Pulling the wage determination…
Revision 2 · modified May 20, 2026 · published May 20, 2026 · Heavy
Covers 1 county in Washington: Klickitat. View the source document on SAM.gov.
DOL marked this determination modified May 20, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUWA2009-041 | CARPENTER, INCLUDES FORM WORK | $26.43 | $7.89 |
| PLAS0555-005 | CEMENT MASON/CONCRETE FINISHERZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $0.65 ZONE 3 - $1.15 ZONE 4 - $1.70 ZONE 5 - $3.00 BASE POINTS: BEND, CORVALLIS, EUGENE, MEDFORD, PORTLAND, SALEM, THE DALLES, VANCOUVER. ZONE 1: PROJECTS WITHIN 30 MILES OF THE RESPECTIVE CITY HALL. ZONE 2: MORE THAN 30 MILES BUT LESS THAN 40 MILES FROM THE RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL. ZONE 4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: | $46.13 | $20.31 |
| ELEC0048-004 | ELECTRICIANHOURLY ZONE PAY: HOURLY ZONE PAY SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE ZONE COMPUTED FROM THE CITY CENTER OF THE FOLLOWING LISTED CITIES: PORTLAND, THE DALLES, HOOD RIVER, TILLAMOOK, SEASIDE, AND ASTORIA ZONE PAY: ZONE 1: 31-50 MILES $1.50/HOUR ZONE 2: 51-70 MILES $3.50/HOUR ZONE 3: 71-90 MILES $5.50/HOUR ZONE 4: BEYOND 90 MILES $9.00/HOUR *THESE ARE NOT MILES DRIVEN. ZONES ARE BASED ON DELORRNE STREET ATLAS USA 2006 PLUS | $63.50 | $29.73 |
| SUWA2009-041 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| FENCE ERECTOR |
| $15.00 |
| $0.00 |
| IRON0029-009 | IRONWORKER(REINFORCING AND STRUCTURAL) | $48.31 | $34.52 |
| LABO0335-023 | LABORERGROUP 4 CHIPPING GUNS; MASON TENDER-CEMENT/CONCRETE; | $44.90 | $15.60 |
| LABO0335-023 | LABORERGROUP 6 GRADE CHECKER; PIPELAYER | $46.08 | $15.60 |
| LABO0335-023 | LABORERGROUP 3 MASON TENDER BRICK | $44.06 | $15.60 |
| LABO0335-023 | LABORERGROUP 2 FLAGGER | $40.56 | $15.60 |
| SUWA2009-041 | LABORERLANDSCAPE | $14.67 | $0.00 |
| SUWA2009-041 | LABORERCOMMON OR GENERAL | $20.96 | $5.50 |
| CARP1607-009 | MILLWRIGHT | $61.62 | $20.43 |
| SUWA2009-041 | OPERATORMECHANIC | $25.25 | $8.20 |
| SUWA2009-041 | OPERATORBULLDOZER | $27.22 | $6.80 |
| SUWA2009-041 | OPERATORBACKHOE | $27.03 | $8.20 |
| SUWA2009-041 | OPERATORROLLER | $25.25 | $8.20 |
| SUWA2009-041 | OPERATORLOADER | $26.31 | $8.20 |
| PAIN0010-016 | PAINTERBRUSH, ROLLER, AND SPRAY | $39.94 | $16.68 |
| SUWA2009-041 | PIPEFITTER | $28.85 | $11.55 |
| ENGI0701-008 | POWER EQUIPMENT OPERATORGROUP 5- ASPHALT, EXTRUSION MACHINE; ASPHALT, ROLLER (ANY ASPHALT MIX); ASPHALT, ROTO-MILL PAVEMENT PROFILER GROUND MAN; BULLDOZER, 20,000LBS OR LESS, OR 100 HORSE OR LESS; CEMENT PUMP; CHIP SPREADING MACHINE; CHURN DRILL AND EARTH BORING MACHINE; COMPACTOR, SELF-PROPELLED WITHOUT BLADE; COMPRESSOR, (ANY POWER) 1,240 CU. FT. AND OVER, TOTAL CAPACITY; CONCRETE, BATCH PLANT QUALITY CONTROL; CONCRETE, COMBINATION MIXER AND COMPRESSOR OPERATOR, GUNITE WORK; CONCRETE, CURB MACHINE, MECHANCIAL BERM, C | $51.31 | $17.15 |
| ENGI0701-008 | POWER EQUIPMENT OPERATORGROUP 4 ASPHALT, SCREED; ASPHALT PAVER; ASPHALT ROTO-MILL, PAVEMENT PROFILER, UNDER EIGHT FOOT (8') LATERAL CUT; ASPHALT, MATERIAL TRANSFER VEHICLE OPERATOR; BACK FILLING MACHINE; BACKHOE, ROBOTIC, TRACK AND WHEEL TYPE UP TO AND INCLUDING TWENTY THOUSAND (20,000) LBS. WITH ANY ATTACHMENTS; BLADE (ANY TYPE); BOATMAN; BORING MACHINE; BULLDOZER OVER TWENTY THOUSAND (20,000) LBS. AND MORE THAN ONE HUNDRED (100) HORSE UP TO SEVENTY THOUSAND (70,000) LBS.; CABLE-PLOW (ANY TYPE); CABLEWAY UP TO TWENTY | $52.55 | $17.15 |
| ENGI0701-008 | POWER EQUIPMENT OPERATORGROUP 3- BULLDOZER, OVER SEVENTY THOUSAND (70,000) LBS. UP TO AND INCLUDING ONE HUNDRED TWENTY THOUSAND (120,000) LBS.; CRANE, BOOM TRUCK FIFTY (50) TON AND OVER WITH LESS THAN ONE HUNDRED FIFTY FOOT (150') BOOM; CRANE, FIFTY (50) TON THROUGH EIGHTY NINE (89) TON WITH ONE HUNDRED FIFTY FOOT (150') BOOM OR LESS (INCLUDING JIB INSERTS AND/OR ATTACHMENTS); CRANE, SHOVEL, DRAGLINE OR CLAMSHELL THREE (3) CU. YDS. BUT LESS THAN FIVE (5) CU. YDS.; EXCAVATOR OVER EIGHTY THOUSAND (80,000) LBS. THROUGH ON | $55.88 | $17.15 |
| ENGI0701-008 | POWER EQUIPMENT OPERATORGROUP 2- ASPHALT PLANT (ANY TYPE); ASPHALT ROTO-MILL, PAVEMENT PROFILER EIGHT FOOT (8') LATERAL CUT AND OVER; AUTO GRADER OR ""TRIMMER""; BLADE, ROBOTIC; BULLDOZER, ROBOTIC EQUIPMENT (ANY TYPE); BULLDOZER, OVER ONE HUNDRED TWENTY THOUSAND (120,000) LBS. AND ABOVE; CONCRETE BATCH PLANT AND/OR WET MIX ONE (1) AND TWO (2) DRUM; CONCRETE DIAMOND HEAD PROFILER; CANAL TRIMMER; CONCRETE, AUTOMATIC SLIP FORM PAVER (ASSISTANT TO THE OPERATOR REQUIRED); CRANE, BOOM TRUCK FIFTY (50) TON AND WITH OVER ONE H | $57.03 | $17.15 |
| ENGI0701-008 | POWER EQUIPMENT OPERATORGROUP 1- CONCRETE BATCH PLAN AND OR WET MIX THREE (3) UNITS OR MORE; CRANE, FLOATING ONE HUNDRED AND FIFTY (150) TON BUT LESS THAN TWO HUNDRED AND FIFTY (250) TON; CRANE, TWO HUNDRED (200) TON THROUGH TWO HUNDRED NINETY NINE (299) TON WITH TWO HUNDRED FOOT (200') BOOM OR LESS (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, NINETY (90) TON THROUGH ONE HUNDRED NINETY NINE (199) TON WITH OVER TWO HUNDRED (200') BOOM INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, TOWER CRANE WITH ONE HUNDRED | $58.94 | $17.15 |
| ENGI0701-008 | POWER EQUIPMENT OPERATORGROUP 1B- CRANE, THREE HUNDRED (300) TON THROUGH THREE HUNDRED NINETY NINE (399) TON, WITH OVER TWO HUNDRED FOOT (200') BOOM (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); FLOATING CRANE, THREE HUNDRED FIFTY (350) TON AND OVER; CRANE, FOUR HUNDRED (400) TON AND OVER. ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS | $63.26 | $17.15 |
| ENGI0701-008 | POWER EQUIPMENT OPERATORGROUP 1A- CRANE, FLOATING TWO HUNDRED FIFTY (250) TON AND OVER; CRANE, TWO HUNDRED (200) TON THROUGH TWO HUNDRED NINETY NINE (299) TON, WITH OVER TWO HUNDRED FOOT (200') BOOM (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, THREE HUNDRED (300) TON THROUGH THREE HUNDRED NINETY NINE (399) TON; CRANE, TOWER CRANE WITH OVER ONE HUNDRED SEVENTY FIVE FOOT (175') TOWER OR OVER TWO HUNDRED FOOT (200') JIB; CRANE, TOWER CRANE ON RAIL SYSTEM OR 2ND TOWER OR MORE IN WORK RADIUS. ZONE DIFFERENTIAL (ADD T | $61.10 | $17.15 |
| ENGI0701-008 | POWER EQUIPMENT OPERATORGROUP 6- ASPHALT, PUGMILL (ANY TYPE); ASPHALT, RAKER; ASPHALT, TRUCK MOUNTED ASPHALT SPREADER, WITH SCREED; AUGER OILER; BOATMAN; BOBCAT, SKID STEED (LESS THAN ONE (1) YARD); BROOM, SELF-PROPELLED; COMPRESSOR OPERATOR (ANY POWER) UNDER 1,250 CU. FT. TOTAL CAPACITY; CONCRETE CURING MACHINE (RIDING TYPE); CONCRETE SAW; CONVEYOR OPERATOR OR ASSISTANT; CRANE, TUGGER; CRUSHER FEEDERMAN; CRUSHER OILER; DECKHAND; DRILL, DIRECTIONAL LOCATOR; FORK LIFT; GRADE CHECKER; GUARDRAIL PUNCH OILER; HYDROGRAPHIC | $48.09 | $17.15 |
| SUWA2009-041 | TRUCK DRIVER10 YARD TRUCK | $24.61 | $8.34 |
| SUWA2009-041 | TRUCK DRIVERDUMP TRUCK | $19.33 | $5.81 |
| SUWA2009-041 | TRUCK DRIVERWATER TRUCK | $24.36 | $8.30 |