Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Texas: El Paso. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUTX2005-015 | CARPENTER, INCLUDES FORM WORK | $12.21 | $0.00 |
| SUTX2005-015 | CEMENT MASON/CONCRETE FINISHER | $9.29 | $0.00 |
| ELEC0583-003 | ELECTRICIANHEAVY CONSTRUCTION (INCLUDING WATER/SEWER LINES) | $27.50 | $9.30 |
| SUTX2005-015 | LABORERS(PIPELAYER) | $8.48 | $0.00 |
| SUTX2005-015 | LABORERS(COMMON) | $7.96 | $0.00 |
| SUTX2005-015 | POWER EQUIPMENT OPERATORBACKHOE | $11.57 | $0.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUTX2005-015 | POWER EQUIPMENT OPERATORFRONT END LOADER | $10.43 | $0.00 |
| SUTX2005-015 | POWER EQUIPMENT OPERATORGRADER | $11.19 | $0.00 |
| SUTX2005-015 | TRUCK DRIVER | $9.17 | $0.00 |