Revision 5 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Pennsylvania: Mercer. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 5). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUPA2011-055 | ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $30.55 | $20.04 |
| BOIL0154-007 | BOILERMAKER | $48.28 | $33.17 |
| BRPA0009-053 | BRICKLAYER(INCLUDING POINTING, CAULKING, AND CLEANING) | $34.73 | $24.14 |
| CARP0142-016 | CARPENTER(ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING-CARPET AND VINYL ONLY) | $35.94 | $19.02 |
| CARP0268-006 | CARPENTER(INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK; EXCLUDES FLOOR LAYING- CARPET, VINYL; AND ACOUSTICAL CEILING INSTALLATION) | $35.94 | $19.02 |
| PLAS0526-015 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CEMENT MASON/CONCRETE FINISHER |
| $31.77 |
| $21.89 |
| ELEC0712-012 | ELECTRICIAN(INCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING) | $51.45 | $29.77 |
| PAIN0751-002 | GLAZIER | $25.40 | $25.47 |
| IRON0003-024 | IRONWORKER(METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION ONLY) | $33.57 | $32.23 |
| IRON0207-013 | IRONWORKER(ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL) | $36.26 | $28.16 |
| LABO0125-006 | LABORER(MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 |
| LABO0964-004 | LABORERMASON TENDER-BRICK | $22.88 | $18.97 |
| LABO0964-004 | LABORERCOMMON OR GENERAL | $22.73 | $18.97 |
| BRPA0009-053 | MASON - STONE | $34.73 | $24.14 |
| CARP0443-004 | MILLWRIGHT | $43.00 | $23.44 |
| PAIN0057-001 | PAINTERBRUSH AND ROLLER ONLY | $30.56 | $23.72 |
| PAIN0057-001 | PAINTERDRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 |
| PAIN0549-003 | PAINTERSPRAY ONLY | $27.12 | $24.89 |
| CARP0274-003 | PILEDRIVERMAN | $43.13 | $23.42 |
| PLUM0449-006 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $48.15 | $29.17 |
| PLUM0027-006 | PLUMBER | $46.98 | $25.47 |
| ENGI0066-003 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, COMPACTOR, CRANE*, DRILL, GRADALL, GRADER/BLADE, MECHANIC, FORKLIFT( LULL) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $41.69 | $24.05 |
| ENGI0066-003 | POWER EQUIPMENT OPERATORBOBCAT/SKIDSTEER/SKID LOADER, DRILL RIG CAISSON, HIGHLIFT, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $41.69 | $24.05 |
| ENGI0066-003 | POWER EQUIPMENT OPERATORHOIST, PUMP, FORKLIFT (RIDDEN OR SELF-PROPELLED) BACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, COMPACTOR, CRANE*, DRILL, GRADALL, GRADER/BLADE, MECHANIC, FORKLIFT( LULL), ROLLER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $35.62 | $24.05 |
| ENGI0066-003 | POWER EQUIPMENT OPERATORLOADER | $41.69 | $24.05 |
| ENGI0066-003 | POWER EQUIPMENT OPERATOROILER | $32.83 | $24.05 |
| ROOF0210-007 | ROOFER(EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $36.70 | $18.09 |
| SUPA2011-055 | ROOFERWATERPROOFING ONLY | $26.77 | $12.57 |
| SHEE0012-014 | SHEET METAL WORKER(INCLUDES HVAC DUCT AND METAL FLASHING INSTALLATION) | $39.50 | $30.79 |
| SFPA0669-004 | SPRINKLER FITTER(FIRE SPRINKLERS) | $49.75 | $30.26 |
| BRPA0009-011 | TILE FINISHER | $28.76 | $17.16 |
| BRPA0009-011 | TILE SETTER | $35.64 | $21.63 |
| SUPA2011-055 | TRUCK DRIVERDUMP TRUCK | $23.36 | $7.60 |