Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Michigan: Eaton. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0047-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 |
| BOIL0169-001 | BOILERMAKER | $43.50 | $36.74 |
| BRMI0009-009 | BRICKLAYERTERRAZZO AND TILE SETTER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 |
| BRMI0009-009 | BRICKLAYERBRICKLAYER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $36.10 | $26.22 |
| BRMI0009-009 | BRICKLAYERTERRAZZO AND TILE FINISHER FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $32.20 |
| $20.74 |
| CARP0525-012 | CARPENTERINCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON) | $28.29 | $21.42 |
| CARP0525-016 | CARPENTERSOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON) | $28.29 | $21.42 |
| CARP1004-005 | CARPENTERSOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING (REMAINDER OF COUNTY) | $36.21 | $21.06 |
| CARP1004-020 | CARPENTERINCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION (REMAINDER OF COUNTY) | $36.21 | $21.06 |
| PLAS0016-011 | CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 |
| ELEC0445-003 | ELECTRICIANALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON) | $34.30 | $22.16 |
| ELEC0445-003 | ELECTRICIANEXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON) | $34.30 | $22.16 |
| ELEC0665-003 | ELECTRICIANALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR) | $30.43 | $10.92 |
| ELEC0665-003 | ELECTRICIANEXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR) | $42.98 | $29.75 |
| IRON0025-012 | IRONWORKERREINFORCING | $36.55 | $29.51 |
| IRON0025-012 | IRONWORKERSTRUCTURAL (EXCLUDING METAL BUILDING ERECTION) | $36.55 | $29.51 |
| SUMI2011-007 | IRONWORKER, ORNAMENTAL | $18.48 | $7.93 |
| LABO0499-013 | LABORER(COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER) | $32.53 | $13.45 |
| SUMI2011-007 | LABORERLANDSCAPE & IRRIGATION | $10.38 | $0.50 |
| SUMI2011-007 | LABORERMASON TENDER - BRICK | $16.75 | $4.75 |
| SUMI2011-007 | METAL BUILDING ERECTOR | $16.92 | $6.32 |
| CARP1102-002 | MILLWRIGHT | $42.92 | $39.13 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 |
| ENGI0324-010 | OPERATORPOWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 |
| SUMI2011-007 | OPERATORBULLDOZER | $19.73 | $7.02 |
| SUMI2011-007 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.94 | $8.72 |
| SUMI2011-007 | OPERATORLOADER | $19.75 | $9.98 |
| SUMI2011-007 | OPERATORGRADER/BLADE | $22.00 | $6.29 |
| SUMI2011-007 | OPERATORTRACTOR | $19.10 | $8.48 |
| PAIN0845-005 | PAINTERBRUSH, ROLLER, SPRAY AND PAPERHANGING (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET) | $28.75 | $18.68 |
| PAIN0845-005 | PAINTERDRYWALL FINISHING/TAPING (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET) | $28.75 | $18.68 |
| PLUM0333-006 | PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTEPAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 |
| PLUM0333-006 | PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION FOOTNOTEPAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 |
| SHEE0007-004 | POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 |
| SUMI2011-007 | ROOFER | $15.00 | $0.58 |
| SFMI0669-001 | SPRINKLER FITTER(FIRE SPRINKLERS) | $41.34 | $27.39 |
| SUMI2011-007 | TRUCK DRIVERDUMP TRUCK | $16.00 | $7.26 |
| SUMI2011-007 | TRUCK DRIVERLOWBOY TRUCK | $14.50 | $0.44 |
| SUMI2011-007 | TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 |