Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 4 counties in Rhode Island: Bristol, Kent, Providence, Washington. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SURI1999-002 | BRICKLAYER | $20.45 | $11.40 |
| SURI1999-002 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, & METAL STUD FRAMING) | $15.32 | $9.65 |
| SURI1999-002 | CEMENT MASON/FINISHER | $20.45 | $11.40 |
| SURI1999-002 | DRYWALL FINISHER/TAPER | $20.55 | $8.50 |
| ELEC0099-004 | ELECTRICIAN FOOTNOTEWORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FEET OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL | $42.09 | $17.92 |
| ELEV0039-002 | ELEVATOR MECHANIC FOOTNOTESA. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $64.52 |
| $38.44 |
| SURI1999-002 | FLOOR LAYERCARPET | $15.62 | $9.65 |
| SURI1999-002 | INSULATOR - BATT | $19.56 | $9.65 |
| ASBE0006-009 | INSULATOR - PIPE & PIPEWRAPPER(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $49.91 | $36.63 |
| SURI1999-002 | LABORER(UNSKILLED, LANDSCAPE, & BRICK MASON TENDER) | $18.47 | $8.10 |
| SURI1999-002 | PAINTER(BRUSH AND ROLLER) | $20.55 | $8.50 |
| SURI1999-002 | PLASTERER | $13.50 | $2.45 |
| SURI1999-002 | PLUMBER | $23.96 | $8.95 |
| ENGI0057-004 | POWER EQUIPMENT OPERATORPAVER A. FOOTNOTES: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL | $40.82 | $28.25 |
| ENGI0057-004 | POWER EQUIPMENT OPERATORGRADER AND ROLLER A. FOOTNOTES: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL | $39.90 | $28.25 |
| SURI1999-002 | POWER EQUIPMENT OPERATOR(BACKHOE) | $20.27 | $8.98 |
| ROOF0033-002 | ROOFER | $47.49 | $31.44 |
| SURI1999-002 | SPRINKLER FITTER | $24.24 | $9.81 |