVER | $65.79 | $26.55 |
| PLAS0797-003 | PLASTERER ZONE PAY $4.00 | $55.79 | $21.95 |
| PLUM0525-004 | PLUMBER(INCLUDING LEAD BURNER) ZONE PAY: ZONE 1: $0.00 - 0-20 MILES; ZONE 2: $3.75 - 20.01-45 MILES ; ZONE 3: $7.50 - 45.01-75 MILES; ZONE 4: $11.25 - 75.01 MILES AND OVER | $65.79 | $26.55 |
| ENGI0012-010 | POWER EQUIPMENT OPERATORGROUP 7 BODY AND FENDER MECHANIC; GLOBAL POSITION SYSTEMS PARTY CHIEF; HEAVY DUTY WELDER AND REPAIRMAN; LIGHT DUTY REPAIRMAN (HYBRID/ALL ELECTRIC); PARTY CHIEF. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.14 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATORGROUP 10 CRANE OPERATOR ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $64.48 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATORGROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; ENGINEER- OILER AND SIGNALMAN; GUPIE OPERATOR (CEMENT); STEAM CLEANER/PRESSURE WASHER, SWITCHMAN OR BRAKEMAN, BLADE OPERATOR; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $55.94 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATORGROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEM ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERATOR (CONCRETE OR ASPHALT PLANT); FISHING TOOL ENGINEER; HIGHLINE CABLEWAY SIGNALMAN; HORIZONTAL DIRECTIONAL DRILLING MACHINE; INSTRUMENTMAN; LOCOMOTIVE ENGINEER; MICRO TUNNELING (ABOVE GROUND TUNNEL); MINI-EXCAVATOR; MUD PLANT OPERATOR; POWER SWEEPER OPERATOR; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR; SEEDER; TRENCHING MACHINE OPERATOR (UP TO 6FT. DEPTH); VACUUM TRUCK. | $58.67 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATORGROUP 9 RUBBER TIRED, TANDEM, MULTIPLE ENGINE, EARTH-MOVING EQUIPMENT OPERATOR; WATER TREATMENT/DISTRIBUTION OPERATOR; PLANT OPERATOR; CRANE OILER. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.89 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR(SKID TYPE); CONVEYOR OPERATOR AND BELTMAN; FIREMAN; GENERATOR, PUMP OR COMPRESSOR OPERATOR (2 TO 5 UNITS INCLUSIVE, OVER 5 UNITS; $0.10 PER HOUR FOR EACH ADDITIONAL UNIT UP TO 10 UNITS, PORTABLE UNITS); GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDE DUMP JACK; SCREENING AND CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPE); SKIPLOADER ( WHEELTYPE FORD; FERGUSON; JEEP OR SIMILAR TYPE, 3/4 YARD OR LESS (WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATI | $56.89 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE(SKID STEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); GLOBAL POSITION SYSTEMS CHAINMAN AND RODMAN; HYDRA-HAMMER (OR SIMILAR TYPE EQUIPMENT); MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; POWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER-DRIVEN JUMBO FORM SETTER; RODMAN AND CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR | $57.18 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR- ROLLER(ALL TYPES AND SIZES), SOIL, CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD (TUNNEL); ROAD OIL MIXING MACHINE OPERATOR; FORKLIFT (UNDER FIVE TONS); RUBBER-TIRED, HEAVY DUTY EQUIPMENT OPERATOR (OSHKOSH; DW EUCLID, LETOURNEAU; LAPLANT-CHOATE, OR SIMILAR TYPE EQUIPMENT WITH ANY TYPE ATTACHMENTS); SKIDLOADER (WHEELTYPE, OVER 3/4 YDS., UP TO AND INCLUDING 1 1/2-YARDS); SLIP FORM PUMP OPERATOR (POWER-DRIVEN HYDRA | $59.77 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR(PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANTEENGINEER; DANDY DIGGER; DRILLER (ROTARY AND CORE); ELEVATING GRADE OPERATOR; FORKLIFT (OVER (5) TONS); GRADE-ALL OPERATOR; HEAVY DUTY WELDER; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR (CHICAGO BOOM AND MINE); JUMBO PIPE CARRIER; KOLMAN BELT LOADER (AND SIMILAR TYPE); LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR (ATHEY, EUCLID, HANCOCK, SIERRA OR SIMILAR TYPE); MACHINIST OPERATOR; MICRO TUNNEL SYSTEM | $59.89 | $34.15 |
| ENGI0012-010 | POWER EQUIPMENT OPERATOR GROUP 8 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; EXCAVATOR OPERATOR(TRACK/RUBBER-TIRED-WITH ALL ATTACHMENTS); POWER PRODUCTION MECHANIC; STEAM/HOT WATER BOILER PLANT OPERATOR. ZONE PAY: ZONE 1 - FREE ZONE $0.00; ZONE 2 - $3.00 32.5-45 MILES; ZONE 3: $4.00 - 45-60 MILES; ZONE 4: $4.50 - OVER 60 MILES | $60.39 | $34.15 |
| ROOF0162-002 | ROOFER(INCLUDING WATERPROOFING) | $37.76 | $12.42 |
| SHEE0088-002 | SHEET METAL WORKER ZONE PAY ZONE 10-30 MILES $0.00; ZONE 2: 30-50 MILES $2.50; ZONE 3: 50-100 MILES $3.50; ZONE 4: OVER 100 MILES $5.00 | $69.73 | $30.85 |
| SFNV0669-004 | SPRINKLER FITTER ZONE PAY ZONE ALAS VEGAS - $0.00; ZONE B: NNSS - $2.50; ZONE C: NTTR - $2.50 | $66.22 | $20.34 |
| BRNV0013-004 | TERRAZZO WORKER/SETTER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $50.27 | $18.29 |
| BRNV0013-004 | TILE FINISHER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $35.64 | $14.20 |
| BRNV0013-004 | TILE SETTER ZONE PAYZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00 | $47.70 | $18.23 |
| TEAM0631-006 | TRUCK DRIVER,GROUP 5 UNDERGOUND DUMP TRUCK DRIVER, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER, HEAVY DUTY TRUCK REPAIR AND GARBAGE TRUCK ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $52.34 | $28.10 |
| TEAM0631-006 | TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER. ZONE PAY ZONE 1FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.48 | $28.10 |
| TEAM0631-006 | TRUCK DRIVER, GROUP 2 BOOTMAN, GREASER, LIGHT VEHICLE DISPATCHER, TIREMAN. ZONE PAY ZONE 1FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.48 | $28.10 |
| TEAM0631-006 | TRUCK DRIVER, GROUP 3 HEAVY DUTY DRIVER, FORKLIFT DRIVER, EQUIPMENT PARTS AND LIGHT DUTY REPAIRMAN. ZONE PAY ZONE 1FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.53 | $28.10 |
| TEAM0631-006 | TRUCK DRIVER, GROUP 4 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER(OVER 15 TON) AND WAREHOUSEMAN. ZONE PAY ZONE 1: FREE ZONE $0.00 1-20 MILES; ZONE 2: $1.50 20-40 MILES; ZONE 3: $2.50 40-60 MILES; ZONE 4: $3.50 OVER 60 MILES | $51.69 | $28.10 |