Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in West Virginia: Pleasants. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0002-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 |
| BOIL0667-005 | BOILERMAKER | $47.13 | $28.93 |
| BRWV0006-002 | BRICKLAYER | $30.50 | $22.17 |
| CARP0436-006 | CARPENTER(INCLUDING DRYWALL HANGING, FORM WORK AND FLOOR LAYING-HARDWOOD AND VINYL) | $33.05 | $26.50 |
| ELEC0968-008 | ELECTRICIAN | $39.01 | $30.75 |
| PAIN1195-002 | GLAZIER | $32.89 | $13.38 |
| IRON0549-006 | IRONWORKER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $35.19 |
| $25.66 |
| IRON0787-006 | IRONWORKERREINFORCING | $36.10 | $24.65 |
| SUWV2012-043 | IRONWORKER, STRUCTURAL | $25.72 | $16.50 |
| LABO0379-019 | LABORER(WACKER ROLLER OPERATOR) | $28.02 | $16.80 |
| LABO1085-005 | LABORERAIRTOOL OPERATOR, BOBCAT OPERATOR (CLEAN UP/DEMOLITION), CARPENTER TENDER, CHIPPING GUNS, COMMON OR GENERAL, CONCRETE SAW (HAND HELD/WALK BEHIND), CONCRETE WORKER, DEMOLITION, FENCE ERECTION, FLAGGER, GRADE CHECKER, JACK HAMMER, LANDSCAPE, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, POWER TOOL OPERATOR, SCAFFOLD BUILDER (BRICK AND MASONRY), SIGNAL MAN, SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WATER BOY | $23.76 | $16.95 |
| BRWV0009-008 | MASON - STONE | $31.65 | $25.56 |
| CARP0443-009 | MILLWRIGHT | $37.40 | $26.06 |
| PAIN0970-009 | PAINTER(BRUSH, ROLLER AND SPRAY) | $30.57 | $20.06 |
| PAIN1144-005 | PAINTERDRYWALL FINISHING/TAPING | $31.48 | $17.73 |
| PLUM0565-002 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $41.00 | $37.63 |
| PLUM0565-004 | PLUMBER | $41.00 | $37.63 |
| ENGI0132-011 | POWER EQUIPMENT OPERATORGROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE, MECHANICS WITH TOOLS WITH 3/4 INCH DRIVE AND BELOW | $46.56 | $22.05 |
| ENGI0132-011 | POWER EQUIPMENT OPERATORGROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 |
| ENGI0132-011 | POWER EQUIPMENT OPERATORGROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 |
| ENGI0132-011 | POWER EQUIPMENT OPERATORGROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 |
| ROOF0034-003 | ROOFER | $29.75 | $16.71 |
| SHEE0024-022 | SHEET METAL WORKER(INCLUDES HVAC DUCT INSTALLATION) | $33.53 | $26.71 |
| BRWV0015-014 | TILE FINISHER | $27.00 | $22.57 |
| BRWV0009-007 | TILE SETTER | $31.65 | $25.56 |
| TEAM0175-005 | TRUCK DRIVERGROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 |
| TEAM0175-005 | TRUCK DRIVERGROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 |