Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Utah: Sevier. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUUT2008-030 | CARPENTER, INCLUDES FORM WORK(EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 |
| SUUT2008-030 | CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 |
| SUUT2008-030 | LABORERMASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 |
| SUUT2008-030 | LABORERPIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.32 | $0.00 |
| SUUT2008-030 | LABORERCOMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $10.92 | $0.00 |
| LABO0295-018 | LABORER CHAIN SAW AND POWER DRILL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $20.85 |
| $8.65 |
| LABO0295-018 | LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDERNATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 |
| LABO0295-018 | LABORER FORMWORKERNATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 |
| LABO0295-018 | LABORER POWDERMANNATURAL GAS PIPELINE CONSTRUCTION ONLY | $21.65 | $8.65 |
| LABO0295-018 | LABORER SANDBLASTERNATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 |
| ENGI0003-054 | OPERATORPOWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 |
| ENGI0003-054 | OPERATORPOWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 |
| SUUT2008-030 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 |
| SUUT2008-030 | OPERATORGRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 |
| SUUT2008-030 | OPERATORLOADER (FRONT END) | $12.00 | $0.00 |
| SUUT2008-030 | OPERATORROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 |
| SUUT2008-030 | TRUCK DRIVER(EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 |
| TEAM0222-001 | TRUCK DRIVERGROUP 3 AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGE | $40.66 | $15.75 |
| TEAM0222-001 | TRUCK DRIVERNATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 2 STRINGER TRUCK PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE | $41.06 | $15.75 |
| TEAM0222-001 | TRUCK DRIVERNATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 1 LOW BOY AND TRUCK MECHANIC PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE | $41.71 | $15.75 |