Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Virginia: Virginia Beach*. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRVA0001-002 | BRICKLAYER | $22.44 | $10.23 |
| SUVA2012-023 | CARPENTER | $14.42 | $0.00 |
| SUVA2012-023 | CEMENT MASON/CONCRETE FINISHER | $15.13 | $0.00 |
| SUVA2012-023 | DRYWALL FINISHER/TAPER | $14.00 | $0.00 |
| SUVA2012-023 | DRYWALL HANGER AND METAL STUD INSTALLER | $13.79 | $0.00 |
| SUVA2012-023 | ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $15.83 | $0.00 |
| ELEV0052-004 | ELEVATOR MECHANIC A. PAID HOLIDAYSNEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY. B. VACATIONS: 6% MEN UNDER 5 YEARS BASED ON REGULAR HOURLY RATE AND 8% MEN OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $52.06 |
| $38.44 |
| SUVA2012-023 | FLOOR LAYERCARPET | $17.50 | $0.00 |
| SUVA2012-023 | IRONWORKER, ORNAMENTAL | $15.59 | $0.00 |
| SUVA2012-023 | IRONWORKER, STRUCTURAL | $21.55 | $1.39 |
| SUVA2012-023 | LABORERLANDSCAPE | $11.72 | $0.00 |
| SUVA2012-023 | LABORERCOMMON OR GENERAL | $12.34 | $0.00 |
| SUVA2012-023 | LABORERMASON TENDER - BRICK | $13.79 | $0.00 |
| SUVA2012-023 | LABORERMASON TENDER - CEMENT/CONCRETE | $13.00 | $0.00 |
| SUVA2012-023 | LABORERPIPELAYER | $14.04 | $2.66 |
| SUVA2012-023 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $17.30 | $2.83 |
| SUVA2012-023 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $15.26 | $0.80 |
| SUVA2012-023 | OPERATORBULLDOZER | $15.17 | $2.27 |
| SUVA2012-023 | OPERATORLOADER | $15.21 | $2.77 |
| SUVA2012-023 | PAINTER(BRUSH AND ROLLER) | $12.25 | $0.00 |
| SUVA2012-023 | PLUMBER | $16.34 | $0.00 |
| ENGI0147-012 | POWER EQUIPMENT OPERATOR(CRANES UNDER 90 TONS) | $39.99 | $18.05 |
| ENGI0147-012 | POWER EQUIPMENT OPERATOR(CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 |
| SUVA2012-023 | ROOFER | $13.09 | $0.00 |
| SUVA2012-023 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $16.60 | $0.00 |
| SUVA2012-023 | SPRINKLER FITTER(FIRE SPRINKLERS) | $18.09 | $3.15 |
| SUVA2012-023 | TRUCK DRIVERDUMP TRUCK | $16.30 | $0.00 |