Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Pennsylvania: Lycoming. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0038-006 | ASBESTOS WORKER/HEAT & FROST INSULATOR(MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $39.18 | $26.07 |
| BOIL0013-008 | BOILERMAKER | $55.00 | $35.48 |
| BRPA0005-065 | BRICKLAYER(INCLUDING POINTING, CAULKING, AND CLEANING) | $31.35 | $13.85 |
| CARP0081-009 | CARPENTER(ACOUSTICAL CEILING INSTALLER ONLY) | $36.84 | $20.19 |
| CARP0287-013 | CARPENTER(INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING; EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $36.84 | $20.19 |
| ELEC0607-010 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN(ALARM INSTALLATION ONLY) |
| $35.93 |
| $28.46 |
| ELEC0812-017 | ELECTRICIAN(INCLUDES HVAC/TEMPERATURE CONTROLS INSTALLATION, LOW VOLTAGE WIRING; EXCLUDES ALARM INSTALLATION ONLY) | $38.50 | $26.46 |
| ELEV0059-004 | ELEVATOR MECHANIC FOOTNOTESA. EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% OF BASIC HOURLY RATE FOR LESS THAN 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $58.70 | $38.44 |
| IRON0404-029 | IRONWORKER(ORNAMENTAL & REINFORCING) | $37.26 | $32.63 |
| IRON0404-016 | IRONWORKER, STRUCTURAL | $37.26 | $32.63 |
| LABO1180-017 | LABORER(FORKLIFT (MASONRY WORK ONLY)) | $28.41 | $17.18 |
| LABO1180-017 | LABORERMASON TENDER-BRICK | $26.91 | $17.18 |
| LABO1180-017 | LABORER(COMMON OR GENERAL; CONCRETE SAW (WALK BEHIND/HAND HELD)) | $22.61 | $17.18 |
| BRPA0005-065 | MASON - STONE | $31.35 | $13.85 |
| CARP0443-003 | MILLWRIGHT | $43.00 | $23.44 |
| SUPA2011-054 | OPERATORGRADALL | $32.70 | $18.43 |
| SUPA2011-054 | OPERATORDRILL | $28.55 | $15.78 |
| SUPA2011-054 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | $18.37 |
| SUPA2011-054 | OPERATORGRADER/BLADE | $32.51 | $17.98 |
| PAIN0041-002 | PAINTER(BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING/TAPING) | $27.95 | $16.12 |
| PLUM0520-021 | PIPEFITTER(INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION) | $41.36 | $29.45 |
| PLUM0520-020 | PLUMBER | $41.36 | $29.45 |
| ENGI0066-046 | POWER EQUIPMENT OPERATOR(PUMP) | $28.36 | $18.10 |
| ENGI0542-039 | POWER EQUIPMENT OPERATOR(OILER) | $39.42 | $29.30 |
| ENGI0542-039 | POWER EQUIPMENT OPERATOR(HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | $41.88 | $30.03 |
| ENGI0542-039 | POWER EQUIPMENT OPERATOR(BACKHOE/ EXCAVATOR/ TRACKHOE, BOBCAT/ SKID/ STEER/ SKID LOADER, BULLDOZER, HOIST (WITH TWO TOWERS), MECHANIC, LOADER, FORKLIFT (20 FT AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | $30.83 |
| ROOF0030-017 | ROOFER(EXCLUDES WATERPROOFING) | $34.25 | $21.89 |
| SUPA2011-054 | ROOFERWATERPROOFING ONLY | $28.60 | $18.02 |
| SHEE0044-009 | SHEET METAL WORKER(INCLUDES HVAC DUCT AND SIDING INSTALLATION - METAL/ALUMINUM/VINYL) | $36.13 | $30.32 |
| SFPA0669-004 | SPRINKLER FITTER(FIRE SPRINKLERS) | $49.75 | $28.96 |
| BRPA0005-070 | TILE FINISHER | $27.63 | $13.94 |
| BRPA0005-070 | TILE SETTER | $32.85 | $17.56 |
| SUPA2011-054 | TRUCK DRIVERDUMP TRUCK | $23.36 | $7.60 |