ELECTRICIAN leads the heavy schedule for Bingham County, ID at $40.00 base plus $18.74 fringe. The active federal wage determination covering heavy construction in Bingham County, ID lists 24 classifications with published rates, base pay from $17.00 to $40.00 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| CARPENTEREXCLUDES FORM WORK (ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES) ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWCARPENTER: EXCLUDES FORM WORK (ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES) ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $35.68 | $18.24 |
The highest published base on this schedule belongs to ELECTRICIAN at $40.00 per hour plus $18.74 fringe; the schedule's median base is $24.74.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
This schedule mixes sources: 33% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example ID20260038 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTER(FORM WORK ONLY) | $25.27 | $9.10 | ID20260038 |
| CEMENT MASON/CONCRETE FINISHER | $18.02 | $0.00 | ID20260038 |
| ELECTRICIAN | $40.00 | $18.74 | ID20260038 |
| IRONWORKER, REINFORCING | $27.22 | $16.70 | ID20260038 |
| IRONWORKER, STRUCTURAL | $33.37 | $22.98 | ID20260038 |
| LABORERGROUP 1 FLAGGER | $33.63 | $16.50 | ID20260038 |
| LABORERGROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 | ID20260038 |
| LABORERPIPELAYER | $18.23 | $3.77 | ID20260038 |
| LABORERCOMMON OR GENERAL | $20.43 | $10.90 | ID20260038 |
| OPERATORFORKLIFT | $17.00 | $0.00 | ID20260038 |
| OPERATORGRADER/BLADE | $24.91 | $8.79 | ID20260038 |
| OPERATORLOADER (FRONT END) | $21.33 | $6.11 | ID20260038 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.79 | $5.80 | ID20260038 |
| OPERATORBOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 | ID20260038 |
| OPERATORCONCRETE BATCH PLANT | $24.94 | $11.96 | ID20260038 |
| OPERATORCRANE | $24.30 | $8.38 | ID20260038 |
| POWER EQUIPMENT OPERATORGROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALEPOWER EQUIPMENT OPERATOR: GROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $37.35 | $16.10 | ID20260038 |
| POWER EQUIPMENT OPERATORGROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAYPOWER EQUIPMENT OPERATOR: GROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 | ID20260038 |
| POWER EQUIPMENT OPERATORGROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALEPOWER EQUIPMENT OPERATOR: GROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 | ID20260038 |
| TRUCK DRIVERDUMP TRUCK | $17.53 | $0.00 | ID20260038 |
| TRUCK DRIVERLOWBOY TRUCK | $21.00 | $12.10 | ID20260038 |
| TRUCK DRIVERWATER TRUCK | $24.57 | $11.22 | ID20260038 |
| WATER & SEWER LINESOPERATOR - EXCAVATOR | $22.07 | $0.00 | ID20260038 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.