Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Puerto Rico: San Juan. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUPR2019-019 | CARPENTER | $8.81 | $0.63 |
| SUPR2019-019 | CEMENT MASON/CONCRETE FINISHER | $8.91 | $0.53 |
| ELEC0222-003 | ELECTRICIAN(LINEPERSON) | $45.80 | $19.27 |
| SUPR2019-019 | ELECTRICIAN | $8.80 | $1.01 |
| SUPR2019-019 | HIGHWAY/PARKING LOT STRIPINGLABORER | $8.25 | $0.56 |
| SUPR2019-019 | IRONWORKER, STRUCTURAL | $8.25 | $0.57 |
| SUPR2019-019 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $8.25 |
| $0.38 |
| SUPR2019-019 | LABORERCOMMON OR GENERAL | $8.19 | $0.58 |
| SUPR2019-019 | OPERATORROLLER | $8.68 | $3.14 |
| SUPR2019-019 | OPERATORBULLDOZER | $10.88 | $0.91 |
| SUPR2019-019 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $10.37 | $0.71 |
| SUPR2019-019 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $9.65 | $0.73 |
| SUPR2019-019 | OPERATORCRANE | $12.11 | $0.91 |
| SUPR2019-019 | OPERATOREQUIPMENT GREASER ( GREASE TRUCK) | $9.54 | $1.15 |
| SUPR2019-019 | OPERATORGRADER/BLADE | $12.53 | $1.25 |
| SUPR2019-019 | OPERATORMECHANIC | $10.19 | $0.94 |
| SUPR2019-019 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $10.88 | $3.15 |
| SUPR2019-019 | TRAFFIC CONTROLFLAGGER | $8.28 | $0.53 |
| SUPR2019-019 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $9.81 | $0.95 |
| SUPR2019-019 | TRUCK DRIVERDUMP TRUCK | $9.25 | $0.61 |
| SUPR2019-019 | TRUCK DRIVERPICKUP TRUCK | $9.36 | $0.48 |