Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in West Virginia: Tyler. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0002-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 |
| BOIL0667-005 | BOILERMAKER | $47.13 | $28.93 |
| BRWV0015-008 | BRICKLAYER(BRICKLAYER & BRICK POINTER/CAULKER/CLEANER) | $31.70 | $25.93 |
| CARP0436-001 | CARPENTER(INCLUDING DRYWALL HANGING AND FORM WORK) | $33.05 | $26.50 |
| ELEC0968-008 | ELECTRICIAN | $39.01 | $30.75 |
| PAIN1195-002 | GLAZIER | $32.89 | $13.38 |
| IRON0549-008 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRONWORKER(ORNAMENTAL, REINFORCING, AND STRUCTURAL) |
| $35.19 |
| $25.66 |
| LABO0379-007 | LABORER(MASON TENDER - CEMENT/CONCRETE) | $24.13 | $16.20 |
| LABO0984-009 | LABORERGROUP 1 CARPENTER TENDER, COMMON OR GENERAL, WATER BOY | $24.13 | $15.05 |
| LABO0984-009 | LABORERGROUP 2 CONCRETE WORKER, DEWATERING, GRADE CHECKER, MASON TENDER-BRICK, MORTAR MIXER, RIGGING AND SIGNALING, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR | $24.13 | $16.05 |
| LABO1149-004 | LABORERASPHALT RAKER | $25.92 | $16.88 |
| BRWV0015-010 | MASON - STONE | $33.00 | $26.18 |
| CARP0443-009 | MILLWRIGHT | $37.40 | $26.06 |
| SUWV2012-027 | OPERATORFORKLIFT | $33.09 | $3.00 |
| PAIN0091-012 | PAINTER(BRUSH, ROLLER AND SPRAY) | $29.47 | $18.72 |
| PLUM0152-009 | PLUMBER | $34.05 | $41.05 |
| ENGI0132-006 | POWER EQUIPMENT OPERATORGROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 |
| ENGI0132-006 | POWER EQUIPMENT OPERATORGROUP 3 BACKHOE, EXCAVATOR, BULLDOZER, ALL OTHER CRANES | $45.21 | $22.05 |
| ENGI0132-006 | POWER EQUIPMENT OPERATORGROUP 4 BOBCAT/SKID STEER/SKID LOADER, OILER | $34.71 | $22.05 |
| ENGI0132-006 | POWER EQUIPMENT OPERATORGROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | $46.56 | $22.05 |
| SUWV2012-027 | ROOFER | $24.28 | $9.32 |
| SHEE0033-003 | SHEET METAL WORKER(INCLUDES HVAC DUCT INSTALLATION) | $34.92 | $29.70 |
| SFWV0669-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $43.26 | $28.90 |
| SUWV2012-027 | TRUCK DRIVERSINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 |