Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Virginia: Scott. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUVA2016-075 | CARPENTER, INCLUDES FORM WORK | $17.65 | $0.00 |
| SUVA2016-075 | CEMENT MASON/CONCRETE FINISHER | $19.94 | $0.00 |
| ELEC0080-011 | ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 |
| SUVA2016-075 | INSTALLER - GUARDRAIL | $24.00 | $0.00 |
| SUVA2016-075 | IRONWORKER, REINFORCING | $22.71 | $0.00 |
| SUVA2016-075 | IRONWORKER, STRUCTURAL | $27.38 | $0.00 |
| SUVA2016-075 | LABORERCOMMON OR GENERAL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $13.44 |
| $0.00 |
| SUVA2016-075 | LABORERPIPELAYER | $13.19 | $0.00 |
| SUVA2016-075 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $15.40 | $0.00 |
| SUVA2016-075 | LABORERPOWER TOOL OPERATOR | $15.69 | $0.00 |
| SUVA2016-075 | LABORERGRADE CHECKER | $15.07 | $0.00 |
| SUVA2016-075 | OPERATORMECHANIC | $20.60 | $0.00 |
| SUVA2016-075 | OPERATORMILLING MACHINE | $23.12 | $3.60 |
| SUVA2016-075 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.92 | $0.00 |
| SUVA2016-075 | OPERATORPILEDRIVER | $21.83 | $4.08 |
| SUVA2016-075 | OPERATORROLLER | $15.53 | $0.00 |
| SUVA2016-075 | OPERATORSCREED | $22.13 | $4.89 |
| SUVA2016-075 | OPERATORDRILL | $24.66 | $0.00 |
| SUVA2016-075 | OPERATORASPHALT SPREADER AND DISTRIBUTOR | $16.51 | $0.00 |
| SUVA2016-075 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $14.90 | $0.00 |
| SUVA2016-075 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $19.16 | $4.45 |
| SUVA2016-075 | OPERATORBROOM/SWEEPER | $14.32 | $0.25 |
| SUVA2016-075 | OPERATORBULLDOZER, INCLUDING UTILITY | $15.98 | $0.00 |
| SUVA2016-075 | OPERATORCRANE | $25.82 | $0.00 |
| SUVA2016-075 | OPERATORGRADALL | $18.65 | $0.00 |
| SUVA2016-075 | OPERATORGRADER/BLADE | $26.13 | $0.00 |
| SUVA2016-075 | OPERATORHYDROSEEDER | $16.64 | $0.00 |
| SUVA2016-075 | OPERATORLOADER | $18.39 | $0.00 |
| SUVA2016-075 | PAVEMENT MARKING OPERATOR | $20.00 | $0.00 |
| SUVA2016-075 | TRAFFIC CONTROLFLAGGER | $11.65 | $0.00 |
| SUVA2016-075 | TRUCK DRIVERFUEL AND LUBRICANT SERVICE | $18.25 | $0.00 |
| SUVA2016-075 | TRUCK DRIVERHEAVY 7CY & UNDER | $15.36 | $0.00 |
| SUVA2016-075 | TRUCK DRIVERHEAVY OVER 7 CY | $16.60 | $0.00 |
| SUVA2016-075 | TRUCK DRIVERSINGLE & MULTI AXLE | $15.71 | $0.00 |