Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Wisconsin: Racine. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0231-003 | CARPENTER | $45.46 | $31.52 |
| SUWI2012-012 | CEMENT MASON/CONCRETE FINISHER | $23.64 | $6.42 |
| ELEC0430-003 | ELECTRICIAN | $33.87 | $18.32 |
| ELEC0890-007 | ELECTRICIAN(THAT PORTION OF BURLINGTON TOWNSHIP FROM THE FOX RIVER TO THE WEST BOUNDARY OF BURLINGTON TOWNSHIP AND FROM 1 1/2 MILES SOUTH OF THE NORTH BOUNDARY OF BURLINGTON TOWNSHIP TO 3 1/2 MILES NORTH OF THE SOUTH BOUNDARY OF BURLINGTON TOWNSHIP.) | $28.65 | $14.54 |
| LABO0113-007 | LABORERMASON TENDER - BRICK | $21.65 | $18.73 |
| SUWI2012-012 | LABORERCOMMON OR GENERAL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $18.64 |
| $9.33 |
| ENGI0139-009 | OPERATORPOWER EQUIPMENT (BACKHOE/EXCAVATOR (UNDER 130,000 LBS.), BULLDOZER; ROLLER) | $44.92 | $27.35 |
| ENGI0139-009 | OPERATORPOWER EQUIPMENT (BACKHOE/EXCAVATOR (130,000 LBS. AND OVER)) | $45.67 | $27.35 |
| SUWI2012-012 | OPERATORLOADER | $25.70 | $9.58 |
| SUWI2012-012 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 |
| PLUM0118-004 | PLUMBER | $57.35 | $29.37 |
| ROOF0065-002 | ROOFER | $41.50 | $25.54 |
| SHEE0018-038 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $41.58 | $38.21 |