Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Utah: Tooele. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUUT2012-018 | BRICKLAYER | $22.13 | $1.67 |
| CARP0801-002 | CARPENTER(DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $31.66 | $13.97 |
| SUUT2012-018 | CARPENTER(FORM WORK ONLY) | $16.93 | $1.93 |
| SUUT2012-018 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $21.25 | $2.40 |
| SUUT2012-018 | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.73 | $7.53 |
| SUUT2012-018 | CEMENT MASON/CONCRETE FINISHER | $15.00 | $0.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| PAIN0077-003 | DRYWALL FINISHER/TAPER | $26.00 | $8.78 |
| ELEC0354-001 | ELECTRICIAN | $41.23 | $17.66 |
| ELEC0354-001 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $31.86 | $15.83 |
| ELEV0038-003 | ELEVATOR MECHANIC FOOTNOTEA: VACATION PAY: 8% WITH 5 OR MORE YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED, 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B: PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $55.43 | $38.44 |
| SUUT2012-018 | INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $15.28 | $1.65 |
| SUUT2012-018 | IRONWORKER, STRUCTURAL | $20.21 | $3.22 |
| SUUT2012-018 | LABORERLANDSCAPE AND IRRIGATION | $9.50 | $0.00 |
| SUUT2012-018 | LABORERPIPELAYER | $13.57 | $0.00 |
| SUUT2012-018 | LABORERMASON TENDER - CEMENT/CONCRETE | $14.94 | $0.00 |
| SUUT2012-018 | LABORERMASON TENDER - BRICK | $16.38 | $1.00 |
| SUUT2012-018 | LABORERCOMMON OR GENERAL | $13.84 | $0.00 |
| SUUT2012-018 | OPERATORLOADER | $19.34 | $0.00 |
| SUUT2012-018 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $14.48 | $0.00 |
| PAIN0077-004 | PAINTER(BRUSH, ROLLER, AND SPRAY, EXCLUDING DRYWALL/FINISHER AND TAPER) | $26.00 | $8.78 |
| SUUT2012-018 | PLASTERER | $18.36 | $0.00 |
| PLUM0140-001 | PLUMBER/PIPEFITTER | $46.10 | $15.83 |
| SUUT2012-018 | ROOFER | $13.22 | $0.00 |
| SHEE0312-002 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $46.79 | $14.89 |
| SFUT0669-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $42.17 | $26.63 |
| SUUT2012-018 | TILE FINISHER | $13.54 | $0.00 |
| SUUT2012-018 | TILE SETTER | $23.50 | $0.00 |
| SUUT2012-018 | TRUCK DRIVERDUMP TRUCK | $15.50 | $0.00 |