Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 3 counties in Texas: Hardin, Jefferson, Orange. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUTX2000-002 | CARPENTERS(FORM BUILDING/FORM SETTING) | $13.15 | $0.00 |
| SUTX2000-002 | CARPENTERSALL OTHER WORK | $13.56 | $0.00 |
| SUTX2000-002 | CONCRETE FINISHER | $13.50 | $0.00 |
| ELEC0479-003 | ELECTRICIAN | $33.76 | $13.56 |
| SUTX2000-002 | LABORERS(COMMON) | $7.41 | $0.00 |
| SUTX2000-002 | LABORERS(PIPELAYER) | $8.29 | $0.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUTX2000-002 |
| PAINTERS(SPRAY AND BRUSH) |
| $12.07 |
| $0.00 |
| SUTX2000-002 | PILEDRIVERMAN | $13.65 | $0.00 |
| SUTX2000-002 | PLUMBER | $18.28 | $4.69 |
| SUTX2000-002 | POWER EQUIPMENT OPERATORS(BACKHOE) | $15.55 | $1.89 |
| SUTX2000-002 | POWER EQUIPMENT OPERATORSBULLDOZER | $15.00 | $0.00 |
| SUTX2000-002 | POWER EQUIPMENT OPERATORSCRANE | $13.77 | $0.00 |
| SUTX2000-002 | POWER EQUIPMENT OPERATORSFRONT END LOADER | $10.63 | $0.00 |
| SUTX2000-002 | POWER EQUIPMENT OPERATORSTRACKHOE | $15.60 | $0.00 |
| SUTX2000-002 | TRUCK DRIVERSDUMP | $10.00 | $0.00 |