Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Vermont: Rutland. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0349-003 | CARPENTER(INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION) | $30.56 | $19.79 |
| SUVT2011-005 | CARPENTER(DRYWALL HANGING ONLY) | $23.00 | $5.94 |
| SUVT2011-005 | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING | $18.28 | $6.67 |
| SUVT2011-005 | ELECTRICIAN | $20.24 | $7.27 |
| IRON0007-002 | IRONWORKER, REINFORCING | $33.65 | $26.12 |
| SUVT2011-005 | LABORERCOMMON OR GENERAL | $11.83 | $0.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUVT2011-005 |
| OPERATORCRANE |
| $19.50 |
| $6.08 |
| SUVT2011-005 | PAINTERBRUSH ONLY | $16.11 | $4.14 |
| SUVT2011-005 | PAINTERROLLER | $16.11 | $4.14 |
| SUVT2011-005 | PLUMBER(HVAC PIPE INSTALLATION) | $25.35 | $5.79 |
| SUVT2011-005 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $24.04 | $8.25 |
| SUVT2011-005 | ROOFER | $17.25 | $1.71 |
| SHEE0063-005 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $36.75 | $18.63 |
| SUVT2011-005 | SPRINKLER FITTER(FIRE SPRINKLERS) | $27.48 | $7.24 |