Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 9 counties in Virginia: Alleghany, Bath, Highland, Louisa, Madison, Orange, Page, Rockbridge, Shenandoah. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0024-006 | ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 |
| SUVA2013-017 | CARPENTER | $16.59 | $1.73 |
| SUVA2013-017 | ELECTRICIAN | $19.75 | $0.00 |
| SUVA2013-017 | GLAZIER | $14.91 | $0.00 |
| SUVA2013-017 | LABORERCOMMON OR GENERAL | $11.29 | $2.08 |
| SUVA2013-017 | OPERATOR |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $11.00 |
| $0.50 |
| SUVA2013-017 | PIPEFITTER | $21.47 | $7.19 |
| SUVA2013-017 | PLUMBER | $18.45 | $3.05 |
| ENGI0147-015 | POWER EQUIPMENT OPERATORBULLDOZER | $38.79 | $18.05 |
| SUVA2013-017 | ROOFER | $15.56 | $3.06 |
| SUVA2013-017 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $22.33 | $7.94 |
| SUVA2013-017 | TRUCK DRIVERDUMP TRUCK | $11.25 | $0.57 |