Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Tennessee: Hamblen. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0086-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.17 | $18.82 |
| SUTN2017-032 | BRICKLAYER | $20.00 | $0.00 |
| SUTN2017-032 | CARPENTER | $19.01 | $2.77 |
| SUTN2017-032 | CEMENT MASON/CONCRETE FINISHER | $22.67 | $4.11 |
| SUTN2017-032 | ELECTRICIAN | $23.35 | $10.34 |
| IRON0492-001 | IRONWORKERORNAMENTAL | $35.32 | $17.02 |
| IRON0492-001 | IRONWORKER, REINFORCING | $35.32 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $17.07 |
| SUTN2017-032 | IRONWORKER, STRUCTURAL | $17.30 | $0.00 |
| LABO0818-005 | LABORERPIPELAYER | $21.45 | $8.06 |
| SUTN2017-032 | LABORERMASON TENDER - CEMENT/CONCRETE | $13.00 | $0.00 |
| SUTN2017-032 | LABORERCOMMON OR GENERAL | $13.04 | $0.00 |
| SUTN2017-032 | LABORERMASON TENDER - BRICK | $13.54 | $0.00 |
| SUTN2017-032 | LABORER DEMOLITION | $16.74 | $0.00 |
| SUTN2017-032 | LABORER GRADE CHECKER | $13.01 | $0.00 |
| SUTN2017-032 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $14.70 | $0.00 |
| SUTN2017-032 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.17 | $0.00 |
| SUTN2017-032 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $16.84 | $0.00 |
| SUTN2017-032 | OPERATORBULLDOZER | $28.49 | $9.73 |
| SUTN2017-032 | OPERATORDRILL | $26.50 | $4.76 |
| SUTN2017-032 | OPERATORFORKLIFT | $15.00 | $0.00 |
| SUTN2017-032 | OPERATORROLLER | $14.35 | $0.00 |
| SUTN2017-032 | PAINTER(BRUSH AND ROLLER) | $19.31 | $10.15 |
| PLUM0102-001 | PIPEFITTER | $36.00 | $17.02 |
| SUTN2017-032 | PLUMBER | $21.63 | $7.16 |
| ENGI0917-004 | POWER EQUIPMENT OPERATORCRANE | $36.25 | $13.40 |
| SUTN2017-032 | ROOFER | $16.29 | $0.00 |
| SUTN2017-032 | SHEET METAL WORKER | $22.87 | $6.58 |
| SUTN2017-032 | TILE FINISHER | $14.00 | $0.00 |
| SUTN2017-032 | TILE SETTER | $19.65 | $0.00 |
| SUTN2017-032 | TRUCK DRIVERDUMP TRUCK | $14.00 | $0.00 |