Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Wisconsin: Marathon. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| LABO0330-004 | ASBESTOS ABATEMENT/HAZARDOUS WASTE(PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS). NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | $36.65 | $19.97 |
| ASBE0127-001 | ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $45.24 | $30.56 |
| SUWI2002-003 | ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 |
| BOIL0107-001 | BOILERMAKER(BOILERMAKER) | $46.52 | $34.63 |
| BRWI0006-003 | BRICKLAYER(BRICKLAYER, CEMENT MASON, TILE LAYER) | $39.36 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $28.83 |
| CARP0310-006 | CARPENTER(INCLUDING ACOUSTICAL WORK, DRYWALL HANGING & PILEDRIVERMAN; EXCLUDING BATT INSULATION) | $41.43 | $29.99 |
| ELEC0388-001 | ELECTRICIAN | $40.19 | $22.90 |
| ELEV0132-001 | ELEVATOR MECHANIC. FOOTNOTEA. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE AS VACATION PAY FOR EMPLOYEES WITH MORE THAN 5 YEARS OR MORE OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $65.17 | $38.44 |
| PAIN1204-001 | GLAZIER | $42.41 | $20.06 |
| IRON0383-002 | IRONWORKER | $44.00 | $32.66 |
| LABO0330-004 | LABORER, GENERAL. NOTEMASON TENDER $1.00 OVER GENERAL LABORER | $37.05 | $19.97 |
| SUWI2002-003 | LABORERSLANDSCAPE | $8.73 | $4.90 |
| SUWI2002-003 | LABORERSCONCRETE WORKER | $16.34 | $3.59 |
| CARP1056-001 | MILLWRIGHT | $42.00 | $28.85 |
| PAIN0802-005 | PAINTERS(BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING) | $37.65 | $21.17 |
| PLUM0434-001 | PLUMBER/PIPEFITTER(INCLUDING HVAC WORK) | $50.94 | $25.98 |
| ENGI0139-002 | POWER EQUIPMENT OPERATORGROUP 3 BACKHOES (EXCAVATORS) WEIGHING UNDER 130,000 LBS; TRAVELLING CRANE (BRIDGE TYPE); MILLING MACHINE; CONCRETE PAVER OVER 27 E; CONCRETE SPREADER AND DISTRIBUTOR; CONCRETE LASER SCREED; CONCRETE GRINDER AND PLANING MACHINE; SLIPFORM CURB AND GUTTER MACHINE; BORING MACHINE (DIRECTIONAL); DREDGE OPERATOR; SKID RIGS; OVER 46 METER CONCRETE PUMP. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER | $45.73 | $27.89 |
| ENGI0139-002 | POWER EQUIPMENT OPERATORGROUP 4 HYDRAULIC BACKHOE (TRACTOR OR TRUCK MOUNTED); HYDRAULIC CRANE, 10 TONS OR LESS; TRACTOR, BULLDOZER, OR END LOADER (OVER 40 HP); MOTOR PATROL; SCRAPER OPERATOR; BITUMINOUS PLANT AND PAVER OPERATOR; SCREED-MILLING MACHINE; ROLLER OVER 5 TONS; CONCRETE PUMPS 46 METER & UNDER; GROUT PUMPS; ROTEC TYPE MACHINE; HYDRO BLASTER, 10,000 PSI AND OVER; ROTARY DRILL OPERATOR; PERCUSSION DRILLING MACHINE; AIR TRACK DRILL WITH OR WITHOUT INTEGRAL HAMMER; BLASTER; BORING MACHINE (VERTICAL OR HORIZONTAL) | $45.20 | $27.89 |
| ENGI0139-002 | POWER EQUIPMENT OPERATORGROUP 5 TRACTOR, BULLDOZER, OR ENDLOADER (UNDER 40 HP); TAMPERS -COMPACTORS, RIDING TYPE; STUMP CHIPPER, LARGE; ROLLER, RUBBER TIRE; BACKFILLER; TRENCHER, CHAIN TYPE (BUCKET UNDER 8 INCH); CONCRETE AUTO BREAKER, LARGE; CONCRETE FINISHING MACHINE (ROAD TYPE); CONCRETE BATCH HOPPER; CONCRETE CONVEYOR SYSTEMS; CONCRETE MIXERS, 14S OR OVER; PUMPS, SCREW TYPE AND GYPSUM); HYDROHAMMERS, SMALL; BROOMS AND SWEEEPRS; LIFT SLAB MACHINE; ROLLER UNDER 5 TONS; INDUSTRIAL LOCOMOTIVES; FIREMAN (PILE DRIVERS AN | $43.13 | $27.89 |
| ENGI0139-002 | POWER EQUIPMENT OPERATORGROUP 6 SHOULDERING MACHINE OPERATOR; FARM OR INDUSTRIAL TRACTOR MOUNTED EQUIPMENT; POST HOLE DIGGER; AUGER (VERTICAL AND HORIZONTAL); SKID STEER LOADER WITH OR WITHOUT ATTACHMENTS; ROBOTIC TOOL CARRIER WITH OR WITHOUT ATTACHMENTS; POWER PACK VIBRATORY/ULTRA SOUND DRIVER AND EXTRACTOR; FIREMAN (ASPHALT PLANTS); SCREED OPERATOR; STONE CRUSHERS AND SCREENING PLANTS; AIR, ELECTRIC, HYDRAULIC JACKS (SLIP FORM); PRESTRESS MACHINES; AIR COMPRESSOR, 400 CFM OR OVER; REFRIGERATION PLANT/FREESE MACHINE; | $41.60 | $27.89 |
| ENGI0139-002 | POWER EQUIPMENT OPERATORGROUP 2 BACKHOES (EXCAVATORS) WEIGHING 130,000 LBS & OVER; CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF 100 TONS OR LESS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS 175 FT OR LESS; CAISSON RIGS; PILE DRIVER HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $49.28 | $27.89 |
| ENGI0139-002 | POWER EQUIPMENT OPERATORGROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $50.53 | $27.89 |
| SUWI2002-003 | ROOFER | $18.01 | $3.28 |
| SHEE0018-035 | SHEET METAL WORKER(INCLUDING HVAC WORK) | $42.90 | $32.47 |
| CARP0310-006 | SOFT FLOOR LAYER | $41.43 | $29.99 |
| SFWI0669-002 | SPRINKLER FITTER | $51.68 | $29.73 |
| SUWI2002-003 | TILE & MARBLE FINISHER | $13.89 | $8.20 |
| TEAM0662-001 | TRUCK DRIVER(1 & 2 AXLES) | $39.57 | $28.70 |
| TEAM0662-001 | TRUCK DRIVER(3 OR MORE AXLES) | $39.72 | $28.70 |