Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Puerto Rico: San Sebastian. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUPR2019-020 | CARPENTER | $8.69 | $0.70 |
| SUPR2019-020 | CEMENT MASON/CONCRETE FINISHER | $8.52 | $0.58 |
| ELEC0222-003 | ELECTRICIAN(LINEPERSON) | $45.80 | $19.27 |
| SUPR2019-020 | ELECTRICIAN | $10.19 | $1.07 |
| SUPR2019-020 | IRONWORKER, STRUCTURAL | $8.25 | $0.59 |
| SUPR2019-020 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $8.85 | $0.00 |
| SUPR2019-020 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABORERCOMMON OR GENERAL |
| $7.82 |
| $0.88 |
| SUPR2019-020 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $10.41 | $3.15 |
| SUPR2019-020 | OPERATORROLLER | $9.31 | $3.14 |
| SUPR2019-020 | OPERATORCRANE | $12.11 | $0.91 |
| SUPR2019-020 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $9.48 | $0.80 |
| SUPR2019-020 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $9.38 | $0.65 |
| SUPR2019-020 | OPERATORBULLDOZER | $10.82 | $0.90 |
| SUPR2019-020 | OPERATOREQUIPMENT GREASER ( GREASE TRUCK) | $9.54 | $1.15 |
| SUPR2019-020 | OPERATORGRADER/BLADE | $12.53 | $1.25 |
| SUPR2019-020 | OPERATORMECHANIC | $10.19 | $0.94 |
| SUPR2019-020 | TRAFFIC CONTROLFLAGGER | $8.27 | $0.57 |
| SUPR2019-020 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $9.81 | $0.95 |
| SUPR2019-020 | TRUCK DRIVERDUMP TRUCK | $9.17 | $0.60 |
| SUPR2019-020 | TRUCK DRIVERPICKUP TRUCK | $9.12 | $0.46 |