PIPEFITTER leads the building schedule for Barry County, MI at $47.40 base plus $23.35 fringe. The active federal wage determination covering building construction in Barry County, MI lists 55 classifications with published rates, base pay from $10.47 to $47.40 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | MI20260076 |
| BOILERMAKER | $43.50 | $36.74 | MI20260076 |
| BRICKLAYER | $21.45 | $5.00 | MI20260076 |
| CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $18.49 | $2.69 | MI20260076 |
The highest published base on this schedule belongs to PIPEFITTER at $47.40 per hour plus $23.35 fringe; the schedule's median base is $24.90.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
This schedule mixes sources: 51% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example MI20260076 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTER(FORM WORK ONLY) |
| $18.62 |
| $6.42 |
| MI20260076 |
| CARPENTER(DRYWALL HANGING ONLY) | $17.26 | $2.69 | MI20260076 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $31.50 | $21.50 | MI20260076 |
| CEMENT MASON/CONCRETE FINISHER | $17.16 | $4.25 | MI20260076 |
| DRYWALL FINISHER/TAPER | $15.91 | $2.92 | MI20260076 |
| ELECTRICIANLOW VOLTAGE WIRING (TOWNSHIPS OF THORNAPPLE & IRVING) | $25.98 | $16.81 | MI20260076 |
| ELECTRICIANLOW VOLTAGE WIRING (TOWNSHIPS OF ASSYRIA, BALTIMORE, CARLTON, CASTLETON, HASTINGS, JOHNSTOWN, MAPLE GROVE & WOODLAND) | $34.30 | $22.16 | MI20260076 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | $21.34 | $6.81 | MI20260076 |
| GLAZIER | $15.29 | $2.68 | MI20260076 |
| HVAC MECHANIC(INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $16.75 | $2.75 | MI20260076 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | MI20260076 |
| IRONWORKER, REINFORCING | $36.55 | $29.51 | MI20260076 |
| IRONWORKER, STRUCTURAL | $18.13 | $4.88 | MI20260076 |
| LABORERGRADE CHECKER; SANDBLASTER | $24.90 | $12.95 | MI20260076 |
| LABORERMASON TENDER - BRICK | $18.87 | $2.16 | MI20260076 |
| LABORERCOMMON OR GENERAL | $17.64 | $5.89 | MI20260076 |
| LABORERPIPELAYER | $18.32 | $3.28 | MI20260076 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $14.01 | $2.45 | MI20260076 |
| LABORERLANDSCAPE & IRRIGATION | $10.47 | $0.00 | MI20260076 |
| MILLWRIGHT | $40.04 | $26.47 | MI20260076 |
| OPERATORPOWER EQUIPMENT: GROUP 2 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | MI20260076 |
| OPERATORPOWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; ROLLER; SCRAPER; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | MI20260076 |
| OPERATORPOWER EQUIPMENT: GROUP 5 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | MI20260076 |
| OPERATORPOWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | MI20260076 |
| OPERATORPOWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | MI20260076 |
| OPERATORTRACTOR | $15.72 | $1.92 | MI20260076 |
| OPERATORBOBCAT/SKID STEER/SKID LOADER | $16.50 | $6.17 | MI20260076 |
| OPERATORBULLDOZER | $18.50 | $5.81 | MI20260076 |
| OPERATORCRANE | $19.28 | $7.55 | MI20260076 |
| OPERATORLOADER | $17.16 | $4.05 | MI20260076 |
| PAINTERSPRAY | $27.32 | $16.66 | MI20260076 |
| PAINTERBRUSH ONLY | $27.32 | $16.66 | MI20260076 |
| PAINTERROLLER | $16.21 | $2.81 | MI20260076 |
| PIPEFITTERINCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIPS OF CARLTON, IRVING, THORNAPPLE & WOODLAND) | $47.40 | $23.35 | MI20260076 |
| PIPEFITTERINCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.29 | $25.43 | MI20260076 |
| PIPEFITTERINCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE, PRAIRIEVILLE, RUTLAND & YANKEE SPRINGS) | $32.50 | $24.97 | MI20260076 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION(TOWNSHIPS OF CARLTON, IRVING, THORNAPPLE & WOODLAND) | $47.40 | $23.35 | MI20260076 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION(TOWNSHIPS OF ASSYRIA, BALTIMORE, CASTLETON, HASTINGS, JOHNSTOWN & MAPLE GROVE) | $46.29 | $25.43 | MI20260076 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION(TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE, PRAIRIEVILLE, RUTLAND & YANKEE SPRINGS) | $32.50 | $24.97 | MI20260076 |
| ROOFER | $13.86 | $6.11 | MI20260076 |
| SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $22.28 | $7.95 | MI20260076 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $42.74 | $21.53 | MI20260076 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $17.88 | $4.73 | MI20260076 |
| TILE FINISHER(TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE & PRAIRIEVILLE) | $27.94 | $21.15 | MI20260076 |
| TILE FINISHER(TOWNSHIPS OF ASSYRIA, BALTIMORE, JOHNSTOWN & MAPLE GROVE) | $27.94 | $21.15 | MI20260076 |
| TILE FINISHER(TOWNSHIPS OF CARLTON, CASTLETON, HASTINGS, IRVING, RUTLAND, THORNAPPLE, WOODLAND & YANKEE SPRINGS) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $27.94 | $21.15 | MI20260076 |
| TILE SETTER(TOWNSHIPS OF BARRY, HOPE, ORANGEVILLE & PRAIRIEVILLE) | $32.20 | $23.46 | MI20260076 |
| TILE SETTER(TOWNSHIPS OF ASSYRIA, BALTIMORE, JOHNSTOWN & MAPLE GROVE) | $32.20 | $23.46 | MI20260076 |
| TILE SETTER(TOWNSHIPS OF CARLTON, CASTLETON, HASTINGS, IRVING, RUTLAND, THORNAPPLE, WOODLAND & YANKEE SPRINGS) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $32.20 | $23.46 | MI20260076 |
| TRUCK DRIVERTRACTOR HAUL TRUCK | $13.57 | $1.18 | MI20260076 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $17.00 | $5.71 | MI20260076 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.