Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Utah: Utah. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0801-002 | CARPENTER(DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 |
| SUUT2012-019 | CARPENTER(EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $19.51 | $5.18 |
| SUUT2012-019 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $21.29 | $1.95 |
| SUUT2012-019 | CEMENT MASON/CONCRETE FINISHER | $19.57 | $0.00 |
| SUUT2012-019 | DRYWALL FINISHER/TAPER | $19.23 | $4.85 |
| ELEC0354-004 | ELECTRICIAN | $41.23 | $17.66 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEV0038-003 | ELEVATOR MECHANIC FOOTNOTEA: VACATION PAY: 8% WITH 5 OR MORE YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED, 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $55.43 | $38.44 |
| SUUT2012-019 | IRONWORKER, STRUCTURAL | $20.21 | $3.22 |
| SUUT2012-019 | LABORERIRRIGATION | $9.50 | $0.00 |
| SUUT2012-019 | LABORERCOMMON OR GENERAL | $14.48 | $0.00 |
| SUUT2012-019 | LABORERMASON TENDER - BRICK | $16.38 | $1.00 |
| SUUT2012-019 | LABORERMASON TENDER - CEMENT/CONCRETE | $14.79 | $0.00 |
| SUUT2012-019 | LABORERPIPELAYER | $13.57 | $0.00 |
| SUUT2012-019 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $16.92 | $0.00 |
| SUUT2012-019 | OPERATORLOADER | $19.34 | $0.00 |
| PAIN0077-005 | PAINTER(SPRAY ONLY) | $26.00 | $8.78 |
| SUUT2012-019 | PAINTER(BRUSH AND ROLLER, EXCLUDING DRYWALLING/TAPING) | $12.00 | $0.00 |
| PLUM0140-001 | PLUMBER/PIPEFITTER | $46.10 | $15.83 |
| SUUT2012-019 | ROOFER | $15.62 | $0.00 |
| SHEE0312-002 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $46.79 | $14.89 |
| SUUT2012-019 | SPRINKLER FITTER(FIRE SPRINKLERS) | $24.76 | $7.83 |
| SUUT2012-019 | TILE FINISHER | $13.54 | $0.00 |
| SUUT2012-019 | TILE SETTER | $23.00 | $0.00 |
| SUUT2012-019 | TRUCK DRIVERDUMP TRUCK | $16.49 | $0.00 |