Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in South Dakota: Todd. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0034-007 | ASBESTOS WORKER/HEAT & FROST INSULATOR(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $55.34 | $34.03 |
| BRSD0004-003 | BRICKLAYER | $33.58 | $4.60 |
| SUSD2012-015 | CARPENTER | $16.99 | $0.00 |
| SUSD2012-015 | CEMENT MASON/CONCRETE FINISHER | $20.67 | $11.85 |
| ELEC0426-002 | ELECTRICIAN | $36.32 | $16.83 |
| IRON0021-018 | IRONWORKER, STRUCTURAL | $30.80 | $15.48 |
| SUSD2012-015 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $15.14 |
| $0.00 |
| SUSD2012-015 | LABORERMASON TENDER - BRICK | $14.19 | $0.00 |
| SUSD2012-015 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.00 |
| SUSD2012-015 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $21.08 | $0.00 |
| SUSD2012-015 | PAINTERBRUSH, ROLLER, AND SPRAY | $18.80 | $4.99 |
| SUSD2012-015 | PLUMBER | $14.02 | $1.90 |
| ENGI0049-009 | POWER EQUIPMENT OPERATOR((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM TO THE TOP OF THE SHEAVE OR JIB SHEAVE. TOWER CRANE PREMIUM: FROM THE TOP OF THE TOWER CRANE FOUNDATION TO THE TOP OF THE TOWER CRANE APEX. IN THE CASE OF LUFFING CRANES, TO THE TOP OF GANTRY, PLUS BOOM LENGTH PER CLASSIFICATION: 250' TO 299' - $1.00 300' TO 349 - $1.50 350' TO 399' - $2.00 400' TO 449' - $2.50 450' AN | $34.08 | $18.71 |
| ENGI0049-009 | POWER EQUIPMENT OPERATOR((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM TO THE TOP OF THE SHEAVE OR JIB SHEAVE. TOWER CRANE PREMIUM: FROM THE TOP OF THE TOWER CRANE FOUNDATION TO THE TOP OF THE TOWER CRANE APEX. IN THE CASE OF LUFFING CRANES, TO THE TOP OF GANTRY, PLUS BOOM LENGTH PER CLASSIFICATION: 250' TO 299' - $1.00 300' TO 349 - $1.50 350' TO 399' - $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 | $34.38 | $18.71 |
| SUSD2012-015 | ROOFER | $14.35 | $2.14 |
| SUSD2012-015 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $20.41 | $9.64 |