Revision 2 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Washington: Grant. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0059-024 | CARPENTER(INCLUDING FORM WORK) | $44.21 | $17.28 |
| SUWA2009-036 | CEMENT MASON/CONCRETE FINISHER | $17.21 | $0.00 |
| ELEC0191-015 | ELECTRICIAN | $46.15 | $26.10 |
| IRON0014-001 | IRONWORKER(REINFORCING AND STRUCTURAL) | $43.40 | $32.77 |
| LABO0238-003 | LABORERA-2: GROUP 10 GRADE CHECKER | $43.21 | $16.90 |
| LABO0238-003 | LABORERA-2: GROUP 1 FLAGGER | $37.03 | $16.90 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABO0238-003 |
| LABORERA-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS |
| $40.46 |
| $16.90 |
| SUWA2009-036 | LABORERLANDSCAPE | $14.67 | $0.00 |
| SUWA2009-036 | LABORERCOMMON OR GENERAL | $22.68 | $0.00 |
| LABO0238-007 | LABORER, MASON TENDER BRICK | $38.05 | $16.75 |
| ELEC0077-001 | LINE CONSTRUCTIONLINEMEN | $60.54 | $24.88 |
| CARP1607-009 | MILLWRIGHT | $61.62 | $20.43 |
| SUWA2009-036 | OPERATORDRILL | $28.15 | $8.20 |
| PAIN0427-003 | PAINTER(BRUSH, ROLLER, AND SPRAY.) | $36.26 | $17.01 |
| SUWA2009-036 | PIPEFITTER | $25.98 | $3.98 |
| ENGI0302-126 | POWER EQUIPMENT OPERATORGROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | $42.31 | $23.40 |
| ENGI0302-126 | POWER EQUIPMENT OPERATORGROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); BOOM TRUCK (UNDER 25 TONS) | $42.71 | $23.40 |
| ENGI0302-126 | POWER EQUIPMENT OPERATORGROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | $43.05 | $23.40 |
| ENGI0302-126 | POWER EQUIPMENT OPERATORGROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE | $43.39 | $23.40 |
| ENGI0302-126 | POWER EQUIPMENT OPERATORGROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | $45.36 | $23.40 |
| ENGI0302-126 | POWER EQUIPMENT OPERATORGROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS | $41.17 | $23.40 |
| ENGI0302-126 | POWER EQUIPMENT OPERATORGROUP 2 FORK LIFT | $41.56 | $23.40 |
| ENGI0302-126 | POWER EQUIPMENT OPERATORGROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER | $42.51 | $23.40 |
| SUWA2009-036 | TRUCK DRIVER10 YARD TRUCK | $24.61 | $8.34 |
| SUWA2009-036 | TRUCK DRIVERWATER TRUCK | $24.36 | $8.30 |
| SUWA2009-036 | TRUCK DRIVERDUMP TRUCK | $19.67 | $0.00 |