Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in West Virginia: Jefferson. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0024-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR PAID HOLIDAYSNEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 |
| BOIL0667-005 | BOILERMAKER | $47.13 | $28.93 |
| BRWV0015-007 | BRICKLAYER | $31.53 | $25.47 |
| CARP0423-004 | CARPENTER(INCLUDING DRYWALL FINISHING/TAPING, DRYWALL HANGING AND FORM WORK) | $29.40 | $20.25 |
| ELEC0307-012 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) | $42.20 | $20.39 |
| ELEV0010-003 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEVATOR MECHANIC A. PAID HOLIDAYSNEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT |
| $57.16 |
| $38.44 |
| ASBE0024-015 | FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUNDPENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERA | $30.21 | $10.43 |
| SUWV2012-035 | GLAZIER | $23.20 | $4.02 |
| IRON0549-007 | IRONWORKERORNAMENTAL AND REINFORCING | $35.19 | $25.66 |
| IRON0568-011 | IRONWORKER(SHEETING AND STRUCTURAL) | $31.65 | $24.50 |
| LABO0379-010 | LABORERGROUP 1 CARPENTER TENDER, DEMOLITION | $24.94 | $16.20 |
| LABO0379-010 | LABORERGROUP 2 CONCRETE SAW (HAND HELD/WALK BEHIND), MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR | $24.94 | $16.20 |
| LABO0379-010 | LABORERGROUP 3 PIPELAYER | $24.94 | $16.20 |
| SUWV2012-035 | LABORERCOMMON OR GENERAL | $17.95 | $3.30 |
| BRWV0015-011 | MASON - STONE | $28.90 | $23.91 |
| CARP0443-009 | MILLWRIGHT | $37.40 | $26.06 |
| SUWV2012-035 | OPERATORBACKHOE | $21.51 | $7.36 |
| SUWV2012-035 | OPERATOREXCAVATOR | $23.27 | $11.95 |
| SUWV2012-035 | PAINTERBRUSH, ROLLER AND SPRAY | $22.33 | $9.95 |
| SUWV2012-035 | PIPEFITTER | $25.76 | $19.46 |
| PLUM0486-009 | PLUMBER | $40.20 | $22.00 |
| ENGI0132-009 | POWER EQUIPMENT OPERATORGROUP 3 BULLDOZER, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 |
| ENGI0132-009 | POWER EQUIPMENT OPERATORGROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 |
| ENGI0132-009 | POWER EQUIPMENT OPERATORGROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE, MECHANICS WITH TOOLS WITH 3/4 INCH DRIVE AND BELOW | $46.56 | $22.05 |
| ENGI0132-009 | POWER EQUIPMENT OPERATORGROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 |
| ROOF0034-003 | ROOFER | $29.75 | $16.71 |
| SHEE0100-006 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION(0-40 MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $27.73 | $24.03 |
| SHEE0100-006 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION(66+ MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $30.73 | $24.03 |
| SHEE0100-006 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION(41-65 MILES FROM CITY HALL, CUMBERLAND, MARYLAND) | $30.23 | $24.03 |
| SUWV2012-035 | SPRINKLER FITTER(FIRE SPRINKLERS) | $30.96 | $15.81 |
| BRWV0015-014 | TILE FINISHER | $27.00 | $22.57 |
| BRWV0009-007 | TILE SETTER | $31.65 | $25.56 |
| TEAM0175-005 | TRUCK DRIVERGROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 |
| TEAM0175-005 | TRUCK DRIVERGROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 |