Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 6 counties in Utah: Beaver, Emery, Grand, Kane, Piute, Wayne. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUUT2008-033 | CARPENTER, INCLUDES FORM WORK(EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 |
| SUUT2008-033 | CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 |
| SUUT2008-033 | LABORERMASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 |
| SUUT2008-033 | LABORERCOMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $10.92 | $0.00 |
| SUUT2008-033 | LABORERPIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 |
| LABO0295-018 | LABORER CHAIN SAW AND POWER DRILL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $20.85 |
| $8.65 |
| LABO0295-018 | LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDERNATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 |
| LABO0295-018 | LABORER FORMWORKERNATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 |
| LABO0295-018 | LABORER POWDERMANNATURAL GAS PIPELINE CONSTRUCTION ONLY | $21.65 | $8.65 |
| LABO0295-018 | LABORER SANDBLASTERNATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 |
| ENGI0003-046 | OPERATORPOWER EQUIPMENT (3) BACKHOE/EXCAVATOR | $30.78 | $16.09 |
| ENGI0003-054 | OPERATORPOWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 |
| ENGI0003-054 | OPERATORPOWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 |
| SUUT2008-033 | OPERATORGRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 |
| SUUT2008-033 | OPERATORLOADER (FRONT END) | $11.38 | $0.00 |
| SUUT2008-033 | OPERATORROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 |
| SUUT2008-033 | OPERATORTRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | $0.00 |
| SUUT2008-033 | TRUCK DRIVER(EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 |
| TEAM0222-003 | TRUCK DRIVER ZONE 1GROUP 1 | $41.71 | $14.75 |
| TEAM0222-003 | TRUCK DRIVER ZONE 1GROUP 2 | $41.06 | $15.75 |
| TEAM0222-003 | TRUCK DRIVER ZONE 1GROUP 3 | $40.66 | $15.75 |
| TEAM0222-003 | TRUCK DRIVER ZONE 2GROUP 1 | $46.18 | $14.90 |
| TEAM0222-003 | TRUCK DRIVER ZONE 2GROUP 2 | $45.57 | $14.90 |
| TEAM0222-003 | TRUCK DRIVER ZONE 2GROUP 3 | $41.57 | $14.90 |