Revision 3 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Pennsylvania: Carbon. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 3). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0023-008 | ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 |
| BOIL0013-008 | BOILERMAKER | $55.00 | $35.48 |
| BRPA0005-068 | BRICKLAYER(INCLUDING POINTING, CAULKING, AND CLEANING) | $33.24 | $17.78 |
| CARP0167-003 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FIRESTOPPING, FORM WORK, METAL FLASHING INSTALLATION, METAL ROOF INSTALLATION, SCAFFOLD BUILDING (EXCLUDING MASONRY/BRICK), SIDING INSTALLATION- METAL, ALUMINUM AND VINYL; EXCLUDING FLOOR LAYING- HARDWOOD, CARPET AND VINYL) | $39.74 | $28.09 |
| CARP0251-009 | CARPENTER(FLOOR LAYING- HARDWOOD, CARPET AND VINYL ONLY) | $41.23 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $29.79 |
| SUPA2011-039 | CEMENT MASON/CONCRETE FINISHER | $24.55 | $16.19 |
| ELEC0375-011 | ELECTRICIAN(INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, LOW VOLTAGE WIRING, AND SOLAR PANEL WIRING AND INSTALLATION) | $50.00 | $25.93 |
| ELEV0084-005 | ELEVATOR MECHANIC FOOTNOTESA. VACATION CREDIT: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $61.41 | $38.44 |
| SUPA2011-039 | GLAZIER | $29.22 | $15.73 |
| IRON0404-020 | IRONWORKERORNAMENTAL | $37.26 | $32.63 |
| SUPA2011-039 | IRONWORKER, REINFORCING | $26.24 | $14.49 |
| SUPA2011-039 | IRONWORKER, STRUCTURAL | $33.55 | $21.92 |
| LABO1174-012 | LABORER(FORKLIFT (MASONRY WORK ONLY); SCAFFOLD BUILDER (BRICK AND MASONRY); MASON TENDER-BRICK) | $26.74 | $17.34 |
| LABO1174-012 | LABORER(CONCRETE WORKER; TAMPER (HAND HELD)) | $25.39 | $17.34 |
| LABO1174-012 | LABORER(PLASTER TENDER) | $26.74 | $17.34 |
| SUPA2011-039 | LABORERCOMMON OR GENERAL | $23.55 | $8.67 |
| BRPA0005-068 | MASON - STONE | $33.24 | $17.78 |
| CARP0219-006 | MILLWRIGHT | $51.22 | $36.72 |
| SUPA2011-039 | OPERATORDRILL | $28.55 | $15.78 |
| SUPA2011-039 | OPERATORGRADALL | $32.70 | $18.43 |
| SUPA2011-039 | OPERATORGRADER/BLADE | $32.51 | $17.98 |
| SUPA2011-039 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $33.01 | $18.37 |
| PAIN1269-001 | PAINTER(DRYWALL FINISHING/TAPING ONLY) | $27.01 | $16.30 |
| PAIN1269-001 | PAINTERBRUSH, ROLLER, AND SPRAY | $26.45 | $16.30 |
| PLUM0420-011 | PIPEFITTERINCLUDING HVAC PIPE INSTALLATION | $59.65 | $42.78 |
| PLUM0420-014 | PLUMBER(HVAC MECHANIC- HVAC TEMPERATURE CONTROLS INSTALLATION ONLY) | $59.65 | $42.78 |
| PLUM0690-012 | PLUMBER | $56.28 | $35.51 |
| ENGI0066-046 | POWER EQUIPMENT OPERATOR(PUMP) | $28.36 | $18.10 |
| ENGI0542-035 | POWER EQUIPMENT OPERATOR(HOIST (SINGLE DRUM), FORKLIFT (UNDER 20 FT, EXCLUDES MASONRY WORK)) | $32.23 | $22.68 |
| ENGI0542-035 | POWER EQUIPMENT OPERATORCRANE | $37.49 | $24.23 |
| ENGI0542-035 | POWER EQUIPMENT OPERATOR(COMPRESSOR) | $31.09 | $22.35 |
| ENGI0542-035 | POWER EQUIPMENT OPERATOR(BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID/STEER/SKID LOADER,BOOM, BULLDOZER, CONCRETE PUMP, HOIST (WITH TWO TOWERS), MECHANIC, ROLLER (HIGH GRADE FINISHING), DRILL RIG CAISSONS, HEAT PLANER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $34.96 | $23.48 |
| ENGI0542-035 | POWER EQUIPMENT OPERATORROLLER | $31.09 | $22.35 |
| ENGI0542-035 | POWER EQUIPMENT OPERATOR(OILER) | $29.77 | $21.95 |
| ROOF0030-012 | ROOFER(EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $40.33 | $32.62 |
| SUPA2011-039 | ROOFERWATERPROOFING ONLY | $28.60 | $18.02 |
| SHEE0019-014 | SHEET METAL WORKEREXCLUDING HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $43.09 | $42.52 |
| SHEE0044-008 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $36.13 | $30.32 |
| SFPA0669-004 | SPRINKLER FITTER(FIRE SPRINKLERS) | $49.75 | $30.26 |
| BRPA0005-075 | TILE FINISHER | $30.20 | $16.41 |
| BRPA0005-075 | TILE SETTER | $31.12 | $21.11 |
| SUPA2011-039 | TRUCK DRIVERDUMP TRUCK | $23.36 | $7.60 |