Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Wisconsin: Waukesha. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0231-003 | CARPENTER | $45.46 | $31.52 |
| SUWI2012-015 | CEMENT MASON/CONCRETE FINISHER | $23.64 | $6.42 |
| ELEC0494-004 | ELECTRICIAN | $33.00 | $14.97 |
| LABO0113-007 | LABORERMASON TENDER - BRICK | $21.65 | $18.73 |
| SUWI2012-015 | LABORERCOMMON OR GENERAL | $18.52 | $7.86 |
| ENGI0139-009 | OPERATORPOWER EQUIPMENT (BACKHOE/EXCAVATOR (UNDER 130,000 LBS.), BULLDOZER; ROLLER) | $44.92 | $27.35 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ENGI0139-009 |
| OPERATORPOWER EQUIPMENT (BACKHOE/EXCAVATOR (130,000 LBS. AND OVER)) |
| $45.67 |
| $27.35 |
| SUWI2012-015 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 |
| SUWI2012-015 | OPERATORLOADER | $25.70 | $9.58 |
| PLUM0075-011 | PLUMBER | $60.05 | $27.90 |
| ROOF0065-001 | ROOFER | $41.50 | $25.54 |
| SUWI2012-015 | SHEET METAL WORKER(HVAC UNIT INSTALLATION) | $24.83 | $0.00 |
| SHEE0018-026 | SHEET METAL WORKER, INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION((2) FOUR STORIES) | $37.14 | $29.98 |
| SHEE0018-026 | SHEET METAL WORKER, INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION((1) THREE STORIES & UNDER) | $37.14 | $29.98 |