ELECTRICIAN leads the building schedule for Sanilac County, MI at $51.32 base plus $28.44 fringe. The active federal wage determination covering building construction in Sanilac County, MI lists 76 classifications with published rates, base pay from $12.84 to $51.32 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 | MI20260149 |
| BOILERMAKER | $43.50 | $37.64 | MI20260149 |
| BRICKLAYER | $38.87 | $25.18 | MI20260149 |
| CARPENTER(ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION) | $42.44 | $31.43 | MI20260149 |
Across the 76 published classifications for building work in Sanilac County, MI, base pay spans $12.84 to $51.32 per hour with a median of $34.72.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
79% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example MI20260149 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYING-CARPET | $15.38 | $2.31 | MI20260149 |
| CEMENT MASON/CONCRETE FINISHER | $19.33 | $6.80 | MI20260149 |
| ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING) | $51.32 | $28.44 | MI20260149 |
| ELECTRICIAN, LOW VOLTAGE WIRING ONLY(INSTALLER) | $30.12 | $14.57 | MI20260149 |
| ELECTRICIAN, LOW VOLTAGE WIRING ONLY(TECHNICIAN) | $37.62 | $14.80 | MI20260149 |
| FLOOR LAYERCARPET | $19.59 | $7.57 | MI20260149 |
| GLAZIER | $16.95 | $4.74 | MI20260149 |
| IRONWORKERSTRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | MI20260149 |
| IRONWORKER, REINFORCING | $36.55 | $33.37 | MI20260149 |
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | MI20260149 |
| LABORERCOMMON OR GENERAL; MASON TENDER - BRICK; PIPELAYER; AND SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $31.30 | $18.40 | MI20260149 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $16.11 | $4.51 | MI20260149 |
| LABORERLANDSCAPE & IRRIGATION | $12.84 | $0.00 | MI20260149 |
| MILLWRIGHT | $42.92 | $39.13 | MI20260149 |
| OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $38.18 | $24.85 | MI20260149 |
| OPERATORPOWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $40.83 | $24.85 | MI20260149 |
| OPERATORPOWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $36.47 | $24.85 | MI20260149 |
| OPERATORPOWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $30.61 | $24.85 | MI20260149 |
| OPERATORPOWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $26.13 | $24.85 | MI20260149 |
| OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $44.13 | $24.85 | MI20260149 |
| OPERATORGRADER/BLADE | $24.04 | $6.03 | MI20260149 |
| OPERATORROLLER | $28.02 | $7.07 | MI20260149 |
| OPERATORTRACTOR | $19.60 | $7.31 | MI20260149 |
| OPERATORBACKHOE/EXCAVATOR | $20.34 | $14.59 | MI20260149 |
| OPERATORBULLDOZER | $22.34 | $1.22 | MI20260149 |
| PAINTERDRYWALL FINISHING/TAPING | $23.79 | $12.02 | MI20260149 |
| PAINTERBRUSH, ROLLER AND SPRAY | $23.79 | $12.02 | MI20260149 |
| PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION) | $40.30 | $38.80 | MI20260149 |
| PLASTERER | $30.63 | $14.07 | MI20260149 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $16.13 | $3.67 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $40.83 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $28.86 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $26.13 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $28.86 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $42.38 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $40.83 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $36.47 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $44.13 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $42.38 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $34.72 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $40.83 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $44.13 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $38.18 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $28.86 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $36.43 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $36.47 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $39.08 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $30.61 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $26.38 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $30.61 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $26.13 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $36.47 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $34.72 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $34.72 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $26.13 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $42.38 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $39.08 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $30.61 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $26.38 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $26.38 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $44.13 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $39.08 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $36.43 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $36.43 | $24.85 | MI20260149 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $38.18 | $24.85 | MI20260149 |
| ROOFER | $15.73 | $7.41 | MI20260149 |
| SHEET METAL WORKER(EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $42.51 | $35.77 | MI20260149 |
| SHEET METAL WORKER(HVAC DUCT & SYSTEM INSTALLATION) | $42.51 | $35.77 | MI20260149 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 | MI20260149 |
| TILE SETTER | $37.88 | $22.67 | MI20260149 |
| TRUCK DRIVERFLATBED TRUCK | $16.80 | $3.97 | MI20260149 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | MI20260149 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.