Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Idaho: Bingham. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0808-009 | CARPENTEREXCLUDES FORM WORK (ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES) ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOW | $35.68 | $18.24 |
| SUID2010-031 | CARPENTER(FORM WORK ONLY) | $25.27 | $9.10 |
| SUID2010-031 | CEMENT MASON/CONCRETE FINISHER | $18.02 | $0.00 |
| ELEC0449-004 | ELECTRICIAN | $40.00 | $18.74 |
| SUID2010-031 | IRONWORKER, REINFORCING | $27.22 | $16.70 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRON0732-003 | IRONWORKER, STRUCTURAL | $33.37 | $22.98 |
| LABO0155-008 | LABORERGROUP 1 FLAGGER | $33.63 | $16.50 |
| LABO0155-008 | LABORERGROUP 3 ASPHALT INCLUDING RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $33.83 | $16.50 |
| SUID2010-031 | LABORERPIPELAYER | $18.23 | $3.77 |
| SUID2010-031 | LABORERCOMMON OR GENERAL | $20.43 | $10.90 |
| SUID2010-031 | OPERATORFORKLIFT | $17.00 | $0.00 |
| SUID2010-031 | OPERATORGRADER/BLADE | $24.91 | $8.79 |
| SUID2010-031 | OPERATORLOADER (FRONT END) | $21.33 | $6.11 |
| SUID2010-031 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.79 | $5.80 |
| SUID2010-031 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $21.05 | $0.00 |
| SUID2010-031 | OPERATORCONCRETE BATCH PLANT | $24.94 | $11.96 |
| SUID2010-031 | OPERATORCRANE | $24.30 | $8.38 |
| ENGI0370-029 | POWER EQUIPMENT OPERATORGROUP 7 CRANE (OVER 50 TONS), TOWER CRANE ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $37.35 | $16.10 |
| ENGI0370-029 | POWER EQUIPMENT OPERATORGROUP 3 FORKLIFT ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 |
| ENGI0370-029 | POWER EQUIPMENT OPERATORGROUP 6 CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 |
| SUID2010-031 | TRUCK DRIVERDUMP TRUCK | $17.53 | $0.00 |
| SUID2010-031 | TRUCK DRIVERLOWBOY TRUCK | $21.00 | $12.10 |
| SUID2010-031 | TRUCK DRIVERWATER TRUCK | $24.57 | $11.22 |
| SUID2010-031 | WATER & SEWER LINESOPERATOR - EXCAVATOR | $22.07 | $0.00 |