Revision 2 · modified May 20, 2026 · published May 20, 2026 · Heavy
Covers 1 county in Utah: Iron. View the source document on SAM.gov.
DOL marked this determination modified May 20, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUUT2008-025 | CARPENTER, INCLUDES FORM WORK(EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 |
| SUUT2008-025 | CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 |
| LABO0295-018 | LABORERCOMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.59 | $8.65 |
| LABO0295-018 | LABORERFORMWORKER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 |
| LABO0295-018 | LABORERCHAIN SAW AND POWER DRILL (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 |
| LABO0295-018 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABORERPOWDERMAN (NATURAL GAS PIPELINE CONSTRUCTION ONLY) |
| $21.65 |
| $8.65 |
| LABO0295-018 | LABORERSANDBLASTER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 |
| SUUT2008-025 | LABORERPIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 |
| SUUT2008-025 | LABORERCOMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 |
| SUUT2008-025 | LABORERMASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 |
| ENGI0003-046 | OPERATORPOWER EQUIPMENT (3) BACKHOE/EXCAVATOR. (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $30.78 | $16.09 |
| ENGI0003-054 | OPERATORPOWER EQUIPMENT OILER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $22.03 | $11.88 |
| ENGI0003-054 | OPERATORPOWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $35.68 | $17.57 |
| SUUT2008-025 | OPERATORGRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 |
| SUUT2008-025 | OPERATORLOADER (FRONT END) | $11.38 | $0.00 |
| SUUT2008-025 | OPERATORROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 |
| SUUT2008-025 | OPERATORTRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | $0.00 |
| SUUT2008-025 | TRUCK DRIVER(EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 |
| TEAM0222-020 | TRUCK DRIVERGROUP 1- ARTICULATD END DUMP, LOW BOY, ROLLAGON OR SIMILAR TYPE EQUIPMENT, TRUCK MECHANIC. (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS: LOW BOY AND TRUCK MECHANIC | $46.65 | $15.75 |
| TEAM0222-020 | TRUCK DRIVERGROUP 2- A-FRAME, CHALLENGE (FOR TRANSPORTATION PURPOSES), FORKLIFT, FUEL TRUCK, GIN POLE, RUBBER-TIRED TRACTOR, TANDEM FLOAT (4 & 5 AXLE), TRACK TRUCK/ALL-TRACK DUMPER EQUIPMENT, VACUUM TRUCK, WINCH TRUCK. (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS: STRINGER TRUCK | $46.02 | $15.75 |
| TEAM0222-020 | TRUCK DRIVERGROUP 3- AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS | $41.90 | $15.75 |