Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 2 counties in Texas: Rusk, Upshur. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0074-003 | BOILERMAKER | $33.17 | $24.92 |
| SUTX2014-063 | BRICKLAYER | $18.33 | $2.50 |
| SUTX2014-063 | CARPENTER(FORM WORK ONLY) | $13.63 | $0.00 |
| SUTX2014-063 | CARPENTER, EXCLUDES FORM WORK | $25.00 | $0.00 |
| SUTX2014-063 | CEMENT MASON/CONCRETE FINISHER | $13.94 | $0.00 |
| ELEC0301-001 | ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING AND INSTALLATIN OF SOUND AND COMMUNICATION SYSTEMS) | $30.05 | $12.01 |
| SUTX2014-063 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN(COMMUNICATION TECHNICIAN ONLY) |
| $14.00 |
| $2.90 |
| SUTX2014-063 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $14.36 | $2.44 |
| ELEV0021-006 | ELEVATOR MECHANICFOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND VETERANS DAY | $51.93 | $38.44 |
| SUTX2014-063 | INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $19.77 | $7.13 |
| IRON0084-011 | IRONWORKERORNAMENTAL | $28.26 | $8.13 |
| SUTX2014-063 | IRONWORKER, REINFORCING | $12.27 | $0.00 |
| SUTX2014-063 | IRONWORKER, STRUCTURAL | $20.00 | $0.00 |
| SUTX2014-063 | LABORERMASON TENDER - BRICK | $11.36 | $0.00 |
| SUTX2014-063 | LABORERROOF TEAROFF | $11.28 | $0.00 |
| SUTX2014-063 | LABORERPIPELAYER | $12.49 | $2.13 |
| SUTX2014-063 | LABORERCOMMON OR GENERAL | $11.20 | $0.00 |
| SUTX2014-063 | LABORERMASON TENDER - CEMENT/CONCRETE | $10.66 | $0.00 |
| SUTX2014-063 | OPERATORGRADER/BLADE | $15.10 | $1.94 |
| SUTX2014-063 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $15.60 | $0.00 |
| SUTX2014-063 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 |
| SUTX2014-063 | OPERATORBULLDOZER | $14.00 | $0.27 |
| SUTX2014-063 | OPERATORDRILL | $16.22 | $0.34 |
| SUTX2014-063 | OPERATORFORKLIFT | $14.83 | $0.00 |
| SUTX2014-063 | OPERATORLOADER | $12.62 | $2.42 |
| SUTX2014-063 | OPERATORMECHANIC | $17.52 | $3.33 |
| SUTX2014-063 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 |
| SUTX2014-063 | OPERATORROLLER | $12.70 | $0.00 |
| SUTX2014-063 | PAINTERBRUSH, ROLLER, AND SPRAY | $14.45 | $0.00 |
| PLUM0100-006 | PIPEFITTER | $39.76 | $14.04 |
| SUTX2014-063 | PLUMBER | $21.35 | $4.55 |
| ENGI0178-005 | POWER EQUIPMENT OPERATOR((3) HYDRAULIC CRANES 59 TONS AND UNDER) | $32.35 | $13.10 |
| ENGI0178-005 | POWER EQUIPMENT OPERATOR((1) TOWER CRANE) | $32.85 | $13.10 |
| SUTX2014-063 | ROOFER | $13.75 | $0.00 |
| SUTX2014-063 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $22.73 | $7.52 |
| SUTX2014-063 | SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $15.44 | $1.46 |
| SUTX2014-063 | TILE FINISHER | $11.22 | $0.00 |
| SUTX2014-063 | TILE SETTER | $14.74 | $0.00 |
| SUTX2014-063 | TRUCK DRIVERDUMP TRUCK | $12.39 | $1.18 |
| SUTX2014-063 | TRUCK DRIVERSEMI-TRAILER TRUCK | $12.50 | $0.00 |
| SUTX2014-063 | TRUCK DRIVERWATER TRUCK | $12.00 | $4.11 |
| SUTX2014-063 | TRUCK DRIVERFLATBED TRUCK | $19.65 | $8.57 |