Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Washington: Yakima. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRWA0001-021 | BRICKLAYER | $39.57 | $20.50 |
| CARP0059-018 | CARPENTER | $44.21 | $17.28 |
| SUWA2018-019 | CEMENT MASON/CONCRETE FINISHER | $28.26 | $9.29 |
| ELEC0112-012 | ELECTRICIAN | $60.00 | $27.78 |
| ASBE0007-007 | HEAT & FROST INSULATOR(INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 |
| IRON0086-006 | IRONWORKER | $57.94 | $34.52 |
| LABO0242-015 | LABORERFORM STRIPPING |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $50.38 |
| $16.96 |
| LABO0242-018 | LABORERJACKHAMMER | $51.52 | $16.99 |
| LABO0242-020 | LABORERNOZZLE PERSON | $52.31 | $17.01 |
| LABO0335-007 | LABORERFIRE WATCH | $40.56 | $15.60 |
| LABO0335-012 | LABORERHOD CARRIER | $48.14 | $15.60 |
| SUWA2018-019 | LABORERCOMMON OR GENERAL | $27.94 | $7.89 |
| SUWA2018-019 | LABORERPIPELAYER | $32.17 | $11.49 |
| SUWA2018-019 | LABORERMASON TENDER - CEMENT/CONCRETE | $26.66 | $9.76 |
| SUWA2018-019 | LABORERCONCRETE SAW CHAIN | $35.03 | $10.86 |
| LABO0252-017 | LABORER, MASON TENDER BRICK | $50.38 | $16.96 |
| ENGI0302-099 | OPERATORGRADER/BLADE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 |
| ENGI0302-099 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 |
| ENGI0302-099 | OPERATORBLADE FINISH (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 |
| ENGI0302-099 | OPERATORBULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 |
| ENGI0302-104 | OPERATORLOADER: OVERHEAD UNDER 6 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 |
| ENGI0302-104 | OPERATORLOADER: OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 |
| SUWA2018-019 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 |
| SUWA2018-019 | OPERATORROLLER | $42.04 | $12.79 |
| SUWA2018-019 | OPERATOROILER | $36.39 | $16.62 |
| SUWA2018-019 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $37.76 | $7.02 |
| SUWA2018-019 | OPERATORMECHANIC | $40.77 | $15.91 |
| PAIN0300-003 | PAINTER | $41.24 | $14.70 |
| PLUM0598-001 | PIPEFITTER | $65.20 | $34.91 |
| SUWA2018-019 | PLUMBER | $47.74 | $28.52 |
| ROOF0153-007 | ROOFER, EXCLUDES METAL ROOFS | $48.01 | $16.44 |
| LABO0335-021 | SCAFFOLD BUILDER | $44.06 | $15.60 |
| SHEE0055-010 | SHEETMETAL WORKER(INCLUDING METAL ROOFING) | $50.00 | $28.41 |
| SUWA2018-019 | SPRINKLER FITTER | $25.80 | $8.32 |
| BRWA0001-023 | TILE FINISHER | $27.26 | $11.99 |
| BRWA0001-023 | TILE SETTER | $36.35 | $14.57 |
| TEAM0174-009 | TRUCK DRIVERCONCRETE TRUCK | $55.43 | $27.52 |
| TEAM0589-002 | TRUCK DRIVERDUMP TRUCK (16 TO 30 YARD CAPACITY) | $54.68 | $27.52 |
| TEAM0589-002 | TRUCK DRIVERDUMP TRUCK (LESS THAN 16 YARD CAPACITY) | $53.84 | $27.52 |