Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Wisconsin: Chippewa. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP1074-003 | CARPENTER | $30.21 | $22.26 |
| SUWI2012-009 | CEMENT MASON/CONCRETE FINISHER | $24.37 | $7.29 |
| ELEC0014-003 | ELECTRICIAN | $44.29 | $25.21 |
| LABO0268-003 | LABORERCOMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 |
| ENGI0139-006 | OPERATORPOWER EQUIPMENT (BACKHOE/EXCAVATOR 130,000 LBS. AND OVER) | $45.67 | $27.35 |
| ENGI0139-006 | OPERATORPOWER EQUIPMENT (BULLDOZER UNDER 40 H.P.; ROLLER 5 TONS AND UNDER; RUBBER TIRE ROLLER) | $44.62 | $27.35 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ENGI0139-006 | OPERATORPOWER EQUIPMENT (BACKHOE/EXCAVATOR UNDER 130,000 LBS.) | $44.92 | $27.35 |
| ENGI0139-006 | OPERATORPOWER EQUIPMENT (BULLDOZER OVER 40 H.P.; ROLLER OVER 5 TONS) | $45.67 | $27.35 |
| SUWI2012-009 | OPERATORLOADER | $25.70 | $9.58 |
| SUWI2012-009 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 |
| PLUM0434-003 | PLUMBER | $41.29 | $25.98 |
| ROOF0096-008 | ROOFER | $33.73 | $16.34 |
| SHEE0018-019 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $36.50 | $30.29 |