Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Washington: Wahkiakum. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0036-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR(PIPE INSULATION ONLY) | $62.02 | $22.36 |
| BRWA0001-020 | BRICKLAYER | $49.60 | $25.18 |
| CARP0503-023 | CARPENTER, INCLUDES FORM WORK | $54.69 | $16.81 |
| PLAS0528-004 | CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 |
| CARP0503-023 | DRYWALL HANGER | $54.49 | $16.81 |
| ELEC0048-032 | ELECTRICIAN | $63.50 | $29.73 |
| IRON0029-003 | IRONWORKER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $48.31 |
| $34.52 |
| LABO0335-025 | LABORERGROUP 3 COMMON OR GENERAL LABORER, MASON TENDER BRICK | $44.06 | $15.60 |
| LABO0335-025 | LABORERGROUP 4 MASON TENDER-CEMENT/CONCRETE | $45.54 | $15.60 |
| LABO0335-025 | LABORERGROUP 6 GRADE CHECKER; PIPELAYER | $46.08 | $15.60 |
| SUWA2002-020 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 |
| SUWA2002-020 | PAINTERSPRAY | $17.80 | $4.18 |
| PAIN0010-015 | PAINTERS(BRUSH AND ROLLER, EXCLUDE SPRAY) | $40.85 | $16.68 |
| PLUM0026-010 | PIPEFITTER | $60.72 | $34.15 |
| SUWA2002-020 | PLUMBER | $35.00 | $0.00 |
| ENGI0701-010 | POWER EQUIPMENT OPERATORGROUP 1B CRANE, THREE HUNDRED (300) TON THROUGH THREE HUNDRED NINETY NINE (399) TON, WITH OVER TWO HUNDRED FOOT (200') BOOM (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); FLOATING CRANE, THREE HUNDRED FIFTY (350) TON AND OVER; CRANE, FOUR HUNDRED (400) TON AND OVER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS | $63.26 | $17.15 |
| ENGI0701-010 | POWER EQUIPMENT OPERATORGROUP 1 CONCRETE BATCH PLAN AND OR WET MIX THREE (3) UNITS OR MORE; CRANE, FLOATING ONE HUNDRED AND FIFTY (150) TON BUT LESS THAN TWO HUNDRED AND FIFTY (250) TON; CRANE, TWO HUNDRED (200) TON THROUGH TWO HUNDRED NINETY NINE (299) TON WITH TWO HUNDRED FOOT (200') BOOM OR LESS (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, NINETY (90) TON THROUGH ONE HUNDRED NINETY NINE (199) TON WITH OVER TWO HUNDRED (200') BOOM INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, TOWER CRANE WITH ONE HUNDRED | $58.94 | $17.15 |
| ENGI0701-010 | POWER EQUIPMENT OPERATORGROUP 2 ASPHALT PLANT (ANY TYPE); ASPHALT ROTO-MILL, PAVEMENT PROFILER EIGHT FOOT (8') LATERAL CUT AND OVER; AUTO GRADER OR ""TRIMMER""; BLADE, ROBOTIC; BULLDOZER, ROBOTIC EQUIPMENT (ANY TYPE); BULLDOZER, OVER ONE HUNDRED TWENTY THOUSAND (120,000) LBS. AND ABOVE; CONCRETE BATCH PLANT AND/OR WET MIX ONE (1) AND TWO (2) DRUM; CONCRETE DIAMOND HEAD PROFILER; CANAL TRIMMER; CONCRETE, AUTOMATIC SLIP FORM PAVER (ASSISTANT TO THE OPERATOR REQUIRED); CRANE, BOOM TRUCK FIFTY (50) TON AND WITH OVER ONE HU | $57.03 | $17.15 |
| ENGI0701-010 | POWER EQUIPMENT OPERATORGROUP 3 BULLDOZER, OVER SEVENTY THOUSAND (70,000) LBS. UP TO AND INCLUDING ONE HUNDRED TWENTY THOUSAND (120,000) LBS.; CRANE, BOOM TRUCK FIFTY (50) TON AND OVER WITH LESS THAN ONE HUNDRED FIFTY FOOT (150') BOOM; CRANE, FIFTY (50) TON THROUGH EIGHTY NINE (89) TON WITH ONE HUNDRED FIFTY FOOT (150') BOOM OR LESS (INCLUDING JIB INSERTS AND/OR ATTACHMENTS); CRANE, SHOVEL, DRAGLINE OR CLAMSHELL THREE (3) CU. YDS. BUT LESS THAN FIVE (5) CU. YDS.; EXCAVATOR OVER EIGHTY THOUSAND (80,000) LBS. THROUGH ONE | $55.88 | $17.15 |
| ENGI0701-010 | POWER EQUIPMENT OPERATORGROUP 4 ASPHALT, SCREED; ASPHALT PAVER; ASPHALT ROTO-MILL, PAVEMENT PROFILER, UNDER EIGHT FOOT (8') LATERAL CUT; ASPHALT, MATERIAL TRANSFER VEHICLE OPERATOR; BACK FILLING MACHINE; BACKHOE, ROBOTIC, TRACK AND WHEEL TYPE UP TO AND INCLUDING TWENTY THOUSAND (20,000) LBS. WITH ANY ATTACHMENTS; BLADE (ANY TYPE); BOATMAN; BORING MACHINE; BULLDOZER OVER TWENTY THOUSAND (20,000) LBS. AND MORE THAN ONE HUNDRED (100) HORSE UP TO SEVENTY THOUSAND (70,000) LBS.; CABLE-PLOW (ANY TYPE); CABLEWAY UP TO TWENTY | $52.55 | $17.15 |
| ENGI0701-010 | POWER EQUIPMENT OPERATORGROUP 5 ASPHALT, EXTRUSION MACHINE; ASPHALT, ROLLER (ANY ASPHALT MIX); ASPHALT, ROTO-MILL PAVEMENT PROFILER GROUND MAN; BULLDOZER, TWENTY THOUSAND (20,000) LBS. OR LESS, OR ONE HUNDRED (100) HORSE OR LESS; CEMENT PUMP; CHIP SPREADING MACHINE; CHURN DRILL AND EARTH BORING MACHINE; COMPACTOR, SELF-PROPELLED WITHOUT BLADE; COMPRESSOR, (ANY POWER) ONE THOUSAND TWO HUNDRED FIFTY (1,250) CU. FT. AND OVER, TOTAL CAPACITY; CONCRETE, BATCH PLANT QUALITY CONTROL; CONCRETE, COMBINATION MIXER AND COMPRESSOR | $51.31 | $17.15 |
| ENGI0701-010 | POWER EQUIPMENT OPERATORGROUP 6 ASPHALT, PUGMILL (ANY TYPE); ASPHALT, RAKER; ASPHALT, TRUCK MOUNTED ASPHALT SPREADER, WITH SCREED; AUGER OILER; BOATMAN; BOBCAT, SKID STEED (LESS THAN ONE (1) YARD); BROOM, SELF-PROPELLED; COMPRESSOR OPERATOR (ANY POWER) UNDER 1,250 CU. FT. TOTAL CAPACITY; CONCRETE CURING MACHINE (RIDING TYPE); CONCRETE SAW; CONVEYOR OPERATOR OR ASSISTANT; CRANE, TUGGER; CRUSHER FEEDERMAN; CRUSHER OILER; DECKHAND; DRILL, DIRECTIONAL LOCATOR; FORK LIFT; GRADE CHECKER; GUARDRAIL PUNCH OILER; HYDROGRAPHIC S | $48.09 | $17.15 |
| ENGI0701-010 | POWER EQUIPMENT OPERATORGROUP 1A CRANE, FLOATING TWO HUNDRED FIFTY (250) TON AND OVER; CRANE, TWO HUNDRED (200) TON THROUGH TWO HUNDRED NINETY NINE (299) TON, WITH OVER TWO HUNDRED FOOT (200') BOOM (INCLUDING JIB, INSERTS AND/OR ATTACHMENTS); CRANE, THREE HUNDRED (300) TON THROUGH THREE HUNDRED NINETY NINE (399) TON; CRANE, TOWER CRANE WITH OVER ONE HUNDRED SEVENTY FIVE FOOT (175') TOWER OR OVER TWO HUNDRED FOOT (200') JIB; CRANE, TOWER CRANE ON RAIL SYSTEM OR 2ND TOWER OR MORE IN WORK RADIUS ZONE DIFFERENTIAL (ADD TO | $61.10 | $17.15 |
| ROOF0153-002 | ROOFER(INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $47.98 | $16.47 |
| SHEE0066-004 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $69.86 | $33.39 |
| PAIN1236-002 | SOFT FLOOR LAYER(INCLUDING VINYL AND CARPET) | $41.77 | $21.18 |
| BRWA0001-004 | TILE SETTER | $43.93 | $21.81 |
| SUWA2002-020 | TRUCK DRIVERDUMP TRUCK | $23.50 | $6.87 |