Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 2 counties in Washington: Clark, Skamania. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRWA0001-020 | BRICKLAYER | $49.60 | $25.18 |
| CARP0503-004 | CARPENTER, EXCLUDES FORM WORK | $54.69 | $16.81 |
| PLAS0555-008 | CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 |
| CARP0503-004 | DRYWALL HANGER | $54.49 | $17.01 |
| ELEC0048-030 | ELECTRICIAN | $63.50 | $29.73 |
| SUWA2018-020 | FORM WORKER | $29.71 | $14.84 |
| ASBE0036-006 | HEAT & FROST INSULATOR(INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $62.02 |
| $22.36 |
| IRON0029-014 | IRONWORKER | $48.31 | $34.52 |
| LABO0242-015 | LABORERFORM STRIPPING | $50.38 | $16.96 |
| LABO0242-018 | LABORERJACKHAMMER | $51.52 | $16.99 |
| LABO0242-020 | LABORERNOZZLE PERSON | $52.31 | $17.01 |
| LABO0335-007 | LABORERFIRE WATCH | $40.56 | $15.60 |
| LABO0335-012 | LABORERHOD CARRIER | $48.14 | $15.60 |
| LABO0335-020 | LABORERMASON TENDER - CEMENT/CONCRETE | $44.90 | $15.60 |
| SUWA2018-020 | LABORERLANDSCAPE | $18.25 | $0.00 |
| SUWA2018-020 | LABORERPIPELAYER | $32.17 | $11.49 |
| SUWA2018-020 | LABORERGRADE CHECKER | $31.86 | $12.98 |
| SUWA2018-020 | LABORERCONCRETE SAW CHAIN | $35.03 | $10.86 |
| SUWA2018-020 | LABORERCOMMON OR GENERAL | $34.00 | $6.48 |
| LABO0252-017 | LABORER, MASON TENDER BRICK | $50.38 | $16.96 |
| ENGI0701-053 | OPERATORBULLDOZER (OVER 70,000 LBS. UP TO AND INCLUDING 120,000 LBS.) | $55.88 | $17.15 |
| ENGI0701-053 | OPERATORBLADE FINISH | $52.55 | $17.15 |
| ENGI0701-053 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $52.55 | $17.15 |
| ENGI0701-053 | OPERATORLOADER (LESS THAN 25,000 LBS.) | $51.31 | $17.15 |
| ENGI0701-053 | OPERATORLOADER (25,000 LBS. AND LESS THAN 60,000 LBS.) | $52.55 | $17.15 |
| ENGI0701-053 | OPERATORGRADER/BLADE | $52.55 | $17.15 |
| SUWA2018-020 | OPERATOROILER | $36.39 | $16.62 |
| SUWA2018-020 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $35.85 | $7.71 |
| SUWA2018-020 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 |
| SUWA2018-020 | OPERATORMECHANIC | $40.77 | $15.91 |
| SUWA2018-020 | OPERATORROLLER | $42.04 | $12.79 |
| PAIN0300-003 | PAINTER | $41.24 | $14.70 |
| PLUM0026-015 | PIPEFITTER | $60.72 | $34.15 |
| SUWA2018-020 | PLUMBER | $42.47 | $19.17 |
| ROOF0153-007 | ROOFER, EXCLUDES METAL ROOFS | $48.01 | $16.44 |
| SHEE0016-010 | SHEETMETAL WORKER(INCLUDING METAL ROOFING) | $56.24 | $32.72 |
| SFWA0669-001 | SPRINKLER FITTER | $51.65 | $27.57 |
| BRWA0001-025 | TILE FINISHER | $32.68 | $16.48 |
| BRWA0001-025 | TILE SETTER | $43.93 | $21.81 |
| TEAM0174-009 | TRUCK DRIVERCONCRETE TRUCK | $55.43 | $27.52 |
| TEAM0589-002 | TRUCK DRIVERDUMP TRUCK (LESS THAN 16 YARD CAPACITY) | $53.84 | $27.52 |
| TEAM0589-002 | TRUCK DRIVERDUMP TRUCK (16 TO 30 YARD CAPACITY) | $54.68 | $27.52 |