Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Washington: Whitman. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRWA0003-002 | BRICKLAYER | $33.95 | $19.33 |
| CARP0059-022 | CARPENTER(INCLUDING DRYWALL HANGING AND FORM WORK) | $44.21 | $17.28 |
| PLAS0072-008 | CEMENT MASON/CONCRETE FINISHERZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 |
| PAIN0427-001 | DRYWALL FINISHER/TAPER | $37.46 | $18.42 |
| ELEC0073-004 | ELECTRICIAN | $49.55 | $19.09 |
| PAIN1238-003 | FLOOR LAYERCARPET AND VINYL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $42.01 |
| $20.20 |
| IRON0014-012 | IRONWORKERORNAMENTAL, REINFORCING AND STRUCTURAL | $43.40 | $32.77 |
| LABO0238-008 | LABORERA-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER | $37.46 | $16.90 |
| LABO0238-008 | LABORERA-1: GROUP 10 GRADE CHECKER | $40.21 | $16.90 |
| SUWA2002-022 | LABORERCOMMON OR GENERAL | $17.27 | $0.00 |
| LABO0238-007 | LABORER, MASON TENDER BRICK | $38.05 | $16.75 |
| SUWA2002-022 | OPERATORCRANE | $25.53 | $0.00 |
| SUWA2002-022 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 |
| PAIN0427-002 | PAINTERBRUSH, ROLLER, AND SPRAY | $33.95 | $15.65 |
| PLUM0044-002 | PIPEFITTER | $47.15 | $27.20 |
| SUWA2002-022 | PIPE INSULATOR/WRAPPER | $24.21 | $4.07 |
| SUWA2002-022 | PLUMBER | $35.00 | $0.00 |
| ENGI0302-133 | POWER EQUIPMENT OPERATORGROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | $40.05 | $23.40 |
| ENGI0302-133 | POWER EQUIPMENT OPERATORGROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER) LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) | $40.39 | $23.40 |
| ENGI0302-133 | POWER EQUIPMENT OPERATORGROUP 8 LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | $42.36 | $23.40 |
| ENGI0302-133 | POWER EQUIPMENT OPERATORGROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) | $39.51 | $23.40 |
| ENGI0302-133 | POWER EQUIPMENT OPERATORGROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | $39.31 | $23.40 |
| ENGI0302-133 | POWER EQUIPMENT OPERATORGROUP 2 FORK LIFT | $38.56 | $23.40 |
| ENGI0302-133 | POWER EQUIPMENT OPERATORGROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS | $38.17 | $23.40 |
| ENGI0302-133 | POWER EQUIPMENT OPERATORGROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.) | $39.71 | $23.40 |
| ROOF0189-001 | ROOFER(INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $35.75 | $14.40 |
| SHEE0055-012 | SHEETMETAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $45.83 | $27.92 |
| SFWA0699-005 | SPRINKLER FITTER(FIRE SPRINKLERS) | $44.30 | $28.58 |
| BRWA0003-009 | TILE SETTER | $29.86 | $13.95 |
| SUWA2002-022 | TRUCK DRIVER | $23.50 | $6.87 |