OPERATOR leads the building schedule for Eaton County, MI at $47.28 base plus $25.25 fringe. The active federal wage determination covering building construction in Eaton County, MI lists 44 classifications with published rates, base pay from $10.38 to $47.28 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | MI20260082 |
| BOILERMAKER | $43.50 | $36.74 | MI20260082 |
| BRICKLAYERTERRAZZO AND TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 | MI20260082 |
| BRICKLAYERBRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR |
Across the 44 published classifications for building work in Eaton County, MI, base pay spans $10.38 to $47.28 per hour with a median of $32.37.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
70% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example MI20260082 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $36.10 |
| $26.22 |
| MI20260082 |
| BRICKLAYERTERRAZZO AND TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $20.74 | MI20260082 |
| CARPENTERINCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON) | $28.29 | $21.42 | MI20260082 |
| CARPENTERSOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON) | $28.29 | $21.42 | MI20260082 |
| CARPENTERSOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING (REMAINDER OF COUNTY) | $36.21 | $21.06 | MI20260082 |
| CARPENTERINCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION (REMAINDER OF COUNTY) | $36.21 | $21.06 | MI20260082 |
| CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 | MI20260082 |
| ELECTRICIANALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON) | $34.30 | $22.16 | MI20260082 |
| ELECTRICIANEXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON) | $34.30 | $22.16 | MI20260082 |
| ELECTRICIANALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR) | $30.43 | $10.92 | MI20260082 |
| ELECTRICIANEXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR) | $42.98 | $29.75 | MI20260082 |
| IRONWORKERREINFORCING | $36.55 | $29.51 | MI20260082 |
| IRONWORKERSTRUCTURAL (EXCLUDING METAL BUILDING ERECTION) | $36.55 | $29.51 | MI20260082 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | MI20260082 |
| LABORER(COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | $32.53 | $13.45 | MI20260082 |
| LABORERLANDSCAPE & IRRIGATION | $10.38 | $0.50 | MI20260082 |
| LABORERMASON TENDER - BRICK | $16.75 | $4.75 | MI20260082 |
| METAL BUILDING ERECTOR | $16.92 | $6.32 | MI20260082 |
| MILLWRIGHT | $42.92 | $39.13 | MI20260082 |
| OPERATORPOWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | MI20260082 |
| OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | MI20260082 |
| OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | MI20260082 |
| OPERATORPOWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | MI20260082 |
| OPERATORPOWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | MI20260082 |
| OPERATORPOWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | MI20260082 |
| OPERATORPOWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | MI20260082 |
| OPERATORBULLDOZER | $19.73 | $7.02 | MI20260082 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.94 | $8.72 | MI20260082 |
| OPERATORLOADER | $19.75 | $9.98 | MI20260082 |
| OPERATORGRADER/BLADE | $22.00 | $6.29 | MI20260082 |
| OPERATORTRACTOR | $19.10 | $8.48 | MI20260082 |
| PAINTERBRUSH, ROLLER, SPRAY AND PAPERHANGING (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET) | $28.75 | $18.68 | MI20260082 |
| PAINTERDRYWALL FINISHING/TAPING (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET) | $28.75 | $18.68 | MI20260082 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTEPAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 | MI20260082 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTEPAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 | MI20260082 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | MI20260082 |
| ROOFER | $15.00 | $0.58 | MI20260082 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 | MI20260082 |
| TRUCK DRIVERDUMP TRUCK | $16.00 | $7.26 | MI20260082 |
| TRUCK DRIVERLOWBOY TRUCK | $14.50 | $0.44 | MI20260082 |
| TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 | MI20260082 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.