Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in West Virginia: Upshur. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0080-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 |
| BOIL0667-005 | BOILERMAKER | $47.13 | $28.93 |
| SUWV2012-028 | BRICKLAYER | $27.50 | $12.35 |
| BRWV0009-001 | BRICK POINTER/CAULKER/CLEANER | $31.65 | $25.56 |
| CARP0476-008 | CARPENTER(ALL OTHER WORK, EXCLUDING DRYWALL HANGING) | $29.74 | $23.51 |
| CARP1024-001 | CARPENTER(SCAFFOLD BUILDER ONLY) | $30.00 | $21.15 |
| CARP1911-004 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARPENTER(FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL ONLY) |
| $30.00 |
| $21.15 |
| SUWV2012-028 | CARPENTER(DRYWALL HANGING ONLY) | $25.08 | $12.58 |
| SUWV2012-028 | ELECTRICIAN | $28.16 | $15.11 |
| PAIN1195-002 | GLAZIER | $32.89 | $13.38 |
| IRON0549-006 | IRONWORKERORNAMENTAL | $35.19 | $25.66 |
| IRON0787-006 | IRONWORKERREINFORCING | $36.10 | $24.65 |
| SUWV2012-028 | IRONWORKER, STRUCTURAL | $26.01 | $12.18 |
| LABO0379-019 | LABORER(WACKER ROLLER OPERATOR) | $28.02 | $16.80 |
| LABO0453-003 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $22.76 | $16.75 |
| LABO0543-003 | LABORERASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 |
| LABO0984-002 | LABORERGROUP 2 AIRTOOL OPERATOR, ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, AND CEILING), BOBCAT OPERATOR (CLEAN UP/DEMOLITION), DEWATERING, RODMAN, SKYTRAK FORKLIFT OPERATOR | $24.13 | $16.05 |
| LABO0984-002 | LABORERGROUP 1 COMMON OR GENERAL | $24.13 | $16.05 |
| SUWV2012-028 | LABORERMASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 |
| SUWV2012-028 | LABORERDEMOLITION | $20.58 | $9.47 |
| SUWV2012-028 | LABORERMASON TENDER - BRICK | $21.47 | $8.29 |
| CARP0443-009 | MILLWRIGHT | $37.40 | $26.06 |
| SUWV2012-028 | OPERATORBULLDOZER | $30.24 | $10.26 |
| SUWV2012-028 | OPERATORFORKLIFT | $33.09 | $3.00 |
| SUWV2012-028 | OPERATOREXCAVATOR | $30.31 | $10.81 |
| PAIN0970-007 | PAINTERDRYWALL FINISHING/TAPING | $30.57 | $20.06 |
| SUWV2012-028 | PAINTERBRUSH, ROLLER AND SPRAY | $22.03 | $9.95 |
| SUWV2012-028 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 |
| ENGI0132-007 | POWER EQUIPMENT OPERATORGROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 |
| ENGI0132-007 | POWER EQUIPMENT OPERATORGROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 |
| ENGI0132-007 | POWER EQUIPMENT OPERATORGROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | $46.56 | $22.05 |
| ENGI0132-007 | POWER EQUIPMENT OPERATORGROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 |
| SUWV2012-028 | ROOFER | $24.28 | $9.32 |
| SUWV2012-028 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $25.61 | $15.68 |
| SUWV2012-028 | TRUCK DRIVERSINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 |